ML20080E952
| ML20080E952 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 08/01/1983 |
| From: | Kennedy D, Peterson D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC |
| References | |
| NUDOCS 8309140151 | |
| Download: ML20080E952 (4) | |
Text
9.
~
OPERATING DATA REPORT
~
~
DOCKET NO 50-255 DATE 8-1-83 COMPLETED BY DAPeterson-TELEPHONE-(616)764-8913
, OPERATING-STATUS Notes 1.'
Unit Name: Palisades 2..
Reporting ~ Period 830701-830731 1
3.
' Licensed Thermal' Power (MWt):
2530 4.
Nameplate Rating (Gross MWe):.
811.7
-5.
Design Electrical Rating (Net MWe):
805-16.
Maximum Dependable Capacity (Gross MWe): *675
$7.:
Maximum-Dependable Capacity-(Net MWe):
- 635 81 If Changes Occur in Capacity Ratings'(Items Number 3 through 7) since last report, give reasons:
- 9.. Power Level to Which Restricted, if any (Net MWe):
^
-10.. Reasons for Restrictions,.if any:
~
This Month Yr-to-Date Cumulative
,. - Hours'In Reporting-Period 744 5087
'101,822-
- 12. Number of Hours Reactor Was Critical 744 5049.3 58,972.3 13.J Reactor' Reserve Shutdown Hours
- 14. ; Hours Generator On-Line-744 4997.2 55,992.1 L15. Unit Reserve Shutdown' Hours'
- 16.. Cross Thermal Energy Generated (MWH) 1,735,776
.12,179,712
-114,816,504.
- 17.. Cross Electrical Energy Generated (MWH)
-529,220 3,817,620 35,587,540
.18.. Net L Electrical Energy Generated (MWH) 499,447-3,618,578 33,476,634
~19..
Unit Service Factor' 100.0 98.2
-55.0 l
J20,: Unit Availability Factor 100.0 98.2 55.0
- 21. Unit Capacity Factor (Using MDC Net) 105.7 112.0 51.8
- 22. Unit Capacity Factor (Using DER Net) 83.4 88.4-40.8
=23.
Unit Forced Outage Rate. '
0 1.8 32.5
~
"24.
Shutdowns: Scheduled Over Next-SixLHonths (Type, Date and Duration of Each):
' Refueling, 8/13/83,-103 days
'~25..If Shut Down at End of Report Period, Estiamted Date of Start Up:
. 26 p Units'in' Test Status (Prior to Commercial Operation):
, Forecast Achieved
- INITIAL CRITICALITY
. INITIAL-ELECTRICITY COMMERCIAL OPERATION b
\\Y.
l'5 t$cedIon' condenser. backpressure.
MR0883-0001A-TC01 8309140151 830001 1
PDR ADOCM 05000255
.R.
pop
=--
-- - ~.,... - - -,,
e a
AVERAGE DAILY UNIT POWER LEVEL
~
DOCKET NO 50-255 UNIT Palisades (O
DATE 8/1/83 COMPLETED BY DAPeterson TELEPHONE (616)764-8913 MONTH
' July, 1983-DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net)
!1 729 17 665 2-718 18 664 3
708 19 654
- 4 "715 20 640
'5 725 21 636-
- _ 6 739 22 639 7
737 23' 634 8-739 24 632 9
'9 718L 25 624 10 --
725 26 641
! 11'
-718-27 615
~12 710 28 590 13 709 29 578
.14; 691 30
'584
'15 685
.31 570
'16 676
' INSTRUCTIONS.
I.'
g
' ' On this format, list the average daily unit power level in MWe-Net for each day in the reporting
~
l
.' month. ~ Compute to the nearest whole megawatt.
^
~
w
.. MIO883-0002A'-TC01.
~
L._....
L
SUMMARY
OF OPERATING EXPERIENCE FOR JULY 1983 The Plant' operated th's entire reporting perio'd entering an end of cycle.
coastdown on July 12,.1983.
.e-3
{.' Y 4
m 9
9 l:
l l :.
l' 1,-
O t
6 9
A w, _
- MR0883-0001B-TC01 L.+
- -
ff '
Consumers
(
Power-Company Palisados Nuctaar Plant: Route 2, Som 154, Covert, MI 49043 August 5, 1983 1
US Nuclear Regulatory Commission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DRP-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of July, 1983.
ASWAf*
David M Kennedy s
Reactor Engineer CC: DVanDenBerg, Palisades JGKeppler, USNRC JRSchepers, P24-308 DJVandeWalle, P24-614B RMKrich, Palisades Resident Inspector, Palisades DLHackett, Pil-228B LTPhillips, P21-327 DEVanFarowe, Div of Radiological Health, Lansing, Michigan SMierzwa, Michigan Dept of Labor RCallen, Michigan Public Service Commission
- KMFarr, Palisades Records Center, INPO, Atlanta, GA PSepcenko, CE, Palisades RLRosenfeld, P26-204B h) j Document Control, 950*22*35*10/L j/
(
f4 DV:83*055
. ps*
- e,[
'i gG s
s,e l
._. _ - -