Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20091A611 + (17:47:08, 13 December 2024)
- 05000318/LER-1984-005, :on 840426,diesel Generators 12 & 21 Inoperable Simultaneously.Caused by Personnel Error.List of Equipment Required to Maintain Diesel Generator Operability Prepared & Operators Will Be Trained on Event Condition + (17:47:10, 13 December 2024)
- ML20091A606 + (17:47:11, 13 December 2024)
- ML20091A602 + (17:47:11, 13 December 2024)
- 05000373/LER-1984-024, :on 840423 & 0502,electrical Cable Penetrations AB2214 & AB2186 Declared Inoperable.Caused by Inadequate Seal in Hole of Firestop.Firestops Repaired. Personnel Will Be Trained on Rev Procedure + (17:47:13, 13 December 2024)
- ML20091A593 + (17:47:14, 13 December 2024)
- ML20091A591 + (17:47:15, 13 December 2024)
- ML20091A588 + (17:47:15, 13 December 2024)
- 05000374/LER-1984-016, :on 840423,Div 2 Reactor Water Cleanup High Ambient Temp Isolation Signal Received.Cause Unknown. Reactor Water Cleanup Rooms Checked for Leaks & Caution Card Placed by Div 2 Switches to Warn of Problem + (17:47:17, 13 December 2024)
- ML20091A586 + (17:47:18, 13 December 2024)
- ML20091A575 + (17:47:21, 13 December 2024)
- ML20091A574 + (17:47:22, 13 December 2024)
- ML20091A571 + (17:47:23, 13 December 2024)
- ML20091A567 + (17:47:24, 13 December 2024)
- ML20091A564 + (17:47:24, 13 December 2024)
- ML20091A558 + (17:47:25, 13 December 2024)
- RBG-17-827, Final Deficiency Rept DR-129 Re Agastat Relays w/CR0095 Bases Supplied by Ge.Condition Determined Not Reportable Under 10CFR50.55(e) + (17:47:25, 13 December 2024)
- ML20091A554 + (17:47:26, 13 December 2024)
- ML20091A551 + (17:47:27, 13 December 2024)
- ML20091A553 + (17:47:27, 13 December 2024)
- ML20091A549 + (17:47:28, 13 December 2024)
- ML20091A548 + (17:47:29, 13 December 2024)
- ML20091A544 + (17:47:29, 13 December 2024)
- ML20091A542 + (17:47:30, 13 December 2024)
- ML20091A536 + (17:47:31, 13 December 2024)
- ML20091A535 + (17:47:32, 13 December 2024)
- ML20091A534 + (17:47:33, 13 December 2024)
- W3P84-1353, Forwards Clarifications to FSAR Chapter 14 Re Startup Test Program.Understands Clarifications Acceptable to NRC + (17:47:33, 13 December 2024)
- ML20091A529 + (17:47:34, 13 December 2024)
- ML20091A527 + (17:47:35, 13 December 2024)
- ML20091A525 + (17:47:35, 13 December 2024)
- ML20091A523 + (17:47:36, 13 December 2024)
- ML20091A524 + (17:47:36, 13 December 2024)
- ML20091A517 + (17:47:37, 13 December 2024)
- ML20091A507 + (17:47:38, 13 December 2024)
- RBG-36-637, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-458/91-24.Corrective Actions:Developed Engineering Dept Procedure EDP-ME-27 to Provide Methodology to Feed Back Info from Diagnostic Testing & Maint + (17:47:38, 13 December 2024)
- ML20091A506 + (17:47:39, 13 December 2024)
- ML20091A505 + (17:47:39, 13 December 2024)
- ML20091A502 + (17:47:41, 13 December 2024)
- ML20091A497 + (17:47:42, 13 December 2024)
- ML20091A492 + (17:47:42, 13 December 2024)
- 05000263/LER-1978-007-03, /03L-0:on 780508,steam Leak Discovered in 45 Degree Elbow on HPCI Steam Supply Line Drain Line to Condenser.Caused by Erosion.Temporary Clamp Repair Made + (17:47:44, 13 December 2024)
- 05000263/LER-1978-011-01, /01T-0:on 780606,four of Six APRM Scram Trip Settings Three to Four Percent Low.Aprm Calibr at 50% Power. Gain Settings Corrected + (17:47:46, 13 December 2024)
- 05000263/LER-1978-009-03, /03L-0:on 780525,trip of Essential MCC B33A Supply Breaker 52-304 Resulted in Operation in Degraded Mode Permitted by Various Lco.Cause Unknown.Evaluation Continuing + (17:47:48, 13 December 2024)
- 05000263/LER-1978-008-03, /03L-0:on 780525,inlet Air Heater Operating at Reduced Capacity Due to Fuse Failure.Fuse Block & Fuses Replaced in Kind + (17:47:50, 13 December 2024)
- ML20091A464 + (17:47:51, 13 December 2024)
- 05000263/LER-1978-010-03, /03L-0:on 780605,CRD 06-19 Delayed for Indefinite Period of Time.Caused by Buna N Disc in Scram Pilot Solenoid Plunger Broken in Several Pieces.Plunger Including Disc Replaced + (17:47:53, 13 December 2024)
- 05000263/LER-1978-012-03, /03L-0:on 780616,lightning Storm Resulted in Plant Substation Lockouts Deenergizing Auxiliary Reserve Transformer.Relay Failed Due to Short Circuit Failure of Zener Diode in Trip Pulse Isolator Output + (17:47:55, 13 December 2024)
- ML20091A452 + (17:47:56, 13 December 2024)
- 05000263/LER-1978-014-01, /01T-0:on 780728,CRD 30-47 Delayed Approx 1.4 Before Scramming.Disc in Scram Pilot Valve Solenoid Plunger Broken Into Several Pieces,Wedging & Preventing Valve from Venting Air on Scram Valves + (17:47:58, 13 December 2024)
- ML20091A442 + (17:47:59, 13 December 2024)