ML20082B752

From kanterella
Jump to navigation Jump to search
Suppls 830610 Response to IE Bulletin 83-03, Check Valve Failures in Raw Water Cooling Sys of Diesel Generators. Surveillance Test Procedures Revised & Check Valves Tested Successfully.Response to Bulletin Complete
ML20082B752
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 11/04/1983
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
REF-SSINS-6820 IEB-83-03, IEB-83-3, NUDOCS 8311210313
Download: ML20082B752 (2)


Text

_.. _ _

.i

.. s:..

s PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STRELT P.O. BOX 8699 PHILADELPHI A. PA.19101 1

(2'51 841 5001 56CELOS L DALTROFF SLactmec Paco es November 4, 1983 Dr. Thomas E. Murley, Admininstrator l

Region I U.S. Nuclear Regulatory Commission i

Office of Inspection and Enforcement 631 Park Avenue King of Prussia, PA 19406

Reference:

Letter J. W. Gallagher to James H. Allan, June 10, 1983

Dear Dr. Murley:

i The USNRC letter of March 10, 1983, forwarded I.E.

Bulletin 83-03, " Check Valve Failures in Raw Water Cooling Systems of Diesel Generators".

The Bulletin requested licensees.

to submit a report to the NRC within 90 days of completion of the-initial valve integrity verification required by the Bulletin.

In accordance with the Bulletin', Philadelphia Electric Company, Peach Bottom Atomic Power Station, revised'the appropriate surveillance test procedures as noted in-the i

referenced response.

The check valves were tested successfully on October 19, 1983, per the revised test procedures and performed their intended function.

i i

This report completes:our response to the Bulletin.- If l

there are any further questions, please.do not hesitate to-contact us.

\\

-Verytruly)ours, J,

1

,,/ / / -

l Q(

1 cc: 'A.

R. Blough,-Site Inspector l

NRC Document Control Desk l

4 l

=4 l

8311210313 831104 J~

/V j y

~i3 -

PDR ADOCK 05000277 0

pon

~

t

. ~.,

COMMONWEALTH OF PENNSYLVANIA :

ss.

COUNPY OF PHILADELPHIA S. L. Daltroff, being first duly sworn, deposes and states as follows:

That he is Vice President of Philadelphia Electric Company, the Respondent herein; that he has read the foregoing response I.E. Bulletin No. 83-03 and knows the contents thereof; i

and that the statements and matters set.forth therein are true and correct to the best of his knowledge, information and belief.

9 4

j.

Subscribed and sworn to-e before me.this day.

of' A

\\

L L_

~

T.

i Ndtary Public

't.

PATRICIA D. SCHOLL

' Notary Pubhc. Ph4 de!phia, Philadttphis' Co.-

My Commisuon bpires february 10. 1936

,.fk

+

e 3

q e.s y y.

9; Mf

,_m s_

.._"...