Attachment to TXX 95261 Page 1 of 10 C0HANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC HONTHLY OPERATING REPORT DOCKET NO.:
50 445 UNIT:
CPSES 1 DATE:
10/12/95 COMPLETED BY:
Janet Hughes TELEPHONE:
817/897 5331 OPERATING STATUS 1.
REPORTING PERIOD:
SEPTEMBER 1995 GROSS HOURS IN REPORTING PER0D:
720 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
3411 MAX. DEPEND. CAPACITY (HWe Net):
1150 DESIGN ELECTRICAL RATING (HWe Net):
1150 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (HWe Net):
NONE i
4 REASON FOR RESTRICTION (IF ANY):
THIS HONTH YR TO DATE CUMULATIVE 5
NUMBER OF HOURS REACTOR WAS CRITICAL 720 5,377 36,590 i
6 REACTOR RESERVE SHUTDOWN HOURS 0
117 2,557 4
7 HOURS GENERATOR ON LINE 720 5,289 36,035 8
UNIT RESERVE SHUTDOWN HOURS 0
0 0
9 GROSS THERMAL ENERGY GENERATED (MWH) 2,451,485 17.468,376 116.403,482
- 10. GROSS ELECTRICAL ENERGY GENERATED (HWH) 813.170 5,808,841 38.705,468
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 779,394 5,544,093 36,907,540 i
- 12. REACTOR SERVICE FACTOR 100.0 82.1 81.3
- 13. REACTOR AVAILABILITY FACTOR 100.0 83.9 87.0
- 14. UNIT SERVICE FACTOR 100.0 80.7 80.1
- 15. UNIT AVAILABILITY FACTOR 100.0 80.7 80.1
- 16. UNIT CAPACITY FACTOR (USING HDC) 94.1 73.6 71.3 J
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 94.1 73.6 71.3
- 18. UNIT FORCED OLITAGE RATE 0.0 3.4 4.6
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
20.
IF SHUTDOWN AT END OF REPORTING PERI 00, ESTIMATED DATE OF STARTUP:
21, UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
ACHIEVED COMMERCIAL OPERATION 900813 9510170010 951013 ESTIMATED PDR ADOCK 05000445 R
Attachment to TXX 95261 Page 2 of 10.
AVERAGE DAILY UNIT POWER LEVEL-DOCKET NO :
50 445
' UNIT:
'CPSES 1
DATE:
10/12/95 COMPLETED BY:
' Janet Hughes TELEPHONE:
'817/897 5331 MONTH:
SEPTEMBER 1995 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY
.(HWe Net)
DAY (HWe Net) 1 1065 17 1085 2
1075 18 1084 3
1076 19 1079 4
-1077 20 1090 5
1077 21 1089 6
1078 22 1082 7
1079 23 1084 8
1081 24 1085 9
1083 25 1085 10 1084 26 1085 11 1085 27 1084 12 1085 28 1084 13 1087 29 1084 14 1067 30 1084 15.
1086 31 i
16 1086 I
r 1
Attachment to TX'X 95261 Page 3 of. 10-
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH j
l DOCKET NO.:
50 445 UNIT:
CPSES 1
DATE:
10/12/95 COMPLETED BY:
Janet Hughes 1
TELEPHONE:
817/897 5331 MONTH:
SEPTEMBER'19%
]
DAY TIME REMARK / MODE
-09/01
.0000 Unit started month in MODE 1 at 1001 power.
09/30 2400 Unit ended month in MODE 1 at 100t power.'
l Attachment to TXX-95261 Page 4 of 10 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-445 UNIT:
CPSES 1
DATE:
10/12/95 COMPLETED BY:
Janet Hughes TELEPHONE:
817/897-5331 t
REPORT MONTH.
SEPTEE ER 1995 METHOD OF TYPE SH'JTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)
PIASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS NONE 1)
REASON 2)
METHOD A:
EQUIPMENT FAILURE (EXPLAIN)
E:
OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B:
MAINT OR TEST F:
ADMINISTRATIVE 2: MANUAL SCRAM C:
REFUELING G:
OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:
REGULATORY RESTRICTION H:
OTHER (EXPLAIN) 4: OTHER (EXPLAIN) f
Attachment to TXX 95261-J
.Page 5 of 10 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC HONTHLY OPERATING REPORT DOCKET NO.:
50 446 UNIT:
CPSES 2 DATE:
10/12/95
)
COMPLETED BY:
Janet Hughes TELEPHONE:
817/897 5331 OPERATING STATUS
]
1.
REPORTING PERIOD:
SEPTEMBER 1995 GROSS HOURS IN REPORTING PER00:
720 l
2.
CURRENTLY AUTHORIZED POWER LEVEL (HWt):
3411 MAX. DEPEND. CAPACITY (HWe Net):
1150 DESIGN ELECTRICAL RATING (HWe Net):
1150 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (HWe Net):
NONE 4
4 REASON FOR RESTRICTION (IF ANY):
THIS HONTH YR TO DATE CUHULATIVE 5
NUMBER OF HOURS REACTOR WAS CRITICAL 720 6,293 15,410 6
REACTOR RESERVE SHUTDOWN HOURS 0
0 2,154 7
HOURS GENERATOR ON LINE 720 6.254 15.194 8
UNIT RESERVE SHUTDOWN HOURS 0
0 0
9 GROSS THERHAL ENERGY GENERATED (HWH) 2,451.221 21,162,055 48,461,981
- 10. GROSS ELECTRICAL ENERGY GENERATED (HWH) 824,472 7.132,112 16.288.167
- 11. NET ELECTRICAL ENERGY GENERATED (HWH) 792.462 6,843,646 15,538,602 i
- 12. REACTOR SERVICE FACTOR 100.0 96.1 81.4
- 13. REACTOR AVAILABILITY FACTOR 100.0 96.1 92.8
- 14. UNIT SERVICE FACTOR 100.0 95.5 80.3 i
- 15. UNIT AVAILABILITY FACTOR 100.0 95,5 80.3
- 16. UNIT CAPACITY FACTOR (USING HDC) 95.7 90.8 71.4
- 17. UNIT CAPACITY FACTOR (USING DESIGN HWe) 95.7 90.8 71.4
- 18. UNIT FORCED OUTAGE RATE 0.0 0.9 7.8
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling Outage scheduled to begin February 22, 1996 with an estimated duration of 42 days.
20.
IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
ACHIEVED COMMERCIAL OPERATION 930803 ESTIMATED
i
~
Attachment to TXX 95261 Page 6 of 10 -
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:
50 446 UNIT:
CPSES 2
l DATE:
10/12/95 COMPLETED BY:
Janet Hughes TELEPHONE:
817/897 5331 HONTH:
SEPTEMBER 1995
)
-AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe Net)
DAY (We Net) 1 1092 17 1102
'2 1093 18 1103 3
1092 19 1103 4
1092 20 1105 5
1093 21-1107 6
1094 22 1111 7
1095 23 1091 8
1097 24 1066 9
1099 25 1113 4
1 10 1100 26 1113 11 1100 27 1113 12 1101 28 1112
~
13 1102 29 1112 14' 1102 30 1112 15 1102 31 I
16 1102 t
2 Attachment to TXX %261 Page 7 of 10
SUMMARY
OF OPERATING EXPERIENCE FOR lilE MONTH DOCKET NO.:
50 446 UNIT:
CPSES 2
DATE:
10/12/95 COMPLETED BY:
Janet Hughes TELEPHONE:
817/897 5331 MONTH:
SEPTEMBER 1995 DAY TIME REMARK / MODE 09/01 0000 Unit started month in MODE 1 at 100* power.
09/30 2400 Unit ended month in MODE 1 at 1002 power.
P P
l Attachment to TXX-95261 Page 8 of 10 UNIT SHUTDOWNS AND PCWER REDUCTIONS DOCKET NO.:
50-446 UNIT:
CPSES 2
DATE:
10/12/95 COMPLETED BY:
Janet Hughes TELEPHONE:
817/897-5331 REPORT MONTH.
SEPTElBER 1995 t
METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)
REASON RED'JCING POWER CORRECTIVE ACTIONS /COMENTS NONE 1)
REASON 2)
MEB0D A:
EQUIPMENT FAILURE (EXPLAIN)
E:
OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B:
MAINT OR TEST F:
ADMINISTRATIVE 2: MANUAL SCRAM C:
REFUELING G:
OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:
REGULATORY RESTRICTION H:
OTHER (EXPLAIN) 4: OTHER (EXPLAIN) 1
-