ML20091A452

From kanterella
Jump to navigation Jump to search
Responds to Dl Ziemann Transmitting Six Criteria for Individuals Qualified in Radiation Protection Procedures
ML20091A452
Person / Time
Site: Monticello, Prairie Island  Xcel Energy icon.png
Issue date: 04/28/1977
From: Wachter L
NORTHERN STATES POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 9105150376
Download: ML20091A452 (3)


Text

, _ _ _ _ _ - _ - - _ _ -

~

NSP NORTHERN 5TATES POWER COMPANY MIN N E A polis. MIN N E soTA 55401 7

April 28, 11t77 DOCHTqq j'

f4,y, (i. - fjk l

{*

Mr. James C. Keppler

/

Director - Region III

\\Q v Office of Inspection and Enforcement

' <j United States Nuclear Reguistory Commission N w

/

799 Roosevelt Road

~

Clen Ellyn, Illinoin 60137 Dear Mr. Keppler MONTICELLO NUCLEAR CENERATING PLANT Docket No. 50-263 License No. DPR-22 PRAIRIE ISLAND NUCLEAR CENERATING PLAhT Docket No. 50-282 License No. DPR-42 Docket No. 50-306 License No. DPR-60 MSP received letters for the Monticello and Prairie Island dockets, dated March 15, 1977, from Mr. D. L. Zimmann of Operating Peactors Branch f2, Division of Operating Reactors, which transwitted six criteria for

" individuals qualified in radiation protection procedures." The lettet further stated that the 1&E inspector assigned to our facility will be using the same criteria in determining whether the designated individuals on operating shifts meet these requirements. The plants have reviewed the criteria and have detezzined that the desi uated individuals on each t

operating shif t are qualified in radiation protection procedures as described in the first five criteria.

The requirement that "an individual qualified in radiation protection shall be on site at all cimes that there is fuel on site" was included in an Administrative Controle Technical Specification revision for the Monticello Plc 3 in April,1973, and was contained in the original Technical Spe. (fications for the Prairie Island Plant in August, 1973. During the discussions with the Regulatory Staff on proposed reviatone to the Administrative Controls section of the Technical specifications in 1972 and 1973, it was explained to vs that this requirement was to provide interim radiation protection coverage during unexpected situations on backahif ts or weekends until the arrival of Radiation Protection Specialists.

We agree that the actions related ec. criteria 1-5 are those that might have to be provided by the operating shift on an interim baats until the arrival of radiation protection personnal. The sixth criteria requires 37fOL/00 N 9105150376 770428 PDR ADOCK 05000263 P

PDR

m m

u

.. -, c J

i Mr. James C. Keppler April 28. 1977 i

l that the designated individuel ba qualified to " conduct other routine radiological duties (e.g.. Ts aur teillance itene) as may be required 4

on backshifts or waekends." We Fmve found that there is no need en schedule the perform 4nce of " routine radiological duties" on backshif ts or weekends. There is no basis, tt refore, that shif t operating personnel be trained or certiftsd far " routine radiological duties" as described in the sixth criterie.

If Technical Specification surveillance items arise unexpectedly on a backahite or weekend. such as a startup chemistry or of f-gas samples. Radiation Protection Specialists are called j

in to conduct such activities.

Yours very truly.

L. J. Wachter Vice President - Power Production

.t3 and System Operation k D. L. Ziemann cc:

J r. G. Charnoff Ninnesota Pollution Control Agency Attention:

Mr. J. W. Ferman N

3 4

1 i'

CV k)

V j

a k

i i

l n

- - ~

-.n m

er

,-.,g-e r

-e e-

-c-e

)

ponu 195 v.s, nucle An at ovLatony couutssioN oIor dT Nuuee n-24 3 a

N F-HIBUTION,, &nR T 50 DOCKET MATERI AL

'""'A M / N iO:

Mr..' ads G. Keppler F R'OM: NSP oArt er oocuutNT Minneapolis, Minnesota 55401 Oh-28-77 L. J. k'achter DAtt nectivto 05-03-77 Mc TTc n ONoTonizeo enoP tNPUT FonM NvMBCn oF coPetS ntCEW:w DonsciNAL fitDNc LAssirit o

/

e J6oey

/

L_-

useniPTiottr. Raf D. L. Ziemnn 03-15-77 lir.

ENC' 5""5 Advising designated individuals on each operating shift are qualified in radiatic 1

protection procedures as described.in thh first five criteria, and no basis, them Fore that shift operating personnel be tmined or certified for routine radiological dut les as described in the sixth criteria....

{

( 2 pages )

MCKNOWLEDGED.

i j

PLANT NAME:

MONTICELIO FF)IRIE ISLAND UNITS 1&2 0I10NOT REMOVE SAFETY FOR ACTION /INFOR:..ATION rgry,an ASSIGNED AD:

___ ASSIGNED _ADi U._WLLLLS I S)

ERANCILCllIEF:

1RANCILCUIEF:

f JA0 JECT J NAGEPd td&W PROJECT !!ANAGERt i

) /IllCdSlT_. :

. fp LIC_, ASST. :

4 m

3 INTERNAL DISTRIBUTJOjN REG F '

SYST7,MS SAFETY PLANT SYSTEMS SLTF SAEETY_&

m R

llEINEMAN TEDESCO ENVIR0_1d% LYSIS l _[. _ _._I

& E [ L.)

SCHROEDER JINA}1QYA

_DENION_6_lfATM' l ji OELD LAINAS

- / GOSSICK & STAFF ENGINEE_ RING IPP_O. LIT 0_

JHVIR0_IECII-MIPC MACARPY CASE BOSUAK ERNST KIRKWOOD 1

BALLARD ItANAUER Sill'gIL OPERATING REACTORS SPANGLER llARLESS 1%k'LI_CXI STELLO SITE TECl!.

l PROJECT MANAGEMENT REACTOR SAEETY OPERATING TECII.

CAlbtILL BOYD ROSS

/

EISEN11UT STEPP

- P.-COLLINS NOVAX

((/

.J11AO

_l{ULMAN 110USTON ROS7.TOCZY J AER l

PETERSON CNECK BtrTLER SITE ANALYSIS MELTZ

/ __CRiggS VOLLMER HELTEMES AT & I BUNCil SKOElI0LT SALTjMAN

/

f~dOLLINS RUTRERG KREGER i

EXTERN AL DISTRIDUTION CONTROL NUMBE R

.LPDR; //h ridC 94, t ///4

,_NAT _LABj

_DR00KilAVEUIAT._LAIL TIC:

REC'V.IE

__UiRIKSON TORNL) t NS.IC_;.

LA_PDR ASLB:,,

CONSULTANT :

N, ggg*

m L,ACRS /h CYS 410LDNtef (E} IW6~

U i

. -. ~

_