- 05000325/LER-1984-022, :on 840906,reactor Water Cleanup Sys Primary Containment Valves 1-G31-F001 & F004 Closed.Caused by Group 3 Primary Containment Isolation Due to Erroneous Reactor Water Cleanup Sys Area High Temp Signal + (15:25:26, 13 December 2024)
- ML20093G485 + (15:25:27, 13 December 2024)
- ML20093G482 + (15:25:28, 13 December 2024)
- ML20093G468 + (15:25:29, 13 December 2024)
- ML20093G481 + (15:25:29, 13 December 2024)
- ML20093G465 + (15:25:30, 13 December 2024)
- 05000395/LER-2019-003-01, (Vcsns), Completion of a Technical Specification Required for Plant Shutdown + (15:25:32, 13 December 2024)
- RBG-19043, Final Deficiency Rept DR-198 Re Use of E6010 Electrodes Instead of E7018 Electrodes on Seven Conduit Supports in Control Bldg.Electrode E6010 Acceptable & Conduit Supports Meet Design Load.Item Not Reportable Per 10CFR50.55(e) + (15:25:33, 13 December 2024)
- ML20093G454 + (15:25:34, 13 December 2024)
- ML20093G436 + (15:25:35, 13 December 2024)
- RBG-19021, Interim Deficiency Rept DR-182 Re Limitorque Motor Operator Failure on Feedwater Isolation Valve.Next Rept Anticipated by 841108 + (15:25:36, 13 December 2024)
- ML20093G427 + (15:25:37, 13 December 2024)
- ML20093G417 + (15:25:38, 13 December 2024)
- ML20093G410 + (15:25:39, 13 December 2024)
- ML20093G414 + (15:25:39, 13 December 2024)
- ML20093G405 + (15:25:40, 13 December 2024)
- TXX-4233, Commits to Perform Study of Environ Qualification of safety-related Mechanical Equipment in Potentially Harsh Environs,Per 840426 Meeting & 831216 Request.Program Description Encl + (15:25:41, 13 December 2024)
- 2CAN109505, Provides Requested Info Re Containment Cooling Response Time TS Change Request + (15:25:42, 13 December 2024)
- ML20093G401 + (15:25:42, 13 December 2024)
- ML20093G392 + (15:25:44, 13 December 2024)
- RBG-19044, Final Deficiency Rept DR-145 Re Design Mods Performed at Location Not Specified by Engineering & Coordination Rept C-3346.Item Not Reportable Per 10CFR50.55(e) + (15:25:44, 13 December 2024)
- ML20093G390 + (15:25:45, 13 December 2024)
- ML20093G387 + (15:25:46, 13 December 2024)
- ML20093G385 + (15:25:47, 13 December 2024)
- ML20093G376 + (15:25:47, 13 December 2024)
- W3P84-2697, Fourth Interim Rept of Significant Const Deficiency 114 Re Damaged safety-related Sys Due to Water Hammers.Initially Reported on 840914.Corrective Action Verification Ongoing. Finalization Anticipated by 841019 + (15:25:48, 13 December 2024)
- ML20093G365 + (15:25:49, 13 December 2024)
- ML20093G362 + (15:25:50, 13 December 2024)
- ML20093G357 + (15:25:51, 13 December 2024)
- ML20093G356 + (15:25:51, 13 December 2024)
- ML20093G353 + (15:25:52, 13 December 2024)
- ML20093G346 + (15:25:53, 13 December 2024)
- ML20093G347 + (15:25:53, 13 December 2024)
- 3F1095-19, Requests That NRC Update Svc List to Reflect Change to Cc: Listing Currently Found After Signature Page of NRC Correspondence Sent to Util + (15:25:54, 13 December 2024)
- ML20093G339 + (15:25:54, 13 December 2024)
- ML20093G337 + (15:25:55, 13 December 2024)
- ML20093G332 + (15:25:56, 13 December 2024)
- ML20093G333 + (15:25:56, 13 December 2024)
- ML20093G323 + (15:25:57, 13 December 2024)
- ML20093G295 + (15:25:58, 13 December 2024)
- ML20093G318 + (15:25:58, 13 December 2024)
- ML20093G284 + (15:25:59, 13 December 2024)
- TXX-4223, Forwards Request for Change to FSAR Table 17A-1 to Satisfy 10CFR50.55(f)(3).Change Clarifies Performance of Leak Tests on Instrument Tubing Between Instrument Isolation Valves & Instruments + (15:26:02, 13 December 2024)
- ML20093G271 + (15:26:03, 13 December 2024)
- ML20093G268 + (15:26:04, 13 December 2024)
- ML20093G264 + (15:26:05, 13 December 2024)
- 05000327/LER-1984-053, :on 840905,both Trains of Auxiliary Bldg Gas Treatment Sys Declared Inoperable Due to Uncontrolled Breach of Auxiliary Bldg Secondary Containment Encl.Caused by Opened Inner & Outer Door.Outer Door Closed + (15:26:07, 13 December 2024)
- ML20093G211 + (15:26:09, 13 December 2024)
- ML20093G201 + (15:26:09, 13 December 2024)
- ML20093G190 + (15:26:10, 13 December 2024)
- ML20093G193 + (15:26:10, 13 December 2024)