Text
_ _ _ _ _ _ _
- sNIRdk.
l M
Teiepnone si2pss4ooo Nuclear Division P.o. Box 4 May 31, 1983 Shippingport, PA 150774004 Director of Nuclear Reactor Regulation United States Nuclear Pegulatory Commission Attn:
Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Washington, DC 20555
Reference:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Information Copy - Technical Specification Change Request No. 34, Revision 1 Centlemen:
Attached is an information copy of a revision to our submittal dated October 4,1978 concerning the Reactor Vessel Overpressure Pra-tection System for BVPS-1 at low temperatures. We have incorporated the appropriate revisions to comply with the Safety Evaluation attached to your letter dated April 4, 1983.
We have not incorporated the first statement of Section C - Administrative Controls, to require a steam bubble be established in the pressurizer prior to reactor coolant pump startup at RCS temperatures above 160*F.
This requirement has no bear-ing on the overpressure protection system relative to overpressure events due to the heat input case and would not enhance the ability of the system to mitigate an overpressure event. The requirement to obtain 160*F in the RCS is presently required by procedures and appears to have been inserted in the SER on that basis. This sebmittal is provided so that you may begin your review of our proposed changes.
Our OSC and ORC have not reviewed these proposed changes.
When the Duquesne Light Company reviews are complete, we will clearly identify any changes that may be required to this submittal and formally submit our request for Technical Specification Change.
Included with this package are two copies of pages 3/4 5-7 and B 3/4 5-1.
The first of each page is labeled page A and the second page B.
The page A copy is our present specifications with the over-pressure protection revisions incorporated. The page B copy is from our submittal of Change Request No. 79 and incorporates these over-pressure protection revisions. Therefore, if Change Request No. 34 Revision 1 is approved prior to Change Request No. 79 approval, the page A copy should be included with that amendment.
if Change Request No. 79 is approved before the No. 34 Revision 1 change, then the page B copy should be included witt. the amendment. The page A copy will then be no longer required.
8306140639 830531 Lg DR ADOCK 05000334 O
\\\\
I
. Beever Valley Power Station, Unit No.1 i
Docket No. 50-334, License No. DPR-66 Information Copy - Technical Specification Change Request No. 34, Revision 1 Page 2 Specification 3.1.2.3, page 3/4 1-11, has been revised to incorporate l
overpressure protection requirements and also includes revisions to permit the use of a Low Head Safety Injection pump in lieu of the operable charging pump (in Modes 5 and 6), when the RCS is in a vented condition. This will allow the charging pumps to be out-of-service for i
maintenance in Modes 5 and 6 and is also discussed in the BASES page B3/4 1-2.
Very truly ours, J. J. Carey Vice President, Nuclear cc:
Mr. Peter Tam, Project Manager U. S. Nuclear Regulatory Commission Phillips Building Washington, DC 20555
- Mail Stop 438 Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 1
^
U. S. Nuclear Regulatory Commission c/o Document Management Branch Washington, DC 20555 i
i
(
1 s
-~.
,.,--