Letter Sequence Other |
|---|
|
|
MONTHYEARIR 05000285/19920291992-12-0707 December 1992 Insp Rept 50-285/92-29 on 921011-1121.No Violations or Deviations Noted.Major Areas Inspected:Followup of Events, Operational Safety Verification,Maintenence & Surveillance Observations & Followup on C/A on Previous Violations Project stage: Request ML20128E8921993-01-21021 January 1993 Forwards Notice of Consideration of Issuance of Amend to License DPR-40 & Proposed NSHC Determination & Opportunity for Hearing on 921207 Request to Revise TS to Allow Fuel Rack Storage Capacity in Spent Fuel Pool Project stage: Other ML20128E8131993-02-0404 February 1993 Informs That Addl Info Needed & Commitment to Continue Review of Licensee 921207 Proposed Revs to Amend TS 2.8,3.2 (Table 3-5) Re Spent Fuel Pool Rerack Project stage: Approval LIC-93-0081, Forwards Response to NRC 930204 Request for Addl Info Re Spent Fuel Pool Rerack & Response to 930222 Telcon W/Nrc Re Total person-rem Exposure from 1983/1984 Rerack Project at Facility1993-03-19019 March 1993 Forwards Response to NRC 930204 Request for Addl Info Re Spent Fuel Pool Rerack & Response to 930222 Telcon W/Nrc Re Total person-rem Exposure from 1983/1984 Rerack Project at Facility Project stage: Request ML20035A1741993-03-19019 March 1993 Requests Addl Info & Commitment to Continue Review of Licensee 921207 Proposed Revs to Amend TS 2.8,3.2 (Table 3-5) Re Spent Fuel Pool Rerack Project stage: Approval ML20035C9511993-04-0202 April 1993 Forwards Request for Addl Info Re Plant Spent Fuel Pool Rerack.Response Anticipated within Four Wks Project stage: RAI ML20035E0861993-04-0808 April 1993 Informs of Need to Perform Structural Audit at Us Tool & Die Inc in Pittsburgh,Pa.Representative from Util Requested to Be Present to Answer Questions That Arise at Audit.Agenda Encl Project stage: Other ML20035D1761993-04-0808 April 1993 Forwards Request for Addl Info in Order to Continue Review of Util Proposing Revs to Amend Specifications 2.8,3.2(Table 3-5),4.4.2,5.10.3 & Figure 2-10 of TS Project stage: RAI LIC-93-0105, Forwards Response to Request for Addl Info Re Station Spent Fuel Pool Rerack1993-04-28028 April 1993 Forwards Response to Request for Addl Info Re Station Spent Fuel Pool Rerack Project stage: Request LIC-93-0146, Forwards Response to NRC 930408 Request for Addl Info Re Spent Fuel Pool Rerack,Per NRC 930420 Audit Conducted at Us Tool & Die Facility in Pittsburgh,Pa1993-05-14014 May 1993 Forwards Response to NRC 930408 Request for Addl Info Re Spent Fuel Pool Rerack,Per NRC 930420 Audit Conducted at Us Tool & Die Facility in Pittsburgh,Pa Project stage: Request ML20056E0531993-07-29029 July 1993 Forwards Environ Assessment & Finding of No Significant Impact Re Util 921207 License Amend Request to Change TS to Support Proposed Spent Fuel Pool Rerack.Notice of Issuance Also Encl Project stage: Other ML20056E5381993-08-12012 August 1993 Forwards Amend 155 to License DPR-40 & Safety Evaluation. Amend Changes TS to Increase Fuel Storage Capacity in Spent Fuel Pool to 1083 Fuel Assemblies Project stage: Approval ML20057F7921993-10-13013 October 1993 Forwards Correction to Amend 155 to License DPR-40, Increasing Fuel Storage Capacity in Spent Fuel Pool to 1083 Fuel Assemblies.Page 3-20d Issued W/Words Region I Still in Item 15,which Should Have Been Deleted Project stage: Other LIC-94-0167, Provides Notification of Installation of Spent Fuel Storage Racks1994-08-12012 August 1994 Provides Notification of Installation of Spent Fuel Storage Racks Project stage: Other ML20076G3481994-10-0606 October 1994 Informs That Util Implemented Necessary Actions Associated W/Listed Open TAC Issues.Subject to Agreement by Nrc/Nrr Project Manager,Items Considered Ready to Close Project stage: Other LIC-99-0005, Submits Correction of Spent Fuel Pool time-to-boil Info Used by NRC During Review Which Resulted in Issuance of Amend 155 to License DPR-40.Attachment 2 Provides Corrected Pages for Holtec Licensing Rept1999-01-28028 January 1999 Submits Correction of Spent Fuel Pool time-to-boil Info Used by NRC During Review Which Resulted in Issuance of Amend 155 to License DPR-40.Attachment 2 Provides Corrected Pages for Holtec Licensing Rept Project stage: Other LIC-16-0098, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools2016-11-0202 November 2016 Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Project stage: Other 1993-04-08
[Table View] |
Text
.
555MQ@f?MM9Vi'WA#Eggggg$prm"PPTmmggggpyg$5bS$$$Eis$$E& emE 4cEiB4NM/
fjflj S M M E NNI M $ ssSissf$ - 5sM $iefl$sS B b $$f m e r Me 92se W
_._u___.
Omaha Public Power District 444 South 16th Street Mall Omaha, Nebraska 68102-2247 October 6, 1994 402/636-2000 LIC-94-130 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, DC 20555
Reference:
Docket No. 50-285 Gentlemen:
SUBJECT:
Closure of HRC TAC Issues for Fort Calhoun Station Omaha Public Power District has implemented the necessary actions associated with the open TAC issues listed below.
Subject to agreement by the NRC/NRR Project Manager, these items are considered ready to close.
TAC #
Description / Status 83960 Emergency Diesel Generator Fuel Oil Requirements Amendment 162, Implemented: July 27, 1994 85116 Spent Fuel Pool Rerack Amendment 155, Implemented: August 8, 1994 86687 New 10 CFR 20 Requirements Amendment 164, Implemented: September 22, 1994 88555 GL 93-05 ESF/RPS Surveillance Frequency Amendment 163, Implemented:
September 16, 1994 89915 Raw Water System Hydro Relief Request SER Dated:
September 26, 1994 00 9/110190258 941006 g
PDR ADOCK 05000285 gg P
..PDR 45 512a Employment with Equal Opportunrty
Document Control Desk LIC-94-130 Pag,e 2 Please contact me if you have any questions.
Sincerely, b
W. G. Gates Vice President c:
LeBoeuf, Lamb, Greene & MacRae L. J. Callan, NRC Regional Administrator, Region IV S. D. Bloom, NRC Project Manager R. P. Mullikin, NRC Senior Resident Inspector i
4