Thomas J. Mutin Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 201/4306316 Vica President Engineering and Construction l
November 4, 1983 i
So - 354 So-3 5 G Dr. Thomas E. Murley, Administrator U.S.
NucleLr Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenuo King of Prussia, Pennsylvania 19406
Dear Dr. Murley:
NRC IE BULLETIN NO. 80-20, DATED JULY 31, 1980 FAILURES OF WESTINGHOUSE TYPE W-2 SPRING RETURN TO NEUTRAL CONTROL SWITCHES HOPE CREEK GENERATING STATION On December 23, 1980, PSE&G reported to the NRC that the Bechtel Power Corporation, our Architect Engineer, indicated that answers were received from all vendors, except the "O" HVAC vendor, that Westinghouse Type W-2 control switches with spring return to neutral position are not being used or planned or use at the Hope Creek Generating Station.
I Since that time, Bechtel has restated their position due to a survey of_all "O" purchase orders, including those in the NSSS scope-of-supply.
All vendors have confirmed that Westinghouse W-2 control switches.will not be used on "O" equipment supplied to the Hope Creek Generating Station.
This will. conclude our response to the subject bulletin.
Very truly yours, f
gg/,2 PTL:cag h
8311210332 831104 PDR ADOCK 05000354 9
- e 0 PDR..w, 1
0
.--s.
r Dr. Thomas E. Murley 11/4/83 l
l CC:
Off'ce of Inspection & Enforcement Division of Reactor Construction Inspection Washington, D.C.
20555 NRC Resident Inspector - Hope Creek P.O. Box 241 Hancocks Bridge, New Jersey 08038 DM03 1/2 i