MONTHYEARML19340D7831980-12-23023 December 1980 Requests Summary Rept,Westinghouse Reactor Vessel Level Instrumentation Sys for Monitoring Inadequate Core Cooling, (7300 Sys), Dtd Dec 1980 Be Withheld (Ref 10CFR2.790) Per Previously Submitted Application AW-77-18 Approved 771028 Project stage: Other ML19347C7391980-12-31031 December 1980 Forwards Nonproprietary & Proprietary Versions of Response to NUREG-0737. Proprietary Version Available in Central Files Only Project stage: Other IR 05000334/19800291980-12-31031 December 1980 IE Insp Rept 50-334/80-29 on 801103-07.Noncompliance Noted: Failure to Control Vital Area,To Follow Access Control Procedures & to Follow Search Procedures.Details Withheld (Ref 10CFR2.790) Project stage: Request ML20003G1191981-04-15015 April 1981 Forwards Evaluation Rept of Inadequate Core Cooling Instrument Sys Conformance to NUREG-0737 Item II.F.2,per .Evaluation of Core Exit Thermocouples to Be Submitted by 810701 Project stage: Other ML20010F0021981-09-0202 September 1981 Forwards Responses to NRC Requesting Addl Info on NUREG-0737,Item II.F.2.3 Re Reactor Vessel Level Instrumentation Sys for Monitoring Inadequate Core Cooling. Response Withheld (Ref 10CFR2.790) Project stage: Other ML20031C0401981-09-30030 September 1981 Forwards Supplemental Response to NRC Re NUREG-0737,Item II.F.2.3 on Reactor Vessel Instrumentation Sys.Application for Withholding & Affidavit Encl Project stage: Supplement ML20052E2371982-04-28028 April 1982 Submits Addl Info Re TMI Action Plan Items II.F.2 & II.B.2. Installation of Reactor Vessel Level Instrumentation Will Be Completed During Third Refueling Outage Project stage: Other ML20072H5481983-03-25025 March 1983 Forwards Response to 821210 Generic Ltr 82-28, Inadequate Core Cooling Instrumentation Sys, Consisting of Upgraded Subcooling Margin monitors,core-exit Thermocouples & Reactor Coolant Inventory Tracking Sys Info Project stage: Other ML20204G1181983-04-21021 April 1983 Forwards Supplemental Response to Generic Ltr 82-28, Inadequate Core Cooling Instrumentation Sys & NUREG-0737, Item II.F.2.W/one Oversize Drawing.Aperture Card Is Available in PDR Project stage: Supplement ML20080G9641983-09-13013 September 1983 Advises That 830325 Commitment to Install Reactor Vessel Level Indication Sys Hardware Met,Per Generic Ltr 82-28 & NUREG-0737,Item II.F.2 Project stage: Other ML20080E8631984-02-0303 February 1984 Responds to 831216 Request for Addl Info Re Proposed Inadequate Core Cooling (ICC) Instrumentation,Per TMI Item II.F.2.Meeting Scheduled for 840301 in Bethesda,Md to Discuss Technical Issues Re ICC Instrumentation Project stage: Meeting ML20084H8731984-04-24024 April 1984 Forwards Response to 831216 Request for Addl Info Re NUREG-0737,Item II.F.2, Inadequate Core Cooling Instrumentation Sys, Per Generic Ltr 82-28.W/12 Oversize Drawings.Aperture Cards Are Available in PDR Project stage: Request ML20214P5671986-11-12012 November 1986 Requests Listed Addl Info Re Inadequate Core Cooling Instrumentation Design Changes,Including Projected Implementation Date for Changes,Including Tech Specs.Info Requested within 45 Days of Ltr Receipt Project stage: Other ML20207P9141987-01-12012 January 1987 Forwards Update to 860124 Submittal Re Inadequate Core Cooling Instrumentation Sys,Per NRC 861112 Request & Brief Comparison of Unit 1 & 2 Sys Project stage: Other ML20205F1411987-03-18018 March 1987 Forwards Addl Info to Clarify Existing Inadequate Core Cooling Instrumentation & Proposed Upgrade Described in Util 840426 & 870112 Submittals,Per 870303 & 11 Telcons W/Nrc Project stage: Other 1983-03-25
[Table View] |
Text
T4%
Telephone (412) 393-6000 Nuclear Division P.O. Box 4 Shippingport. PA 15077-0004 February 3, 1084 Director of Nuclear Reactor Regulation United States Nuclear Reaulatory Commission Attn:
Mr. Steven A. Varga, Chief Operating Reactors Branch No.1 Division of Licensing Washington, DC 20555
Reference:
Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Generic Letter 82-28; ICC Instrumentation (NUREG-0737 Item II.F.2)
Gentlemen:
This is in response to your letter of December 16,1983 which requested that we respond within 45 days of its receipt providing additional information on our proposed Inadequate Core Cooling (ICC)
Instrumentation for Beaver Valley, Unit 1.
This letter is to advise you that a meeting has been scheduled between members of my staff and the NRC Staff to discuss the technical issues related to ICC Instrument-ation. This meeting is presently scheduled for March 1,1984 at 10:30 in the Phillips Building. We will be prepared at that time to present some of the requested infonnation and determine an acceptable schedule for resolution cf any remaining items.
If you have any questions, please contact myself or members of my staff.
Ver t ly yours, J
J. Carey Vice President, Nuclear cc: Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U. S. Nuclear Regulatory Commission c/o Document Management Branch Washington, DC 20555 Mr. Peter Tam, Project Manager 6
U. S. Nuclear Regulatory Commission
/
Phillips Building Washington, DC 20555 Mail Stop 438 840210018'O 840203 PDR ADOCK 05000334 PDR
~