Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20079J784 + (04:23:24, 15 December 2024)
- 05000335/LER-1982-060, Forwards LER 82-060/03L-0 + (04:23:25, 15 December 2024)
- ML20079J776 + (04:23:25, 15 December 2024)
- ML20079J774 + (04:23:26, 15 December 2024)
- ML20079J772 + (04:23:26, 15 December 2024)
- 05000416/LER-1982-033-99, /99X-1:on 820814,HPCS Diesel Generator 13 Started on Low Reactor Vessel Level Indication & Tripped on Overspeed.Caused by Faulty Tachometer Relay.Dynalco Relay Replaced & Sys Restored on 820818 + (04:23:28, 15 December 2024)
- ML20079J764 + (04:23:29, 15 December 2024)
- ML20079J760 + (04:23:30, 15 December 2024)
- PLA-1439, Interim Deficiency Rept Re Design Verification of Max Permissible Lengths of Wire in Low Voltage Power & Control Circuits.Caused by Bechtel Failure to Follow Procedures. Final Rept by 830415.Also Reportable Per Part 21 + (04:23:30, 15 December 2024)
- SNRC-1008, Forwards List of Active Safety-Related Equipment at Qualification Level, Per SER Issue 8, Dynamic Qualification & Util 821123 Commitment + (04:23:31, 15 December 2024)
- DCL-84-011, Forwards Attachments A,B & C to Rev 11 to Security Plan. Attachments Withheld (Ref 10CFR73.21) + (04:23:32, 15 December 2024)
- ML20079J752 + (04:23:33, 15 December 2024)
- ML20079J751 + (04:23:33, 15 December 2024)
- ML20079J750 + (04:23:34, 15 December 2024)
- ML20079J748 + (04:23:34, 15 December 2024)
- ML20079J745 + (04:23:35, 15 December 2024)
- ML20079J742 + (04:23:37, 15 December 2024)
- ML20079J741 + (04:23:38, 15 December 2024)
- ML20079J736 + (04:23:38, 15 December 2024)
- ML20079J735 + (04:23:39, 15 December 2024)
- ML20079J733 + (04:23:40, 15 December 2024)
- TXX-3591, Responds to IE Bulletin 82-01,Revision 1,Suppl 1, Alteration of Radiographs of Welds in Piping Subassemblies. All But Six Welds Will Meet Applicable Code Requirements + (04:23:40, 15 December 2024)
- ML20079J730 + (04:23:41, 15 December 2024)
- ML20079J716 + (04:23:42, 15 December 2024)
- ML20079J723 + (04:23:42, 15 December 2024)
- ML20079J711 + (04:23:43, 15 December 2024)
- PLA-1436, Final Deficiency Rept Re Nonconformance of Bechtel Field Welding.Initially Reported on 821115.Training Sessions Conducted Re Welding QC Requirements & Procedures FP-G-24 & FP-W-1 Will Be Revised.Also Reported Per Part 21 + (04:23:44, 15 December 2024)
- ML20079J707 + (04:23:44, 15 December 2024)
- 3F0184-03, Responds to NRC Re Violations Noted in IE Insp Rept 50-302/83-27.Corrective Actions:Rcs Leakage Determination Satisfactorily Completed & Automated Tracking Program for Control Rod 3 Initiated + (04:23:45, 15 December 2024)
- ML20079J706 + (04:23:45, 15 December 2024)
- ML20079J703 + (04:23:46, 15 December 2024)
- ML20079J699 + (04:23:47, 15 December 2024)
- ML20079J698 + (04:23:48, 15 December 2024)
- ML20079J690 + (04:23:48, 15 December 2024)
- ML20079J686 + (04:23:49, 15 December 2024)
- 05000416/LER-1982-048-99, /99X-0:on 820812,discovered Unsealed Fire Barrier Between Two Control Room Cabinets.Caused by Const Oversight. Fire Barrier Sealed by Maint Work Order on 820919 + (04:23:51, 15 December 2024)
- SNRC-1005, Forwards Field Test of Emergency Diesel Generator 101. Data Used by Failure Analysis Assoc in Investigation of Crankshaft Failure on Diesel Generator 102 + (04:23:52, 15 December 2024)
- ML20079J682 + (04:23:52, 15 December 2024)
- 05000395/LER-1983-139-03, /03L-0:on 831214,remote Info Acquisition Cabinet 12 Tripped,Causing Intermediate Bldg Sprinkler Sys to Go Into Alarm Mode.Caused by Water Entering Panel & Shorting Out Electronic Cards.Cards Replaced + (04:23:54, 15 December 2024)
- AECM-84-0025, RO 83-113/0:on 831202,fire-rated Door 1A201 to Turbine Bldg Reported Inoperable.Caused by Damaged Latching Mechanism Due to Heavy Use.Door Restored on 831213 + (04:23:56, 15 December 2024)
- 05000416/LER-1982-134-03, /03L-0:on 821201,during Cold Shutdown,Rhr Loop a Shut Down to Allow Flush of RHR Loop B Piping.Caused by Need to Maintain RHR Loop B for Return to Operation.Rhr Loop a Returned to Svc + (04:23:57, 15 December 2024)
- RBG-16-768, Interim Deficiency Rept DR-121 Re Motor Control Ctr Equipment Supplied by Ite Gould,Inc.Investigation Incomplete.Interim or Final Status Rept Will Be Provided by 840323 + (04:23:58, 15 December 2024)
- ML20079J666 + (04:23:59, 15 December 2024)
- 05000416/LER-1982-134, Forwards LER 82-134/03L-0 + (04:24:03, 15 December 2024)
- 1CAN128207, Application for Amend to License DPR-51,proposing Change to Tech Spec 4.18 Re Steam Generator Tubing Surveillance to Assure That Known Problem Areas Are Adequately Inspected. Class III Amend Fee Encl + (04:24:03, 15 December 2024)
- ML20079J656 + (04:24:04, 15 December 2024)
- ML20079J654 + (04:24:04, 15 December 2024)
- ML20079J652 + (04:24:05, 15 December 2024)
- ML20079J638 + (04:24:07, 15 December 2024)
- ML20079J633 + (04:24:08, 15 December 2024)
- ML20079J632 + (04:24:09, 15 December 2024)
- ML20079J627 + (04:24:10, 15 December 2024)