Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20076G544 + (07:39:33, 15 December 2024)
- RC-94-0264, Forwards Completed Operator Licensing Exam & Requalification Schedules for Vsns,Estimating Exams Through FY98,in Response to Administrative Ltr 94-12.Info Requested for Generic Fundamentals Exam Also Provided + (07:39:33, 15 December 2024)
- PY-CEI-NRR-1853, Requests Cancellation of Sol SOP-30455-2,held by Js Mikolaj. Mikolaj Reassigned to Position for Which Current Sol Not Needed + (07:39:35, 15 December 2024)
- ML20076G540 + (07:39:35, 15 December 2024)
- 05000293/LER-1983-041-03, /03L-0:on 830713 & 15,latch on Fire Doors 162 & 105,respectively,found Inoperable.Caused by Normal Wear. One Latch Mechanism Required Adjustment.Second Latch Replaced + (07:39:37, 15 December 2024)
- RC-94-0267, Responds to Violations Noted in Insp Rept 50-395/94-19. Corrective Actions:Sys Operating Procedure 119, Waste Gas Processing, Revised on 940902 to Verify Proper Position of Sys Valves Prior to Tank Release + (07:39:38, 15 December 2024)
- ML20076G499 + (07:39:38, 15 December 2024)
- BSEP-83-1438, Ack Receipt of IE Insp Repts 50-324/83-05 & 50-325/83-05 & Notice of Violation.Response to Rept Will Be Submitted by 830520 + (07:39:39, 15 December 2024)
- ML20076G491 + (07:39:40, 15 December 2024)
- ML20076G487 + (07:39:41, 15 December 2024)
- ML20076G482 + (07:39:42, 15 December 2024)
- 05000361/LER-1983-041-07, /07L-0:on 830429,documentation Could Not Be Located Indicating Operability Testing,Including Testing Required by Inservice Insp & Testing Program.Caused by Inadequate Administrative Controls + (07:39:43, 15 December 2024)
- LD-83-050, Part 21 Rept Supplementing 830506 Notification of Potential Significant Safety Hazard Re Matl Defects in Stainless Steel Tubing Pressure Boundary Component.Ultrasonic Exam Shows Assemblies Acceptable Per ASME Code,Section III + (07:39:44, 15 December 2024)
- ML20076G470 + (07:39:45, 15 December 2024)
- BSEP-83-1417, Responds to NRC Re Violations Noted in IE Insp Repts 50-324/83-05 & 50-325/83-05.Corrective Actions: Operating Procedures Revised to Accurately Reflect Desired Position of Fuel Oil Manual Fill Valves + (07:39:46, 15 December 2024)
- ML20076G465 + (07:39:46, 15 December 2024)
- ML20076G463 + (07:39:47, 15 December 2024)
- ML20076G457 + (07:39:47, 15 December 2024)
- B15008, Provides Response to Violations Noted in Insp Rept 50-423/94-21.Corrective Actions:Review of Design Documents Indicates That Groundwater Observations Made at Site Prior to & During Const + (07:39:48, 15 December 2024)
- 0CAN088304, Forwards Rev 5 to Industrial Security Plan.Rev Withheld (Ref 10CFR2.790) + (07:39:49, 15 December 2024)
- ML20076G443 + (07:39:50, 15 December 2024)
- ML20076G441 + (07:39:50, 15 December 2024)
- ML20076G433 + (07:39:51, 15 December 2024)
- ML20076G439 + (07:39:51, 15 December 2024)
- ML20076G431 + (07:39:52, 15 December 2024)
- ML20076G427 + (07:39:54, 15 December 2024)
- ML20076G417 + (07:39:55, 15 December 2024)
- ML20076G423 + (07:39:55, 15 December 2024)
- ML20076G409 + (07:39:57, 15 December 2024)
- ML20076G411 + (07:39:57, 15 December 2024)
- ML20076G406 + (07:39:58, 15 December 2024)
- ML20076G405 + (07:39:59, 15 December 2024)
- PY-CEI-NRR-0049, Forwards Response to R Bimber Ltr Re Salt Cavity Storage Area.Encl FSAR Changes Will Be Incorporated Into Future FSAR Amend + (07:40:00, 15 December 2024)
- ML20076G404 + (07:40:00, 15 December 2024)
- ML20076G400 + (07:40:01, 15 December 2024)
- ML20076G395 + (07:40:02, 15 December 2024)
- ML20076G394 + (07:40:02, 15 December 2024)
- ML20076G381 + (07:40:03, 15 December 2024)
- ML20076G391 + (07:40:03, 15 December 2024)
- ML20076G380 + (07:40:04, 15 December 2024)
- RBG-40935, Responds to Violations Noted in Insp Rept 50-458/94-18. Corrective Actions:Relief Valve 1E22 RVF039 Was Verified to Have Been Seated & Leak Tight by Evidence of Sys Pressure Observed on Other Valves within Test Boundary + (07:40:05, 15 December 2024)
- ML20076G374 + (07:40:05, 15 December 2024)
- ML20076G366 + (07:40:06, 15 December 2024)
- ML20076G367 + (07:40:06, 15 December 2024)
- ML20076G361 + (07:40:07, 15 December 2024)
- L-83-319, Forwards Schedule for Completion of Responses to IE Bulletin 80-11, Masonry Wall Design. Required Mods to Masonry Walls Will Be Completed Prior to Completion of First Refueling Outage.Item Closed + (07:40:08, 15 December 2024)
- ML20076G351 + (07:40:09, 15 December 2024)
- ML20076G348 + (07:40:10, 15 December 2024)
- ML20076G344 + (07:40:11, 15 December 2024)
- ML20076G343 + (07:40:12, 15 December 2024)
- ML20076G339 + (07:40:13, 15 December 2024)
- ML20076G331 + (07:40:14, 15 December 2024)