Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20082B855 + (12:25:49, 14 December 2024)
- ML20082B852 + (12:25:50, 14 December 2024)
- ML20082B849 + (12:25:51, 14 December 2024)
- JPN-91-032, Forwards Application for Amend to License DPR-59,changing TS Tables 3.2-7 & 4.2-7 to Reflect Change in Reactor Water Recirculation Pump Trip Logic & Increasing Min Number of Operable Channels from One to Two + (12:25:54, 14 December 2024)
- ELV-02947, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-424/91-10 & 50-425/91-10 on 910520-24.Corrective Actions: Preventive Maintenance Change Request Initiated to Incorporate Fire Pump Gauges & Flow Meters + (12:25:55, 14 December 2024)
- ML20082B842 + (12:25:55, 14 December 2024)
- ELV-02943, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-424/91-08 & 50-425/91-08 on 910513-17.Corrective Actions: EOC HVAC Sys Restored Maintaining Positive Pressure During Graded Exercise + (12:25:56, 14 December 2024)
- ML20082B834 + (12:25:57, 14 December 2024)
- 05000278/LER-1983-014-03, /03L-0:on 831004,while Shutdown W/Reactor Mode Switch in Refuel Position,Second Control Rod Could Be Selected When Control Rod 02-35 Selected.Caused by Open Diode on GE Relay Card.Diode Replaced + (12:25:59, 14 December 2024)
- JPN-95-020, Informs of Completion of Rc Water Level Instrumentation Mods Associated W/Bulletin 93-003 Issues + (12:26:00, 14 December 2024)
- HL-1724, Provides Response to Re Violations Noted in Insp Rept 50-366/91-15.Corrective Actions:Operations Personnel Confirmed No Actual LOCA Conditions Existed & Actuations Occurred as Expected + (12:26:01, 14 December 2024)
- ML20082B821 + (12:26:02, 14 December 2024)
- PLA-1926, Ro:On 830916 & 18,smoke Detector Zone Declared Inoperable When Alarming Smoke Detector Could Not Be Reset.Fire Watch Established & Will Be Maintained Until Detection Zone Repaired During Plant Shutdown Due to ALARA Concerns + (12:26:02, 14 December 2024)
- ML20082B817 + (12:26:03, 14 December 2024)
- ML20082B815 + (12:26:04, 14 December 2024)
- ML20082B810 + (12:26:05, 14 December 2024)
- ML20082B807 + (12:26:06, 14 December 2024)
- ML20082B806 + (12:26:07, 14 December 2024)
- 05000315/LER-1983-105-03, /03L-0:on 831011,channel Functional Test for Pressurizer PORV Emergency Air Pressure Alarms Not Performed Per Tech Specs.Caused by Personnel Error.Nuclear Test Scheduler Computer Changed to Show Correct 31 Days + (12:26:08, 14 December 2024)
- ML20082B797 + (12:26:11, 14 December 2024)
- ML20082B794 + (12:26:11, 14 December 2024)
- ML20082B792 + (12:26:12, 14 December 2024)
- 05000315/LER-1983-104-03, /03L-0:on 831011,diesel Generator Cd Output Circuit Breaker T11C3 Failed to Close on Undervoltage Condition on Bus T11C.Caused by Coil on Diesel Generator Cd Running Relay Being Opened.Relay Replaced + (12:26:14, 14 December 2024)
- GO2-83-592, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-14.Corrective Actions:Review of Nonconformance Repts Identifying Locations of Honeycombs or Voids Repaired by Contract 6426 Will Be Conducted + (12:26:15, 14 December 2024)
- ML20082B784 + (12:26:15, 14 December 2024)
- 05000289/LER-1983-034-03, /03L-0:on 831004 & 07,during PORV Testing & Primary Sys Degassing,Hydrogen Concentration in Miscellaneous Waste Storage Tank Exceeded 2% Tech Spec Limit.Cause Not Stated + (12:26:19, 14 December 2024)
- 05000416/LER-1983-160-03, /03L-0:on 831010,containment Hydrogen Monitor Declared Inoperable When Hydrogen Analyzer Cell Failure Light Alarmed & Would Not Clear.Caused by Analyzer Conductivity Cell Failure.Cell Replaced + (12:26:21, 14 December 2024)
- ML20082B753 + (12:26:22, 14 December 2024)
- ML20082B752 + (12:26:22, 14 December 2024)
- 05000336/LER-1983-027-03, /03L-0:on 830926,during Refueling as Received Steam Set Pressure Test 2-RC-201 Performed.Valve Failed Test Exceeding Set Pressure by Greater than 1%.Cause Unknown.Valve Rebuilt + (12:26:24, 14 December 2024)
- ML20082B745 + (12:26:25, 14 December 2024)
- ML20082B746 + (12:26:25, 14 December 2024)
- 05000333/LER-1983-051-03, /03L-0:on 831025,condensate Storage Tank Low Level Switch 23-LS-74B Setpoint Found Below Tech Spec Min.Caused by Setpoint Drift.Setpoint Immediately Adjusted + (12:26:27, 14 December 2024)
- ML20082B737 + (12:26:28, 14 December 2024)
- ML20082B741 + (12:26:28, 14 December 2024)
- ML20082B736 + (12:26:29, 14 December 2024)
- ML20082B731 + (12:26:30, 14 December 2024)
- ML20082B730 + (12:26:31, 14 December 2024)
- ML20082B728 + (12:26:32, 14 December 2024)
- ML20082B726 + (12:26:33, 14 December 2024)
- ML20082B727 + (12:26:33, 14 December 2024)
- ML20082B723 + (12:26:34, 14 December 2024)
- 05000333/LER-1983-042-03, LPCI Independent Power Supply B Tripped.Caused by Faulty Inverter Leg Assembly. Assembly Replaced & Inverter Tested Satisfactorily + (12:26:35, 14 December 2024)
- ML20082B716 + (12:26:36, 14 December 2024)
- 05000369/LER-1983-100-03, /03L-0:on 831008,during Monthly Functional Test, Pressure of Oxygen Regulator 1A Found Out of Required Tolerance.Apparently Caused by Leakage Past Internal Diaphragm.Regulator Replaced + (12:26:38, 14 December 2024)
- ML20082B703 + (12:26:39, 14 December 2024)
- ML20082B702 + (12:26:40, 14 December 2024)
- ML20082B699 + (12:26:41, 14 December 2024)
- ML20082B698 + (12:26:41, 14 December 2024)
- 05000369/LER-1983-104-03, /03L-0:on 831020,RCS Loop B Overtemp Delta T Declared Inoperable When Loop Indicator Exceeded Allowable Tolerance.Caused by Malfunction of Heat Sensitive Components on Printed Circuit Card in Process Control Sys + (12:26:43, 14 December 2024)
- NRC-91-0083, Provides Summary Rept of Second Individual Plant Exam Milestone,Per & in Ref to Generic Ltr 88-20 Re Individual Plant Exams for Severe Accident Vulnerabilities + (12:26:44, 14 December 2024)