- 05000370/LER-1983-042-03, /03L-0:on 830823,fire Barrier Penetration Between Turbine Bldg 739-ft Elevation & Auxiliary Bldg Switchgear Room Found open.Six-inch Pipe Used to Seal Penetration Missing.Cause Unknown + (14:07:29, 14 December 2024)
- ML20080L146 + (14:07:30, 14 December 2024)
- 05000261/LER-1983-023-01, /01T-0:on 830905,primary to Secondary Leak in Steam Generator a Progressed Beyond Specs.Caused by Two Leaking Tubes & Contractor Error.Tubes Mechanically Plugged. Contractor Procedures Under Review + (14:07:32, 14 December 2024)
- ML20080L130 + (14:07:34, 14 December 2024)
- ML20080L126 + (14:07:35, 14 December 2024)
- ML20080L129 + (14:07:35, 14 December 2024)
- ML20080L125 + (14:07:36, 14 December 2024)
- ML20080L121 + (14:07:36, 14 December 2024)
- ML20080L120 + (14:07:37, 14 December 2024)
- ML20080L108 + (14:07:38, 14 December 2024)
- ML20080L113 + (14:07:38, 14 December 2024)
- LIC-95-0053, Annual Occupational Exposure Rept for 1994 + (14:07:39, 14 December 2024)
- ML20080L104 + (14:07:40, 14 December 2024)
- 05000339/LER-1983-068-03, /03L-0:on 830913,MOV-RS-200B Failed to Open During Stroke Time Test.Normally Closed Torque Switch Contacts in Valve Operator Found Open.Contacts Cleaned & Adjusted.W/ + (14:07:41, 14 December 2024)
- ML20080L095 + (14:07:43, 14 December 2024)
- ML20080L092 + (14:07:44, 14 December 2024)
- 05000339/LER-1983-067-03, /03L-0:on 830824,stub Bus Breaker H Failed to Open from Simulated Undervoltage Signal During Surveillance Testing.Caused by Incorrectly Wired Relay.New Relay Terminated Correctly + (14:07:46, 14 December 2024)
- AECM-83-0617, Requests Withdrawal of Item 31 Re safety-related Mechanical Snubbers Contained in Forwarding Proposed Changes to Tech Specs.Item Considered to Be Administrative Error + (14:07:46, 14 December 2024)
- ML20080L087 + (14:07:47, 14 December 2024)
- ML20080L086 + (14:07:48, 14 December 2024)
- ML20080L083 + (14:07:48, 14 December 2024)
- 0CAN029506, Forwards Summary Description of Proposed Vehicle Control Measures as Required by 10CFR73.55(c)(7) & Results of Bomb Comparison as Required by 10CFR73.55(c)(8).Encl Withheld + (14:07:49, 14 December 2024)
- GO2-83-859, Final Deficiency Rept,Condition 240 Re Loss of ESF Loads on Undervoltage Trip.Initially Reported on 830228.Sealed-in Circuit for Second Level Undervoltage Relays Deleted & Blocking Circuit Provided + (14:07:50, 14 December 2024)
- ML20080L074 + (14:07:50, 14 December 2024)
- ML20080L070 + (14:07:51, 14 December 2024)
- RC-95-0048, Forwards Rev 1 to Cycle 9 Core Operating Limts Rept + (14:07:51, 14 December 2024)
- ML20080L066 + (14:07:53, 14 December 2024)
- ML20080L065 + (14:07:53, 14 December 2024)
- BSEP-95-0110, Forwards Summary Description of Proposed Vehicle Control Measures Required for Protection Against Malevolent Use of Vehicles at Nuclear Power Plants.Encl Withheld + (14:07:54, 14 December 2024)
- ML20080L064 + (14:07:54, 14 December 2024)
- ML20080L060 + (14:07:55, 14 December 2024)
- 05000373/LER-1995-003-01, :on 950127,potential Traversing in-core Probe Containment Isolation Design Concern Noted.Interim Administrative Controls Put in Place to Ensure That Containment Isolation Function Not Compromised + (14:07:57, 14 December 2024)
- ML20080L045 + (14:07:58, 14 December 2024)
- ML20080L042 + (14:07:59, 14 December 2024)
- ML20080L040 + (14:08:00, 14 December 2024)
- 05000321/LER-1983-093-03, /03L-0:on 830824,while Starting Hpci,Hpci Turbine Bearing Oil Pressure Low Alarm Received.Hpci Manually Tripped & Declared Inoperable.Caused by Personnel Error. Valves Repositioned & Oil Pressures Adjusted + (14:08:01, 14 December 2024)
- 05000327/LER-1983-115-03, /03L-0:on 830827,while in Mode 1,operator for Auxiliary Bldg Gas Treatment Sys Damper 1-FCV-30-146A Disconnected.Caused by Loose Locking Nuts.Linkage Reconnected.Nuts Tightened + (14:08:06, 14 December 2024)
- ML20080L029 + (14:08:07, 14 December 2024)
- ML20080L028 + (14:08:08, 14 December 2024)
- ML20080L025 + (14:08:09, 14 December 2024)
- ML20080L019 + (14:08:10, 14 December 2024)
- ML20080L007 + (14:08:11, 14 December 2024)
- ML20080K999 + (14:08:12, 14 December 2024)
- ML20080K996 + (14:08:13, 14 December 2024)
- ML20080K990 + (14:08:13, 14 December 2024)
- ML20080K985 + (14:08:14, 14 December 2024)
- ML20080K981 + (14:08:15, 14 December 2024)
- ML20080K977 + (14:08:16, 14 December 2024)
- ML20080K973 + (14:08:17, 14 December 2024)
- TXX-4049, Advises That Emergency Preparedness Field Exercise Postponed from 831005 to 831214,due to Rescheduling of Emergency Preparedness Planning Activities + (14:08:17, 14 December 2024)
- ML20080K970 + (14:08:18, 14 December 2024)
- ML20080K959 + (14:08:21, 14 December 2024)