ML20093F985
| ML20093F985 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 10/03/1984 |
| From: | Tucker H DUKE POWER CO. |
| To: | Adensam E, Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8410150294 | |
| Download: ML20093F985 (2) | |
Text
_,
s DUKE POWER GOMPANY P.O. HOX 33180 CHAHLOTTE, N.O. 28242 (70h 37 1
vnos r.
October 3, 1984
= =. -
.Mr. Harold R. Denton, Director.
Office of~ Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention: Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: Catawba Nuclear Station, Units 1 and'2 Docket Nos. 50-413 and 50-414 Process Control Program
Dear Mr. Denton:
information regarding Catawba's Process Control Program (PCP)g additional In response to your letter dated September 14, 1984 requestin
, please be advised that the Station specific procedures have not been finalized. A Catawba specific PCP will not be needed until just prior to performing solidification or a dewatering process as required by Technical Specifi-cation 3.11.3.
Neither of these processes will be needed to be performed any earlier than March,1985.
At this time, all of Duke's Nuclear Station's PCP's are being reviewed and revised. The Catawba specific PCP will be finished and a copy provided to you by November 30, 1984.
Very truly yours',
4 /k Hal B. Tucker RW0: sib cc: Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Catawba Nuclear Station Mr. Robert Guild, Esq.
' Attorney-at-Law P. O. Box 12097 Charleston, South Carolina 29412 8410150294 843003 PDR ADOCK 05 0
. e
, Mr. Harold R. D:nton, Director
' October 2, 1984 Page 2-
~
cc:
Palmetto Alliance-21351 Devine Street
-Columbia, South Carolina 29205
. Mr. Jesse L. Riley Carolina Environmental Study Group
~854 Henley Place
' Charlotte, North Carolina 28207 S
l' i
't 1
.