- ML20094A734 + (14:59:15, 13 December 2024)
- ML20094A726 + (14:59:16, 13 December 2024)
- 05000373/LER-1995-016-03, :on 950924,initiated Manual Reactor Scram Due to Emergency Governor Lockout Valve Sticking.Oil Samples Taken of Supply Oil (Turbine Lube Oil Sys) for 1A & 1B Turbine Driven Reactor Feed Pump for Analysis + (14:59:18, 13 December 2024)
- ML20094A710 + (14:59:19, 13 December 2024)
- ML20094A716 + (14:59:19, 13 December 2024)
- ML20094A708 + (14:59:20, 13 December 2024)
- ML20094A707 + (14:59:22, 13 December 2024)
- ML20094A698 + (14:59:23, 13 December 2024)
- ML20094A703 + (14:59:23, 13 December 2024)
- 05000373/LER-1984-040, :on 840625,in Startup Mode,Reactor Water Cleanup Sys Isolated on High Differential Flow.Caused by Temp & Pressure Differences Between Startup Operations & Instrument Calibr.Procedure Revised + (14:59:25, 13 December 2024)
- ML20094A695 + (14:59:26, 13 December 2024)
- ML20094A693 + (14:59:27, 13 December 2024)
- RBG-19214, Final Deficiency Rept DR-192 Re Three Duct Pieces Fabricated by Mccroskey Sheet Metal.Initially Reported on 840919.Three Duct Pieces Will Be Refabricated to Acceptable Design. Extent of Problem Limited Only to Duct Pieces Identified + (14:59:28, 13 December 2024)
- ML20094A686 + (14:59:29, 13 December 2024)
- 05000373/LER-1984-041, :on 840628,three Mechanical Penetrations on fire-rated Walls/Floors Not Sealed Properly.Caused by Personnel Not Identifying on Sleeve Schedule.Fire Watch Established.Penetration Sealed + (14:59:30, 13 December 2024)
- ML20094A679 + (14:59:31, 13 December 2024)
- ML20094A675 + (14:59:32, 13 December 2024)
- ML20094A674 + (14:59:33, 13 December 2024)
- ML20094A666 + (14:59:33, 13 December 2024)
- ML20094A665 + (14:59:34, 13 December 2024)
- 05000374/LER-1984-033-01, :on 840608,during Startup Test 2-31,containment Isolation Valve Did Not Close Upon Receipt of Containment Isolation Signal.Caused by Solenoid Valve Improperly Positioned.Solenoid Valve Repositioned + (14:59:36, 13 December 2024)
- ML20094A659 + (14:59:37, 13 December 2024)
- ML20094A656 + (14:59:38, 13 December 2024)
- ML20094A650 + (14:59:38, 13 December 2024)
- ML20094A647 + (14:59:40, 13 December 2024)
- ML20094A639 + (14:59:44, 13 December 2024)
- ML20094A634 + (14:59:45, 13 December 2024)
- ML20094A633 + (14:59:46, 13 December 2024)
- ML20094A626 + (14:59:49, 13 December 2024)
- 05000416/LER-1984-032, :on 840628,during Reactor Vessel Nuclear Heatup,Data Taken to Determine Condensate Pot Movement on Vessel Level Instrumentation.Revised Calibr Procedures Found Three Transmitters Outside Tech Spec Limits + (14:59:50, 13 December 2024)
- RBG-18356, Notifies That Final Submittal Re Containment Issues Raised by Humphreys Will Be Provided by 841015 + (14:59:51, 13 December 2024)
- ML20094A618 + (14:59:52, 13 December 2024)
- ML20094A603 + (14:59:53, 13 December 2024)
- ML20094A611 + (14:59:53, 13 December 2024)
- ML20094A599 + (14:59:54, 13 December 2024)
- ML20094A592 + (14:59:55, 13 December 2024)
- ML20094A582 + (14:59:57, 13 December 2024)
- ML20094A585 + (14:59:57, 13 December 2024)
- ML20094A579 + (14:59:58, 13 December 2024)
- ML20094A577 + (14:59:59, 13 December 2024)
- ML20094A572 + (15:00:00, 13 December 2024)
- ML20094A566 + (15:00:01, 13 December 2024)
- ML20094A568 + (15:00:01, 13 December 2024)
- ML20094A564 + (15:00:02, 13 December 2024)
- ML20094A563 + (15:00:03, 13 December 2024)
- ML20094A559 + (15:00:04, 13 December 2024)
- ML20094A555 + (15:00:05, 13 December 2024)
- ML20094A556 + (15:00:05, 13 December 2024)
- ML20094A550 + (15:00:06, 13 December 2024)
- ML20094A548 + (15:00:08, 13 December 2024)
- RBG-18-269, Interim Deficiency Rept DR-155 Re Personnel Airlock Seals Supplied by Wi Wooley Co.Next Rept Will Be Submitted by 841025 + (15:00:08, 13 December 2024)