Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20093G017 + (15:26:52, 13 December 2024)
- 05000282/LER-1984-005, :on 840830,during Surveillance Testing in ex-core Nuclear Instrumentation Cabinets,Reactor Trip Occurred.Caused by Improper Use of Test Leads.Procedures Revised + (15:26:54, 13 December 2024)
- RBG-19046, Interim Deficiency Rept DR-185 Re Placement of Two Isolation Valves Outside Containment for RCIC Turbine Exhaust Line Vacuum Breaker Sys.Next Rept Expected by 841028 + (15:26:55, 13 December 2024)
- ML20093F991 + (15:26:56, 13 December 2024)
- ML20093F990 + (15:26:56, 13 December 2024)
- ML20093F987 + (15:26:57, 13 December 2024)
- ML20093F975 + (15:26:58, 13 December 2024)
- ML20093F985 + (15:26:58, 13 December 2024)
- ML20093F970 + (15:26:59, 13 December 2024)
- ML20093F954 + (15:27:00, 13 December 2024)
- ML20093F966 + (15:27:00, 13 December 2024)
- ML20093F944 + (15:27:01, 13 December 2024)
- ML20093F932 + (15:27:02, 13 December 2024)
- ML20093F930 + (15:27:02, 13 December 2024)
- ML20093F917 + (15:27:03, 13 December 2024)
- LIC-95-0189, Forwards OPPD Fort Calhoun Station Decommissioning External Trust Fund Financial Statements & Independent Auditors Rept, for Period of 940701-950630 + (15:27:04, 13 December 2024)
- ML20093F916 + (15:27:04, 13 December 2024)
- ML20093F893 + (15:27:05, 13 December 2024)
- ML20093F890 + (15:27:07, 13 December 2024)
- ST-HL-AE-1131, Suppl to Final Part 21 & Deficiency Rept Re Snubber Assembly Rear Brackets Provided by NPS Industries,Inc. Encl Correspondence & Memo from Bracket Manufacturer Indicates Item Reportable Per Part 21 + (15:27:08, 13 December 2024)
- ML20093F868 + (15:27:09, 13 December 2024)
- ML20093F862 + (15:27:09, 13 December 2024)
- ML20093F858 + (15:27:10, 13 December 2024)
- ML20093F843 + (15:27:11, 13 December 2024)
- NRC-84-0120, Forwards Westinghouse Proprietary Updated Justification for Interim Operation of Operator Interface Modules (ESE-12A). Info Part of Generic Qualification Program & Should Be Withheld (Ref 10CFR2.790) + (15:27:11, 13 December 2024)
- ML20093F834 + (15:27:12, 13 December 2024)
- ML20093F831 + (15:27:13, 13 December 2024)
- ST-HL-AE-1089, Final Deficiency Rept DER 84-003 Re ESF Load Sequencer Logic Design.Initially Reported on 840224.Design Will Be Revised to Inhibit Closure of Feeder Breaker & to Eliminate Restrip of First Load + (15:27:13, 13 December 2024)
- ML20093F829 + (15:27:14, 13 December 2024)
- ML20093F827 + (15:27:14, 13 December 2024)
- ML20093F820 + (15:27:15, 13 December 2024)
- ML20093F806 + (15:27:16, 13 December 2024)
- ML20093F794 + (15:27:16, 13 December 2024)
- ML20093F792 + (15:27:17, 13 December 2024)
- PY-CEI-NRR-0119, Provides Updated Info Re Results of Mar 1984 Caseload Forecast Panel Visit,Basis for 1985 Completion Projection. Tdi Diesel Generator Requalification Program Underway.Mods Will Be Completed or Identified by End of 1984 + (15:27:18, 13 December 2024)
- ML20093F784 + (15:27:18, 13 December 2024)
- ML20093F775 + (15:27:19, 13 December 2024)
- GO2-84-424, Responds to IE Bulletin 84-02, Failures of GE Type Hfa Relays in Use in Class IE Safety Sys. Plant Maint Procedure for Relay Coil Replacement & Contact Adjustment Revised to Prohibit Use of Hfa 51 Relays + (15:27:20, 13 December 2024)
- ML20093F771 + (15:27:20, 13 December 2024)
- ML20093F759 + (15:27:21, 13 December 2024)
- ML20093F755 + (15:27:22, 13 December 2024)
- ML20093F754 + (15:27:22, 13 December 2024)
- ML20093F749 + (15:27:23, 13 December 2024)
- ML20093F753 + (15:27:23, 13 December 2024)
- ML20093F747 + (15:27:24, 13 December 2024)
- 05000306/LER-1995-004-02, :on 950907,lockout of 2RY Transformer Resulted in auto-start of Number 22 CCW Pump.Caused by Ground Fault on B Phase Substation Terminal of Feeder Cable from 2RSY Transformer.Replaced All Substation Potheads + (15:27:26, 13 December 2024)
- ML20093F739 + (15:27:27, 13 December 2024)
- DCL-84-243, Forwards Response to Govt Accountability Project Allegations Contained in 840323,0412,0503 & 31 Ltrs.All Responses Verified & Prof Resumes of Verifiers Either Previously Submitted or Encl + (15:27:28, 13 December 2024)
- ML20093F713 + (15:27:29, 13 December 2024)
- ML20093F714 + (15:27:29, 13 December 2024)
- L-95-270, Comment Supporting Proposed Rules 10CFR2,50 & 51 Re Decommission of NPPs + (15:27:30, 13 December 2024)