ML20093A336

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 83-51 Re Failure of Auxiliary Feedwater Pump to Pass Hot Functional Test.Due to Extensive Investigation,Final Rept Delayed Until 840815
ML20093A336
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 06/26/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-29830-TDS, DER-83-51, NUDOCS 8407100349
Download: ML20093A336 (2)


Text

r q-RECey50 xnc Anzona Public Service Company

% J!!! 23 pg y 3, June 26, 1984 Rg;IC/!Vl.a s ANPP-29830-TDS /IRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 83-51 A 50.55(e) Potentially Reportable Deficiency Relating To Unit 1 Auxiliary Feedwater Pump Failed To Meet Requirements Of Hot Functional Test File: 84-019-0?.6; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and R. Tucker on August 2, 1983 (B) ANPP-27602, dated August 22, 1984 (Interim Report)

Dcar Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by June 28, 1984.

Due to the extensive investigation and evaluation required, it in now 15,1984, at expected that this information will be finalized by August which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

I Very truly o.irp e

CLLL

'T LLL_

E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Froject Director EEVB/TRB:db cc: See Page Two 8407100349 840626 PDR ADOCK 05000520 S

PDR J. E -r7 '[s

^

7 y

Mr. T. W. Bishop DER 83-51 Page Two

~

cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. N clear Regulatory Commission u

Washington, D. C. 20555 T. G. W'ods, Jr.

o D. B. Karner W. E. Ide D. B. Fasnacht-A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen.

J. A. Brand A. C. Gehr W. J. Stubblefield' W. G. Bingham R. L. Patcerson R. W. Welcher H. D. Foster-D. R. Hawkinson L. E. Vorderbrueggen R..P. Zinserman S. R. Frost

~ J. Self

,D. Canady T. D. Bloom Records Center Institute of Nuclear Power Operations

-1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339

.