Interim Deficiency Rept (Rdc 106(84)) Re Direct Indication or Annunciation in Control Room in Event of Loss of 120-volt ac/24-volt Dc Power Supply.Initially Reported on 840508. Investigation Ongoing.Next Rept Will Be Provided by 840914
ML20093A395
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 06/07/1984
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
(RDC-106(84)), NUDOCS 8407100436
Download: ML20093A395 (2)


Text

r 4 -

on2B u

-2 t

P.o. BOX 5000 - CLEVELAND, OHIO 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLOG- - 5S PUBLIC SOUARE Serving The Best Location in the Nation MURRAY R. EDELMAN vlCE PRESIDENT NUCLE A R June 7, 1984 Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE: Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Annunciation of Loss of 120 Volt AC/24 Volt DC Power Supply

[RDC 106(84)]

Dear Mr. Keppler:

This letter serves as the interim report on the potential significant deficiency regarding direct indication or annunciation in the control room in the event of loss of 120 Volt AC/24 Volt DC power supply. Mr. R. Knop of your of fice was notified on May 8,1984, by Mr. T. A. Boss of The Cleveland Electric Illuminating Company (CEI) that this problem was being evaluated per our Deviation Analysis Report 183. This potential deficiency was identified as a result of the safety system functional capability review performed for (II by GDS. Associates.

This report contains a description of the deficiency, the corrective action being pursued, and the planned date for our next report.

Description of Deficiency The GDS Associates' review identified equipment / instrumentation in three systems (M23, Motor Control Center and Switchgcar Area HVAC; P47, Control Complex Chillers; and M17, Containment Vacuum Relief) for which control room annunciation of the loss of 24 Volt DC power was not provided.

8407100436 840607 PDR ADOCK 05000440 S pyg JUN 121984 Sid? b

f 4 .

Mr. Jtres G. Keppler June 7, 1984 Corrective Action A study is being performed to identify all loads on 24 Volt DC Safety-Related Power Supplies and existing alarms. .This review will determine the need for annunciation on loss of 24 Volt DC Safety-Related Power Supplies.

We will submit our next report on this subject on or before September 14, 1984.

Please call.if there are any questions.

Sincerely, M. R. E elman Vice President Nuclear Group MRE:pab cc: Mr. J. A. Grobe USNRC, Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C. 20555 Records Center, SEE-IN Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339