- 05000387/LER-1983-146-03, /03L-0:on 831013,during Review of Surveillance Operating Procedures,Discovered Monthly Verification of Drywell Head Seal Test Connection Valve Not Performed.Caused by Personnel Error.Procedure Scheduled + (12:27:06, 14 December 2024)
- ST-HL-AE-1025, Submits Proposed Schedule for Responding to Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events. Equipment Classification & Vendor Interface Programs Will Be Completed by June 1985 + (12:27:07, 14 December 2024)
- 05000333/LER-1983-043-03, /03L-0:on 830927,condensate Storage Tank Low Level Switch 23-LS-74A Failed to Trip at Setpoint of 59.5 Inches Above Tank Bottom.Cause Unknown.Switch Mechanism Will Be Observed Further + (12:27:09, 14 December 2024)
- ML20082B643 + (12:27:10, 14 December 2024)
- ML20082B642 + (12:27:10, 14 December 2024)
- ST-HL-AE-3816, Forwards Revised Operational Improvement Plan Presentation Package,Per 910510 Meeting.Safety Sys Actuation Data & Automation Scram Data on Pages 2 & 3 Revised + (12:27:11, 14 December 2024)
- PLA-1924, Interim Part 21 Rept Re Cavitation of Jet Pumps Due to Induction Heating Stress Improvement Cooling.Initially Reported on 830621.Caused by Inadequate Precautions to Prevent Cavitation Area Operation + (12:27:12, 14 December 2024)
- ML20082B620 + (12:27:13, 14 December 2024)
- 0CAN108311, Responds to NRC Re Violations Noted in IE Insp Repts 50-313/83-16 & 50-368/83-16.Corrective Actions:Actual Classroom Attendance Required at Requalification Lectures + (12:27:14, 14 December 2024)
- ML20082B618 + (12:27:14, 14 December 2024)
- 05000220/LER-1983-027-03, /03L-0:on 830923,during Normal Full Power Operations,Two of Three Feedwater Strings Tripped & Cooler Water Entered Reactor Core.Caused by Bad Fuse Holder in Reactor Trip Bus 131.Fuse Holder Replaced + (12:27:16, 14 December 2024)
- 05000289/LER-1983-039-01, /01T-0:on 831018,waste Gas Sys Deuterium Monitor Removed from Svc W/O Sample Taken.Caused by Personnel Error. Sample Taken & Analyzed Immediately + (12:27:17, 14 December 2024)
- ML20082B605 + (12:27:18, 14 December 2024)
- ML20082B603 + (12:27:19, 14 December 2024)
- 05000373/LER-1995-008-01, :on 950301,determined That TS SR to Take CR Temp Not Met Due to Deficient Procedure.Required Readings Immediately Taken & Verified & Operations Dept Sp LOS-AA-S2 Revised + (12:27:20, 14 December 2024)
- 05000334/LER-1983-033-03, /03L-0:on 830922,two of Three River Water Pumps Left in pull-to-lock Position.Caused by Operator Failure to Return River Water Sys to Pretest Condition.Corrective Actions Complete or in Progress + (12:27:22, 14 December 2024)
- 05000333/LER-1983-048-03, /03L-0:on 831021,during Normal Operation,Plant Entered 24 H Limiting Condition Due to Control Rod Selection Switch 10-15 Being Inoperable.Caused by Switch Aging.Switch Replaced + (12:27:24, 14 December 2024)
- ML20082B593 + (12:27:25, 14 December 2024)
- ML20082B591 + (12:27:26, 14 December 2024)
- ML20082B592 + (12:27:26, 14 December 2024)
- ML20082B590 + (12:27:27, 14 December 2024)
- ML20082B587 + (12:27:27, 14 December 2024)
- ML20082B577 + (12:27:28, 14 December 2024)
- 05000277/LER-1983-024-01, /01T-0:on 831024,during Audit of Certain Radiographs of Class I Piping,Three Radiographs Read Improperly.Caused by Personnel Error.All Radiographs Reviewed + (12:27:30, 14 December 2024)
- ML20082B575 + (12:27:31, 14 December 2024)
- 05000265/LER-1983-020-01, /01T-0:on 831027,test Data Revealed Six 12 & 28- Inch Welds on Reactor Recirculation Sys & One 20-inch Weld on RHR Shutdown Cooling Had Circumferential Indications. Caused by Intergranular Stress Corrosion + (12:27:32, 14 December 2024)
- ML20082B572 + (12:27:34, 14 December 2024)
- U-601857, Monthly Operating Rept for June 1991 for Clinton Power Station,Unit 1 + (12:27:34, 14 December 2024)
- 05000333/LER-1983-050-03, /03L-0:on 831024,reactor Cleanup Sys Equipment Area High Temp Switch 12-TS-139B Setpoint Found Higher than Tech Spec Max.Caused by Instrument Drift.Setpoint Reset + (12:27:36, 14 December 2024)
- ML20082B563 + (12:27:39, 14 December 2024)
- ML20082B558 + (12:27:40, 14 December 2024)
- 05000333/LER-1983-046-03, /03L-0:on 831008,plant Entered 24 H Limiting Condition for Operation Due to Control Rod 02-23 Rod Selection Switch Inoperability.Caused by Old Age of Switch. Switch Replaced & Verified Operable + (12:27:42, 14 December 2024)
- ML20082B551 + (12:27:43, 14 December 2024)
- ML20082B548 + (12:27:44, 14 December 2024)
- ML20082B549 + (12:27:44, 14 December 2024)
- 05000271/LER-1991-015, :on 910614,containment Isolation Valve Failed to Closed Due to Erosion/Corrosion & Displacement of screw- in Seat.Valve Repaired by Welding New Seat Into Valve Body + (12:27:46, 14 December 2024)
- ML20082B540 + (12:27:51, 14 December 2024)
- ML20082B536 + (12:27:52, 14 December 2024)
- ML20082B538 + (12:27:52, 14 December 2024)
- ML20082B527 + (12:27:53, 14 December 2024)
- PY-CEI-NRR-1353, Proposed Tech Specs 2.1.2,2.2.1,3.3.1,3.3.6,3.4.1.1,3.4.1.2 & 3.4.1.3 + (12:27:54, 14 December 2024)
- ML20082B521 + (12:27:55, 14 December 2024)
- ML20082B520 + (12:27:55, 14 December 2024)
- ML20082B516 + (12:27:56, 14 December 2024)
- ML20082B515 + (12:27:56, 14 December 2024)
- ML20082B511 + (12:27:57, 14 December 2024)
- 05000269/LER-1983-016-03, Hydrogen Purge Unit Declared Inoperable Due to Discharge Flow Instrument FT-100 Damage.Caused by Personnel Error.Flow Instrument Repaired & Connections Will Be Relocated + (12:27:59, 14 December 2024)
- ML20082B500 + (12:28:00, 14 December 2024)
- 05000335/LER-1983-028-03, /03L-0:on 831004,while Defueled,Test Connections Not Provided Spare Electrical Penetration E-4 W/Flange Cover.Caused by Design Deficiency Not Showing Flanged Connection.Design Change Performed + (12:28:01, 14 December 2024)
- GO2-83-678, Forwards Final Response to Notice of Violation from IE Insp Rept 50-397/83-14.Corrective Actions:Review of Quality Documentation & Receiving Records Performed to Assess Potential for Inadvertent Substitution of Reinforcing Steel + (12:28:02, 14 December 2024)
- 05000250/LER-1983-019-03, /03L-0:on 831008,RHR Flow Isolated Due to Pressure Transmitter PT-3-405 Exposure to Hydrostatic Test Pressure of 3,100 Psig.Caused by Unclear Drawing Configuration of Loop a Sample Line.Transmitter Replaced + (12:28:04, 14 December 2024)
- LIC-95-0077, Forwards Revised Radiological Emergency Response Plan & Revised Epips,Including Central Files Version of Emergency Plan Form (Epf) FC-EPF-9,Rev 4.Central Files Version of Epf FC-EPF-9,Rev 4 Withheld + (12:28:05, 14 December 2024)