Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20093E838 + (15:30:15, 13 December 2024)
- ML20093E829 + (15:30:16, 13 December 2024)
- ML20093E817 + (15:30:22, 13 December 2024)
- ML20093E804 + (15:30:23, 13 December 2024)
- ML20093E801 + (15:30:24, 13 December 2024)
- 05000289/LER-1995-003-01, :on 950909,reactor Coolant Leak Occurred Due to Crack Weld in Cold Leg Drain Line.Failed Line Replaced.W/ + (15:30:26, 13 December 2024)
- 05000368/LER-1984-024, :on 840828,reactor Trip Occurred.Caused by Dropped Control Element Assembly (Cea).Silicon Controlled Rectifiers Replaced for Cea.Power Supply fuses,opto-isolator Cards & Coil Driver Cards Replaced + (15:30:31, 13 December 2024)
- 05000413/LER-1984-009-02, :on 840827,boron Sampling Procedures Using Reactor Coolant Failed to Provide Viable Data for Seven Consecutive Sampling Periods.Caused by Lack of Sample Flow & Erroneous Sample Location + (15:30:34, 13 December 2024)
- ML20093E793 + (15:30:35, 13 December 2024)
- 05000237/LER-1984-004-02, :on 840222,during Procedure DOS 1400-2, Core Spray Valve Operability Test, Core Spray Suction Valve MO-2-1402-3A Failed to Close from Control Room.Caused by Faulty Auxiliary Breaker Contact + (15:30:36, 13 December 2024)
- 05000259/LER-1984-025-01, :on 840615,review of Bldg Heat Sys During IE Bulletin 79-14 Insp Determined That Isolation Between Turbine & Reactor Bldg Heat Sys Lines Inadequate.Caused by Failure to Follow Design Criteria + (15:30:39, 13 December 2024)
- 05000374/LER-1984-029-01, :on 840611,w/unit at 0% Power in Mode 2, Isolation of Reactor Water Cleanup Occurred Due to High Differential Flow.Caused by Differences Between Influents to & Effuents from Reactor Water Cleanup Sys + (15:30:42, 13 December 2024)
- 0CAN109503, Forwards List of Westinghouse Alloy 600 Tt Mechanical Plugs in Use at Facility + (15:30:43, 13 December 2024)
- ML20093E768 + (15:30:44, 13 December 2024)
- ML20093E764 + (15:30:45, 13 December 2024)
- ML20093E755 + (15:30:46, 13 December 2024)
- ML20093E751 + (15:30:47, 13 December 2024)
- ML20093E753 + (15:30:47, 13 December 2024)
- ML20093E749 + (15:30:48, 13 December 2024)
- ML20093E736 + (15:30:49, 13 December 2024)
- ML20093E746 + (15:30:49, 13 December 2024)
- ML20093E735 + (15:30:50, 13 December 2024)
- A04104, Forwards Overview Re Appeal for Requested Mod of Hydrogen Purge Sys Valves to Close on Radiation Signal,Per Generic Ltr 84-08 & NUREG-0737,Item II.E.4.2.7, Containment Venting at Power. Addl Info Re Leakage Testing Expected by 840730 + (15:30:51, 13 December 2024)
- ML20093E734 + (15:30:51, 13 December 2024)
- ML20093E731 + (15:30:52, 13 December 2024)
- ST-HL-AE-5202, Forwards Rev 0,Suppl 1 to ISI Plan for First Insp Interval of South Tx Project Electric Generating Station Unit 1 + (15:30:53, 13 December 2024)
- ML20093E718 + (15:30:54, 13 December 2024)
- ST-HL-AE-5203, Forwards Addl Info Re Proposed Amend to TS Surveillance 4.8.1.1.2.e.7 to Allow Performance of Surveillance W/Plant at Power + (15:30:55, 13 December 2024)
- 05000364/LER-1984-006, Forwards Pertinent Design Drawings for Diesel Generator 2B, in Response to N Merriweather Request Re LER 84-006-00. Oversized Aperture Card Encl + (15:30:57, 13 December 2024)
- ML20093E704 + (15:30:58, 13 December 2024)
- ML20093E698 + (15:30:59, 13 December 2024)
- 05000413/LER-1984-010-02, :on 840901,reactor Control Rods from More than One Bank Withdrawn at Same Time.Caused by Procedural Deficiency.Main Reactor Trip Breakers Opened.Procedures Revised to Guard Against Similar Occurrences + (15:31:02, 13 December 2024)
- ML20093E690 + (15:31:03, 13 December 2024)
- A04078, Forwards Response to Bj Youngblood 840525 Request for Addl Info Re Evacuation During Emergency & Review of FSAR Section 3.9.3.W/one Oversize Drawing.Aperture Card Available in PDR + (15:31:04, 13 December 2024)
- ML20093E673 + (15:31:05, 13 December 2024)
- ML20093E666 + (15:31:06, 13 December 2024)
- 05000334/LER-1984-010, :on 840315,hydrogen Recombiner Inoperable Due to Thermal Blower Tripping During Flow Adjustment.Caused by Interference Due to Mispositioned Wire.Wire Repositioned & Maint Personnel Cautioned on Meter Work + (15:31:08, 13 December 2024)
- ML20093E661 + (15:31:09, 13 December 2024)
- L-20-115, CFR 50.55a Request Number 2-TYP-4-RV-07 for Bottom Mounted Instrumentation Penetration Examinations + (15:31:10, 13 December 2024)
- RBG-42059, Monthly Operating Rept for Sept 1995 for River Bend Station + (15:31:11, 13 December 2024)
- ML20093E647 + (15:31:12, 13 December 2024)
- ML20093E650 + (15:31:12, 13 December 2024)
- ML20093E644 + (15:31:13, 13 December 2024)
- ML20093E640 + (15:31:14, 13 December 2024)
- ML20093E641 + (15:31:14, 13 December 2024)
- ML20093E637 + (15:31:15, 13 December 2024)
- ML20093E630 + (15:31:16, 13 December 2024)
- ML20093E633 + (15:31:16, 13 December 2024)
- ML20093E625 + (15:31:17, 13 December 2024)
- ML20093E624 + (15:31:18, 13 December 2024)
- ML20093E621 + (15:31:19, 13 December 2024)