Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080E989 + (03:17:32, 15 December 2024)
- ML20080E979 + (03:17:33, 15 December 2024)
- ML20080E973 + (03:17:34, 15 December 2024)
- 05000327/LER-1984-005, :on 840109,cold Leg Accumulator 3 Declared Inoperable Due to High Boron Concentration.Cause Not Stated. Accumulator Drained & Diluted + (03:17:35, 15 December 2024)
- 05000250/LER-1984-002, :on 840108,reactor Trip Occurred Due to Initiation of Safety Injection.Caused by Excessive Steam Usage in Secondary Sys & Steam Leakage Through Steam Supply Valves.Equipment Upgraded + (03:17:38, 15 December 2024)
- ML20080E952 + (03:17:39, 15 December 2024)
- AECM-83-0578, Forwards Rev 0 to Pump & Valve Inservice Insp Program + (03:17:41, 15 December 2024)
- ML20080E940 + (03:17:46, 15 December 2024)
- NLS8400026, Responds to NRC Re Violations & Deviations Noted in IE Insp Rept 50-298/83-26.Corrective Actions:Refresher Training Administered for Design Initiation & Review of Governing Procedures for Design Changes + (03:17:47, 15 December 2024)
- ML20080E937 + (03:17:47, 15 December 2024)
- ML20080E933 + (03:17:48, 15 December 2024)
- ML20080E928 + (03:17:48, 15 December 2024)
- 05000272/LER-1984-002, :on 840107,inlet Valve 13CN27 Closed Due to Spurious High Level in Feedwater Heater 15C.Caused by Heater Bypass 1CN47 Failing to Open.Bypass Differential Setpoint Lowered & Signal Summator Module Replaced + (03:17:50, 15 December 2024)
- ML20080E893 + (03:17:51, 15 December 2024)
- NRC-94-0145, Comment Supporting Proposed Rule 10CFR50 Re Shutdown & Low Power Operations for Np Reactors.All Util Outages Currently Controlled by Defense in Depth Philosophy Implemented by Operations & Work Control Group + (03:17:52, 15 December 2024)
- ML20080E884 + (03:17:53, 15 December 2024)
- ML20080E876 + (03:17:54, 15 December 2024)
- ML20080E863 + (03:17:55, 15 December 2024)
- ML20080E871 + (03:17:55, 15 December 2024)
- ML20080E860 + (03:17:56, 15 December 2024)
- ML20080E852 + (03:17:57, 15 December 2024)
- ML20080E857 + (03:17:57, 15 December 2024)
- ML20080E850 + (03:18:08, 15 December 2024)
- ML20080E846 + (03:18:09, 15 December 2024)
- ML20080E838 + (03:18:11, 15 December 2024)
- ML20080E843 + (03:18:11, 15 December 2024)
- ML20080E819 + (03:18:12, 15 December 2024)
- ML20080E828 + (03:18:12, 15 December 2024)
- ML20080E817 + (03:18:13, 15 December 2024)
- ML20080E813 + (03:18:13, 15 December 2024)
- ML20080E812 + (03:18:14, 15 December 2024)
- ML20080E811 + (03:18:14, 15 December 2024)
- ML20080E807 + (03:18:15, 15 December 2024)
- ML20080E808 + (03:18:15, 15 December 2024)
- ML20080E803 + (03:18:16, 15 December 2024)
- ML20080E802 + (03:18:17, 15 December 2024)
- ML20080E796 + (03:18:17, 15 December 2024)
- ML20080E794 + (03:18:18, 15 December 2024)
- ML20080E788 + (03:18:19, 15 December 2024)
- ML20080E783 + (03:18:20, 15 December 2024)
- ML20080E784 + (03:18:20, 15 December 2024)
- ML20080E781 + (03:18:22, 15 December 2024)
- ML20080E782 + (03:18:22, 15 December 2024)
- ML20080E774 + (03:18:23, 15 December 2024)
- ML20080E768 + (03:18:24, 15 December 2024)
- ML20080E759 + (03:18:29, 15 December 2024)
- ML20080E760 + (03:18:29, 15 December 2024)
- ST-HL-AE-1001, Informs That Applicant Has Not Received NRC in-progress Audit Rept of Control Room Design Review (Crdr).Final Crdr Cannot Be Submitted Until at Least 9 Wks After Receipt of Audit.Rept Schedule Must Be Revised + (03:18:31, 15 December 2024)
- ML20080E758 + (03:18:31, 15 December 2024)
- ML20080E756 + (03:18:32, 15 December 2024)
- ML20080E754 + (03:18:35, 15 December 2024)
- ML20080E752 + (03:18:35, 15 December 2024)