Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20093A442 + (15:46:24, 13 December 2024)
- ML20093A441 + (15:46:25, 13 December 2024)
- ML20093A440 + (15:46:26, 13 December 2024)
- ML20093A436 + (15:46:26, 13 December 2024)
- ML20093A435 + (15:46:27, 13 December 2024)
- NRC-84-0097, Provides Preservice Insp Program Supplemental Data Re Relief Request Described in ,Per NRC 840625 Telcon. Weldments on Listed Pump & Pipe Supports Visually Inspected During Const.Records Supporting Insp Available Onsite + (15:46:28, 13 December 2024)
- ML20093A431 + (15:46:28, 13 December 2024)
- ML20093A430 + (15:46:29, 13 December 2024)
- ML20093A427 + (15:46:30, 13 December 2024)
- AECM-84-0344, Advises That Util Completed Comprehensive Review of Tech Specs.Pending Incorporation of Proposed Changes,Tech Specs Accurately Reflect Plant as-built Condition & Will Support Full Power Operation + (15:46:31, 13 December 2024)
- ML20093A423 + (15:46:31, 13 December 2024)
- ML20093A420 + (15:46:32, 13 December 2024)
- 1CAN078402, Requests Written Concurrence That 21,300 Gallons of Protected Water Sufficient to Allow Manual Switchover to Svc Water,Per NRC 840517 Request & NUREG-0737,Item II.E.1.1 + (15:46:33, 13 December 2024)
- ML20093A418 + (15:46:33, 13 December 2024)
- 3F0784-04, NPDES Noncompliance Notification:On 840630,plant Exceeded 3 H Condenser Delta T Limit.Caused by Operator Error + (15:46:34, 13 December 2024)
- NLS8400182, Revised Application for Amend to License DPR-46,consisting of Proposed Change 10 to Tech Specs Re Diesel Operability During Refueling Operations + (15:46:34, 13 December 2024)
- ML20093A412 + (15:46:35, 13 December 2024)
- 05000325/LER-1984-008, :on 840606,control Bldg Emergency Air Filtration Sys Trains a & B Inoperable Due to Thermal Overload Trip of Unit Motors.Caused by Successive Starts & Stops of Trains.Addl Training Underway + (15:46:37, 13 December 2024)
- ML20093A410 + (15:46:38, 13 December 2024)
- ML20093A409 + (15:46:39, 13 December 2024)
- ML20093A404 + (15:46:40, 13 December 2024)
- NRC-84-0096, Documents Addl Evaluation by Snupps & Westinghouse Providing Appropriate Basis for Resolution of Item 2 in Re Environ Errors for Setpoint Calculations Related to Diverse Protection Trip Functions + (15:46:40, 13 December 2024)
- ML20093A402 + (15:46:42, 13 December 2024)
- RBG-18126, Final Part 21 Rept DR-163 Re Missing Set Screw Used to Install Flexible Coupling Drive Hubs on Shaft of TDI-supplied Standby Diesel Generator.Initially Reported on 840601.Hub Reinstalled + (15:46:43, 13 December 2024)
- ML20093A399 + (15:46:43, 13 December 2024)
- NRC-84-0101, Forwards Nonproprietary Equipment Qualification Data Packages,Per May 1984 Request for Addl Info Re Justification for Interim Operation (Jio) & Proprietary Jio Re Seismic Qualification.Jio Withheld (Ref 10CFR2.790) + (15:46:44, 13 December 2024)
- 05000483/LER-1984-001, :on 840612,hourly Fire Watch Patrols for Four Rooms in Control Bldg Missed.Caused by Door Locks Being Changed to Coincide W/Receipt of OL & New Keys Not Issued Promptly.Appropriate Keys Issued + (15:46:46, 13 December 2024)
- ML20093A394 + (15:46:47, 13 December 2024)
- ML20093A395 + (15:46:47, 13 December 2024)
- ML20093A391 + (15:46:49, 13 December 2024)
- ML20093A387 + (15:46:50, 13 December 2024)
- ML20093A389 + (15:46:50, 13 December 2024)
- ML20093A386 + (15:46:51, 13 December 2024)
- ML20093A384 + (15:46:51, 13 December 2024)
- 05000263/LER-1984-022, :on 840605,reactor Bldg Ventilation Isolation & Standby Gas Treatment Initiation Occurred.Caused by Blown Fuse in Reactor Bldg Spent Fuel Pool Radiation Monitor Channel B.Fuse Replaced + (15:46:53, 13 December 2024)
- ML20093A382 + (15:46:54, 13 December 2024)
- 05000374/LER-1984-026-01, :on 840609,Div I Leak Detection Isolation Signal Received Causing Isolation Valve 2G33-F004 to Close & Reactor Water Cleanup Pumps to Trip.Cause Unknown.Isolation Logic Reset & Cleanup Sys Restarted + (15:46:56, 13 December 2024)
- ML20093A377 + (15:46:57, 13 December 2024)
- RBG-18125, Interim Deficiency Rept DR-200 Re Foreign Substance in Reactor Pressure Vessel.Interim or Final Status Rept Will Be Provided by 840913 + (15:46:57, 13 December 2024)
- ML20093A375 + (15:46:58, 13 December 2024)
- ML20093A372 + (15:46:59, 13 December 2024)
- ML20093A370 + (15:46:59, 13 December 2024)
- ML20093A368 + (15:47:00, 13 December 2024)
- ML20093A366 + (15:47:01, 13 December 2024)
- ML20093A357 + (15:47:01, 13 December 2024)
- ML20093A344 + (15:47:02, 13 December 2024)
- ML20093A328 + (15:47:03, 13 December 2024)
- ML20093A336 + (15:47:03, 13 December 2024)
- A02399, Discusses Position Re Actuation Logic for Reactor Protection Sys & ESF Actuation Sys.Operation in 2 of 3 Logic Configuration W/One Channel in Bypass Justified.More Restrictive Tech Specs Unnecessary + (15:47:04, 13 December 2024)
- ML20093A320 + (15:47:05, 13 December 2024)
- ML20093A318 + (15:47:06, 13 December 2024)