Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20082B045 + (12:29:57, 14 December 2024)
- ML20082B040 + (12:29:58, 14 December 2024)
- ML20082B042 + (12:29:58, 14 December 2024)
- L-83-522, Responds to NRC Re Violations Noted in IE Insp Repts 50-250/83-31 & 50-251/83-31.Corrective Actions: tie-downs Will Not Be Allowed to Penetrate Outer Packaging + (12:29:59, 14 December 2024)
- ML20082B029 + (12:30:00, 14 December 2024)
- ML20082B022 + (12:30:00, 14 December 2024)
- LD-95-015, Transmits Corrected Page for Incorporation Into Sys 80+ DCD Revs + (12:30:01, 14 December 2024)
- ML20082B008 + (12:30:01, 14 December 2024)
- ML20082B005 + (12:30:02, 14 December 2024)
- ML20082B004 + (12:30:02, 14 December 2024)
- 05000301/LER-1995-001-01, :on 950227,normal Power Supply Breaker for 4160 Volt Safeguards Bus 2A05 Was Inadvertently Tripped Open During Mod Work for Installation of Addl EDG Due to Cognitive Error.Recovered Affected Equipment + (12:30:04, 14 December 2024)
- ML20082A990 + (12:30:05, 14 December 2024)
- PLA-1914, Final Deficiency Rept Re Lack of Movement in Itt Grinnell Snubber Brackets.All Snubbers Will Be Capable of + or -5 Degree Movement Per Rear Bracket Design.Reinsp Documented on Bechtel Nonconformance Rept 10809.Also Reported Per Part 21 + (12:30:06, 14 December 2024)
- ML20082A989 + (12:30:06, 14 December 2024)
- ML20082A980 + (12:30:07, 14 December 2024)
- 05000333/LER-1983-045-03, /03X-1:on 831004,discovered Surveillance Test F-ST-5B, APRM Instrument Functional Test, Exceeded Tech Spec Requirements by 18 Minutes.Caused by Personnel Error. Surveillance Schedule Updated + (12:30:08, 14 December 2024)
- ML20082A967 + (12:30:22, 14 December 2024)
- ML20082A969 + (12:30:22, 14 December 2024)
- ML20082A953 + (12:30:23, 14 December 2024)
- ML20082A951 + (12:30:24, 14 December 2024)
- NRC-95-0022, Forwards Rev 12 to Radiological Emergency Response Preparedness Plan (Rerp). Rev Result of 1994 Annual RERP Review,Including Rev of Emergency Response Organization + (12:30:24, 14 December 2024)
- ML20082A946 + (12:30:25, 14 December 2024)
- PLA-1828, Responds to NRC Re Violations Noted in IE Insp Rept 50-387/83-16.Corrective Actions Withheld (Ref 10CFR73.21) + (12:30:25, 14 December 2024)
- ML20082A939 + (12:30:26, 14 December 2024)
- ML20082A926 + (12:30:27, 14 December 2024)
- 05000289/LER-1983-036-03, /03L-0:on 831006,three Fire Barrier Seals Determined Inoperable.Caused by Inadequate Installation Instructions.Fire Watch Posted During Seal Repair.Procedure Revised + (12:30:34, 14 December 2024)
- ML20082A922 + (12:30:35, 14 December 2024)
- ML20082A919 + (12:30:35, 14 December 2024)
- ML20082A915 + (12:30:36, 14 December 2024)
- 05000317/LER-1983-061-03, /03L-0:on 831012,shutdown Cooling (SDC) Return Isolation Valves Shut,Terminating Sdc.Caused by High Pressure Signal Due to Inadequate tag-out of Electrical Signals from Pressurizer Transmitters + (12:30:37, 14 December 2024)
- 05000286/LER-1983-005-01, /01T-0:on 831011,during Cold Shutdown,Determined Design of Drain Line 339 on Each Accumulator Is Such That Seismic & Nonseismic Line Connected by Normally Open Manual Valve.Procedures Revised + (12:30:39, 14 December 2024)
- PLA-1925, Final Deficiency Rept Re Spray Pond Siphoning Through Makeup/Deicing Line.Initially Reported on 830805.Spray Pond Operating Limits Will Be Changed to Require Min Spray Pond Inventory of 23 Million Gallons.Also Reported Per Part 21 + (12:30:40, 14 December 2024)
- 05000317/LER-1983-057-03, /03L-0:on 831010,leak Discovered on Downstream Side of Instrument Stop Valve 1-SI-1324.Caused by Cracked Weld.Stop Valve Adapter & Affected Tubing Will Be Removed & New Adapter Installed + (12:30:42, 14 December 2024)
- ML20082A887 + (12:30:43, 14 December 2024)
- ML20082A882 + (12:30:47, 14 December 2024)
- RBG-16-295, Interim Deficiency Rept DR-139 Re Springs in Pacific Scientific Mechanical Shock Arrestors PSA-1 & PSA-3. Investigation Incomplete.Next Rept Will Be Submitted by 831229 + (12:30:47, 14 December 2024)
- ML20082A877 + (12:30:48, 14 December 2024)
- ML20082A872 + (12:30:49, 14 December 2024)
- ML20082A860 + (12:30:50, 14 December 2024)
- 05000311/LER-1983-051-03, /03L-0:on 830929,pressure Demand Signal Dropped, Causing Pressurizer Spray Valves to Open & RCS Pressure to Drop.Caused by Difference Between Two Channel Signal Isolator Outputs to Pressurizer Controller + (12:30:52, 14 December 2024)
- ML20082A843 + (12:30:53, 14 December 2024)
- ML20082A838 + (12:30:53, 14 December 2024)
- ST-HL-AE-3804, Forwards 1RE03 Inservice Insp Summary Rept for Welds,Steam Generator Tubing & Component Supports of South Texas Project Electric Generating Station Unit 1 + (12:30:54, 14 December 2024)
- ML20082A825 + (12:30:55, 14 December 2024)
- ML20082A836 + (12:30:55, 14 December 2024)
- ML20082A822 + (12:30:56, 14 December 2024)
- ML20082A815 + (12:30:56, 14 December 2024)
- ML20082A814 + (12:30:57, 14 December 2024)
- 05000333/LER-1983-047-03, /03L-0:on 831027,during Surveillance Testing,One of Four Scram Instrument Vol Drain Valves AOV35 Failed to Close within Specified Time Frame.Relaxation of Lower Stroke Time Limit Under Evaluation + (12:30:58, 14 December 2024)
- ML20082A808 + (12:31:00, 14 December 2024)
- 05000267/LER-1983-040-03, /03L-0:on 830928,while Operating at 65% Power,One of Three Loop II Plant Protective Sys Dewpoint Moisture Monitors Discovered Inoperable Due to Overheating of Mirror. Caused by Slight Pressure Decrease in Monitor + (12:31:01, 14 December 2024)