ML20076G417

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Sept 1994 for San Onofre Nuclear Generating Station Units 2 & 3
ML20076G417
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 10/14/1994
From: Marsh W
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20076G421 List:
References
NUDOCS 9410190316
Download: ML20076G417 (1)


Text

'

e 0

Southem Califomia Edison Company 23 PARKER STREET IRVINE, CALIFORNIA 92718 October 14, 1994 WALTER C. MARSH

,m,4cN, BAANAGF f4 OF NUCLF. Aft F9EGUL ATORf AF F AIRS (714)454 4403 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for September 1994 San Onofre Nuclear Generating Station, Units 2 and 3 Technical Specification 6.9.1.10 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires Edison to provide a Monthly Operating Report for each Unit, which includes: routine operating statistics and shutdown experience; all challenges to safety valves; any changes to the Offsite Dose Calculation Manual (0DCM); and any major changes to the radioactive waste treatment system. All covered activities are reported monthly, except for ODCM changes, which are reported within 90 days from the time the changes are effective.

t This letter transmits the September 1994 Monthly Operating Reports for Units 2 and 3, respectively. There were no challenges to safety valves, and no major changes to the Units 2 and 3 radioactive waste treatment systems during the reporting period.

If you require any additional information, please let me know.

Sincerely, b

Q 4

d Enclosures cc:

L. J. Callan, Regional Administrator, NRC Region IV A. B. Beach, Director, Division of Reactor Projects, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV M. B. Fields, NRC Project Manager, Units 2 and 3 J. A. Sloan, Senior NRC Resident Inspector, San Onofre Units 1, 2 & 3 i 9f: Fr 9410190316 941014 PDR ADOCK 05000361

!fn

'g$

R PDR

/

'