Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
. .. ..
.. s e .
Wisconsin Electnc POWER COMPANY 231 W Michcan, Po Box 20% Mawo Aee. # 53201 (414)221 2345 VPNPD-91-217 NRC-91-065 July 10, 1991 U.S. NUCLEAR REGULATORY COMMISSION Document Control Desk Mail Station P1-137 Washington, D.C. 20555 Gentlemen:
DOCKETS S0-266 AND 50-301 I MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of June 1991.
Very truly yours,
~
0 ,a i ,
g?' (twe';) ,( < d -
Q ( ??
C . JW . Fay Vice President Nuclear Power Attachments Copies to L. L. Smith, PSCW NRC Regional Administrator, Region III NRC Resident Inspector
((
a reay A subsaham ofIliuvnsm ungs(brp>rakin Ij ,
e
- m OPERATING DATA REPORT DOCKET NO. 50-266 .
DATE: July 8, 1991 COMPLETED BY: D. C. Peterson TELEPHONE 414/755-2321 OPERATING STATUS POINT BEACH NUCLEAR PLANT UNIT 1 . NOTES
- 1. UNIT NAME: .
- 2. REPORTING PERIOD: JUNE 1991 .
- 3. LICENSED THERMAL POWER (MWT): 1518.5
- 4. NAMEPLATE RATING (GROSS MWE): 523.8 .
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497. .
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE TMIS MONTH YR TO DATE CUMULATIVE 720 4,343 181,007
- 11. HOURS IN REPORTING PERIOD 3,285.6 149,053.2 708.3
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 652.7 0.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 3,210.6 146,114.2 708.3
- 14. HOURS GENERATOR ON LINE 0.0 837.9 0.0
- 15. UNIT RESERVE SHUTDOWN HOURS 4,795,357 204,202,052 1,027,546
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,636,400 68,938,780 356,370
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWh) 1,560,958 65,681,998 340,301
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 73.9 80.7 98.4
- 19. UNIT SERVICE FACTOR 73.9 81.2 93.4
- 20. UNIT AVAILABILITY FAC*OR 74.1 74.4 97.5
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 72.3 73.0 95.1 i 22. UNIT CAPACITY FACTOR (USING DER NET) 0.7 1.7 1.6
- 23. UNIT FORCED OUTAGE RATE
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NONE
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN I
1977 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, h
I I
DOGET NO. fC-2f6 POINT BEAC11 NUPER PLANT -
r-UNIT NAME Peim Beach. Unit 1 AVERAGE DAILY UNIT POWER I.EVEL DATE Jafy 8_ IW1 MONTH JUNE - IW1 COMPLETED BY J. T. Kirchen TFT FPHONE 474/755- 3 21 AVERAGE AVERAGE AVERAGE DAILY D A I? Y DAILY POWER LEVEL POWER LEVEL POWER LEVEL MWe NET DAY MWe NET DAY MWe NET DAY 21 495 11 3R5 1 4W 22 SM 12 JM 2 501 495 23 se
- 57) 13 3
50 a 4W 14 sc 24 25 %C 15 %27 5 Wh 26 491 WN 16 497 6
27 493 17 497 7 49r.
SJ7 23 495 494 IS 8
29 391 19 495 9 _ 471
- 6 30 (C
- 6 20 10 rnr4w3%
(03 90)
POINT BEACH NUCLEAR FIANT Docket No. % 266 -
- p. Unit Name - Pu Beacit Unit i UNIT SHUTDOWNS AND POWER REDCCTIONS Date . July 8 ?901 ,
Comp;cted By C W. Krause D. C Petersen.
REPORT MONIR JUNE - 1901 TckAuse No. 414/2?I-230L 414mS2221 l l 3 '
Method of i 5%eteg h Date Type' Duratum - Reasoe 2 Dean 1xessee bent Syaem Con posent Cause and Corutne Actica 1 910611 F 0 A 5 Of Instm Leakage ce Maia feed Pump P-25A page Ene.
2 91%29 F 11.5 A 3 91 477 ED Genera L.s.r4 seactor prcnection i,s.-.env t*ss due to inverter fadwre.
i a
i j 'F: Forced Reasorr ' Method: ' Exhibit G - Instnictions S: Scheduled A - Equipment Failure (explain) 1 -- Manual for preparation of
- B - Maintenance or Testing 2 - Manual Scram data entry sheets 3
C - Refueling 3 - Automatic Scram LER file (NMEG-0161)
D - Regulatory Restriction 4 - Continuation of 1
^
E - Operator Training & Predous Shutdown Licennng Exam 5 - Reduced Lead
- F- Administrative 6 - Other (explain) 'ExluEt I - Same Source G - Operational Error (explain)
- H - Other (explain) rar-oo:so (O M O)
1
, DOCKET NO. 50-266 UNIT NA:4E Point Deach, Unit 1 DATE July 8, 1991 COMPLETED BY D. C. Potorson TELEPHONE 414/755-2321, Extension 361 Following a 45-day refueling and maintenance outago completed in the previous month, Unit 1 operated at approximately 473 MWo not throughout this report period with one significant load reduction and one unit trip. The significant load reduction was caused by instrument lino leakago on the steam generator foodwater pump IP-28A. The unit trip was due to do-energized reactor protection instrumentation bus due to inverter failure.
During this period, Unit 1 experienced an event which is reportable in accordance with 10 CFR 50.73 (LER 91-006). On June 15 omorgency diosol generator G-01 fast-started as a result of switches in-local control panel C-64A being disturbed as the panel door was opened.
Safety-related maintenance included repaired leaking suction flow transmittor fi.tting on steam generator foodwater pump 1P-28A; replaced dofoctivo diodos in inverter DY-01; replaced stem, plug, and cago of atmospheric steam dump valvo IMS-2016; and replaced seals on component cooling water pump 1P-11A.
l l
l I
)l 1i1ll1
. e S 5 742 468 5 1
. . N . E O V 2762 27095 6 1 01
. . S I 9216065' 388S8 A T 7, 4, 2 ' , 3 8, 6, 7, I A P L 5 5 3 6 4 2
. . U 68 4 359 E M 1 1 1 7, 5, 2,
. . V U C 4 96
.I G 066 7 7
2 a . . , 9 T 1 c 1 . R s .
r 2 O 2 e 3 . . P t 2 E N 2 e - . .R 0000 0061 0 N T 5 E C R
.T T 33 030S03 002 00 : E 5
7 S A 4 4 4 5 97000C ) s. B v
1 C / . .A D 3, 3, 3, 4, .3 6,11 11 B 1 n 9 4 C 9 u s 1 9 . 1 . .L O 4 4 4 27 0 A9 E
S i v
0 1 D 4 E T 756 1 T E 3 . . C 52,1,
- , N R , F , O S 0 8 . . I E Y 622 O7 N D
5 Y E S L 2 y B N . . B N E"
. l O ) A O r I
l A
o z. H . . 7 C N J a.
r P I T e t w D 2 . . H L A - 1 A. P 0000 R T
E : L
- I E . . U G
P 00 1 6 0. P.U te A R.
r.
F E P T O A 3 00000407 0029OD p T C T M .S . P N 2 2 2 4 2 7 0009 e S .
H T O D S t.
O A D
O C .T E
T O M 7 7 7 6,8,3,1 1 1 N F L C .
O N 9 2 6 A t O C
.N . 3 S 8 7 5 r E I 0,3 3 , a E R
. . . . . . .R : L H E t T N E ) B T 1 T s A B EA A D N M WC D o I
. U MI ,t D L E s 2 9 0 .N TP E P y n T A
r.
T 55 S EP i I 8 NA Y c M I
N U
7 :
9 )
4 M
I
(
YO T )
T( d t
u T
S m
Q 4E : ( NN H 5 h E E T 5 8 W) A W) aS R N MES L ) MH ) ) i ,
A 83 : WG F : A H( W TT s
- e D S L 1 2 ) S MN I ) C W M EE O c O A T P 5 5 ES I Y I MD( NN M n I R 11 WOTT ,N T ( E a R D O R9 MREA I TD CR 6 n E E P GNR a. A RS DE e P T E
A9 E1 : : T( (
r A F CR a.
r PT AE MD l t A R L t ) E Y cI U i EA A n T L CETENYYT I ( SO SANR GG si R U A UNW W( TTI R , AH RREE NN h a O C T NUMM I I C T DW UEGN I I M P L A J( GCCA S S O N ON E RSS R E A D H SNAAP EN I RhEHEYG OUUEEd R C C RSI PP A RO ROC N GG T( ( TV n F S G A EOTAAC I ET uI i RY C AO a N E WRACC NECC HT PC A u lL' YEG GNRRFOO ARRR D g O R O
B OGR I
T r :
P (
LLL EEI LI I BHR GEhNE'a NRSO A E REEO NTYCCGLi TTEE n D N
I C
A T E A R F D J,GABBRAWT I vNLECTAAAUl E I O NCAAUC S TSER nEA AI FFTD e F P OI MI I NNCLTP DDCI OE RRVOS OURT LI A CLFL I YYCHf UE u T A D O
S U
PRP T EEA3EEOP PHRCPP PLR POEAEARCEBTT EHSRVMTI CAI IDS R C e N N
A T : T EEESAEO R EERRCRI LCCE N A EG ELD DE VF FRNEEETVI AACS r X a.
T MNDTE GTE NO ES HLCRAPPRN a :
T r.
RDRGITEEEVAAOW LSACCFO d S AI EA MMNOLS I U R NTSLNUUAN N F - H G RNPGMMH RO S E *A S SSE O N TOEEI I I C SS RBCRTS S TTTTT s. 2 4 S F WA U MAUI OO- I I I I I v E I
T A
I PCMSUX NEI AE URLNDMMI AF OI PP OI EONRRENNNNNh H 'N R H U G G N U U U U U S T
I R
R A E . . . . . . . . . . . . . . . . . . . . . . . . . T P 1 234 5 67 8 90 1 23 4 567 890 1 23 4 5 A O 1 1 1 1 1 1 1 1 1 1 2 222 2 2 D l llllll'll
- POINT BEACH NUCLEAR FLANT - DOCKET NO. f0-301
< AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Bean. Unit 2 MONTli JUNE - 1991 DATE Julv8.1991 ~
' COMPLETED BY J. T. Kirchen TELEPHONE 414/755-2321
! AVERAGE AVERAGE AVERAGE l DALLY DAILY DAILY l POWER LEVEL POWER LEVEL POWER LEVEL DAY _MWe NET DAY MWe NET DAY MWe NET i
i i
1 #M 11 W 21 SM 2 498 12 495 22 493 3 4% 13 497 23 441 4 495 14 499 24 492 5 444 15 499 25 493 6 495 16 #19 26 494 7 495 17 #N 27 495 8 4% 18 499 28 93 9 498 19 498 29 499 10 498 20 498 30 498 4
j rar-com.
(03-99)
POINT BEACH NUCLEAR PLANT Docket No. S)-301 Unit Name Point Beach. Unit 2 UNIT SillTi DOWNS AND POWER REDUCTIONS Date July 8. !?>1 - -
Completed By C. W. Krause_ D. C. Peterson REPORT MONTH JUNE - 1991 Telephone No. 414/221-2001. 414n55-2321 Method of Shornng i % Dare Type' Duration Reason Down licensee Event System Component Cease and Correctrve Acton (Ifouni Reactor3 Rerort No ~ Code
- Code' To Pr-vent Reev= nce 2
I 2
'F: Forced Reason- ' Method-
- Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1-M d for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training & Presious Shutdown licensing Exam 5 - Reduced Load F- Administrative 6 - Other (explain) Mt I - Same Source G - Oper tional Error (explain)
H - Other (explain)
PBF-GU2Sb p 90)
'i
. DOCKET NO. 50-301 UNIT NAME Point Beach, Unit 2 DATE July 8, 1991 COMPLETED BY D. C. Potorson TELIPl!ONE 414/755-2321, Extension 361 Unit 2 operated at approximately 195 MWo not throughout this report period with no significant load reductions.
Safety-related maintenanco performed during the month included inspection and repair of insulating wrap on motor leads of safety injection pumps 2P-15A and Bt replacement of power and control cables for residual heat removal pump sump "B" suction valvo 281-850B, residual heat removal pump sump "B" suction valvo 2SI-851B, and residual heat removal pump refueling water storage tank suction valvo 2SI-856B; replacement of the power cable to containment sump "A" dischargo valvo 2WL-1728; and roset regulator setting on reactor coolant drain tank vont valvo 2WG-1787.
1
_ _ - - - - - - - - - - - - _ _ _ _ _