ML20093E637

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Jul 1995 for Comanche Peak Ses Unit 2
ML20093E637
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/31/1995
From: Julie Hughes
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20093E632 List:
References
NUDOCS 9510170012
Download: ML20093E637 (1)


Text

-

Attachment to TXX 95261

. Page '9 of 10 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC HONTHLY OPERATING REPORT REV. 1 DOCKET NO.:

50 446 UNIT:

CPSES 2 DATE:

10/12/95 COMPLETED BY:

Janet Hughes TELEPHONE:

817/897 5331 OPERATING STATUS 1.

REPORTING PERIOD:

JULY 1995 GROSS HOURS IN REPORTING PER00:

744 2.

CURRENTLY AUTHORIZED POWER LEVEL (HWt):

3411 MAX. DEPEND. CAPACITY (HWe Net):

1150 DESIGN ELECTRICAL RATING (HWe Net):

1150 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (HWe Net):

NONE 4

REASON FOR RESTRICTION (IF ANY):

THIS HONTH YR TO DATE CUMULATIVE 5

NUMBER OF HOURS REACTOR WA3 CRITICAL 744 4.829 13,946 6

REACTOR RESERVE SHUTDOWN h0VRS 0

0 2.154 7

HOURS GENERATOR ON LINE 744 4,790 13.730 8

UNIT RESERVE SHUTDOWN HOURS 0

0 0

9 GROSS THERHAL ENERGY GENERATED (HWH) 2.537.400 16.177.265 43.477.190

10. GROSS ELECTRICAL ENERGY GENERATED (HWH) 850.624 5.459.767 14.615.822
11. NET ELECTRICAL ENERGY GENERATED (HWH) 817.024 5.236.706 13.931.662
12. REACTOR SERVICE FACTOR 100.0 94.9 79.9
13. REACTOR AVAILABILITY FACTOR 100.0 94.9 92.2
14. UNIT SERVICE FACTOR 100.0 94.2 78.6
15. UNIT AVAILABILITY FACTOR 100.0 94.2 78.6
16. UNIT CAPACITY FACTOR (USING HDC) 95.5 89.5 69.4
17. UNIT CAPACITY FACTOR (USING DESIGN HWe) 95.5 89.5 69.4
18. UNIT FORCED OUTAGE RATE 0.0 1.1 8.6
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):

20.

IF SHUTDOWN AT END OF REPORTING PERI 00. ESTIMATED DATE OF STARTUP:

21.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

ACHIEVED COMMERCIAL OPERATION 930803 9510170012 951013 ESTIMATED PDR ADOCK 05000445 R

PDR