ML20093E736

From kanterella
Jump to navigation Jump to search
Rev 0,Suppl 1 to ISI Plan for First Insp Interval of South Tx Project Electric Generating Station Unit 1
ML20093E736
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/02/1995
From: Beverly R
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20093E727 List:
References
PROC-951002, NUDOCS 9510170059
Download: ML20093E736 (6)


Text

.

4 i

J

)

r i

\\

l SOUTH TEXAS PROJECT ELECTRIC GENERATING i

STATION 1

)

{

INSERVICE INSPECTION PLAN i

FOR THE FIRST INSPECTION INTERVAL i

of the SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - UNIT 1 REVISION 0, SUPPLEMENT 1 P.O. Box 289 Wadsworth, Texas 77483 Owner:

Houston Lighting and Power Company j

City Public Service Board of San Antonio Central Power and Light Company City of Austin Address:

P.O. Box 1700 Houston, Texas 77001 Commercial f

Operation:

AUGUST 25,1988 Issue Date:

OCTOBER 2,1995 i

4 9510170059 951010 PDR ADOCK 05000498 4

Q PDR J

J

4 INSERVICE INSPECTION PLAN FOR THE FIRST INSPECTION INTERVAL of the SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - UNIT 1 REVISION 0, SUPPLEMENT 1 USNRC DOCKET NO.: 50-498 3

l-1 i

OPERATING LICENSE NO.: NPF-76 i

1 COMMERCIAL OPERATION DATE: AUGUST 25,1988 i

i

)WI

'6"7'10 Prepared by:

/

R[L. Beverly Date ISI Engineer l

Reviewed by:

i S. Timmaraju Date Supervisor - Erosion / Corrosion / ISI Group i

f Approvi by:

10 95 S. E. Thomas Date Manager - Design Engineering Department s

4

i e

't South Texas Proje.-' Elec+de Generating Station Uint 1 Docket No. STN 50-498

" Revision 0. Suoc(ement 1. to ISI Plan for First Insoection Interval" Supplement 1, to the ISI Plan for First Inspection Interval, adds the following Section XI Code Cases to Section 2.1.5 of the Plan as follows:

N-356, " Certification Period for Level III NDE Personnel,Section XI, Division 1,2, and 3."

N-402-1, " Eddy Current Calibration Standards,Section XI, Division 1."

. = _. -.

l l

l

)

SOUTH TEXAS PROJECT

)

ELECTRIC CENERATING l

i STATION j

l INSERVICE INSPECTION PLAN FOR THE l

FIRST INSPECTION INTERVAL

l of the SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - UNIT 2 REVISION 0, SUPPLEMENT 1 P.O. Box 289 Wadsworth, Texas 77483 Owner:

Ilouston Lighting and Power Company i

City Public Service Board of San Antonio Central Power and Light Company City of Austin Address:

P.O. Box 1700 Houston, Texas 77001 Commercial Operation:

JUNE 19,1989 Issue Date:

OCTOBER 2,1995

INSERVICFs INSPECTION PLAN FOR THE FIRST INSPECTION INTERVAL of the SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - UNIT 2 REVISION 0, SUPPLEMENT 1 USNRC DOCKET NO.: 50-499 OPERATING LICENSE NO.: NPF-80 COMMERCIAL OPERATION DATE: JUNE 19,1989 I

M

/o,3,1f l

Prepared by:

s R. L. Beverly Date ISI Engineer l

Reviewed by:

  • p' lo, 3, cyg-S. Timmaraju Date Supervisor - Erosion / Corrosion / ISI Group Approved by:

~

to + 95 S. E. Thomas Date Manager - Design Engineering Department l

i

South Texas Project Electric Generating Station Unit 2 Docket No. STN 50-499

" Revision 0. Suoolement 1. to ISI Plan for First insoection Interval" Supplement 1, to the ISI Plan for First inspection Interval addsSection XI Code Case N-356 and updates Code Case N-402 to N-402-1 under Section 2.1.5 of the Plan as follows:

N-356, " Certification Period for Level III NDE Personnel,Section XI, Division 1,2, and 3."

N-402-1, " Eddy Current Calibration Standards,Section XI, Divis;on 1."

f