ss 0-
'Af Duquesne 1.idit 2gC7,i33 8412)923-1960 Nuclear Construction Division Telecopy (412) 787-2629 Robinson Plaza, Building 2, Suite 210 October 1, 1984 Pittsburgh, PA 15205 United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 ATTENTION:
Dr. Thomas E. Murley Administrator
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Removed, Dismantled, or Partially Dismantled Pipe Supports Significant Deficiency Report 84-06, Interim Report Gentlemen:
This interim report is in reference to the reportable significant deficiency relating to the removed, dismantled, or partially dismantled pipe suppo rt s.
Pursuant to the requirements of 10 CFR50. 55 (e), it is anticipated that a subsequent report will be submitted to Region I by December 1, 1984.
DUQUESNE LIGHT COMPANY By 3.,
E.(#. Woolever Vice President SDH/wjs Attachment cc:
Mr. R. DeYoung, Director (3) (w/a)
Ms. M. Ley, Project Manager (w/a)
Mr. E. A. Licitra, Project Manager (w/a)
Mr. G. Walton, NRC Resident Inspector (w/a)
INPO Records Center (w/a)
NRC Document Control Desk (w/a)
SUBSCRIBED AND SWp
' ORE ME THIS
/od DAY OF (E p
_, 1984.
d 42 J t
v Public ANITA ELAINE REITER, NOTARY PUBUC ROBINSON TOWNSHIP, ALLEGHENY COUNTY 9
gpro?#7Og00k2 e
o;DR MY COMMISSION EXP!RES OCTOBER 20,1986
/
'I 6
e
X.
.Unitsd.Stctos Nuclect Rsguictory Commission Dr. Thomas E. Murley Page 2 COMMONWEALTH OF PENNSYLVANIA )
)
ES:
COUNTY OF ALLEGHENY
)
On this
/ d day of
////, before me, a Notary Public in and for said Commonwealth and County, personally appeared E. J. Wooiever, who being duly sworn, deposed and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statements set fo rth in the Submittal are true and correct to the best of his knowledge, d L_
Notary Public ANITA ELAINE REITER, NOTARY PUBUC ROBINSON TOWNSHIP, ALLEGHENY COUNTY MY COMMISSION EXPlRES OCTOBER 20,1986
BEAVER VALLEY POWER STATION - UNIT NO. 2 DUQUESNE LIGHT'00MPANY 4
Report on.Significant Deficiency No. 84-06
' Removed, Dismantlad,..or Partially Dismantled Pipe Supports
- 1. - Sunusary Thirty-four ' (34) pipe supports, which ~
originally. installed and were inspected, were discovered to be removed, dismantled, or partially dis-
_ mantled during an inspection by Site-Quality Control (SQC).
A subsequent investigation has identified ten (10) additional pipe support s with similar problems for a. total, to date, of forty-four (44) pipe supports.
An analysis of the identified pipe supports is addressed in paragraph 4.
2.
Immediate Action Taken On' June 11, 1984, Mr. J. Stabb, Compli'ance Engineering in Duquesne Light Company's (DLC) - Regulatory - Af fairs Department, notified Mr.
G. Myer of the NRC Region 1 Of fice - of this reportable de f ic iency.
DLC submitted additional information in le tters 2NRC-4-101,. dated July 12, 1984, and 2NRC-4-137, dated August 31, 1984.
3.
Description of the Deficiency The subject de ficiency is due to a lack of adequate control over the rework or removal of various pipe supports.
- 4.
Analysis of Safety Implications
.0f the forty-four (44) identified pipe suppo rt s, fo rty-three (43) have been evaluated with the following results:
- 1) documentation has been identified which would have ensured reinspection of thirty-nine (39) of these'~ supports; 2) a de tailed investigation of four (4) non-safety-related Seismic Category 11 supports, which did not have adequate docu-mentation to ensure thinspection, has revealed that absence of or failure of these support s would not have resulted in any adverse impacts on safety-related. components, systems, or functions.
- The remaining support has been partially evaluated.
This suppo rt, 2CHS-PSR-278Y, is safety-related, Seismic Category 1. Evaluations to establish the safety significance of the ' absence of this support are ongoing as are the investigations to determine if adequate documentation existed for this support to ensure its reinstallation and reinspection.
To date, no individual suppo rt with identified rework control problems has been determined to be safety significent. However, DLC considers the lack of adequate control of rework to be a deficiency with the potential to= Impact the ' safe operation of the plant, and ~ is committed to pursuing the identification and correction of this issue as with other safety significant de ficiencies.
- 5.
Corrective Action to Remedy the Deficiency The BVPS-2 project has issued FCP-41, " Rework Control Program," dated September 7, 1984, governing the removal of previously accepted work to allow other work to proceed.
Construction is now identifying.s11 addi-tional pipe. supports which have been. dismantled or partially dismantled.
These supports are being entered into the Rework Control Program for tracking.
Any subsequent supports requiring dismantling will also be entered and tracked in this program.
The results of this ef fort will be provided in.the final report.
6.
Additional Reports It is anticipated than a subsequent report will be issued by December 1, 1984.