|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20196D0241999-06-16016 June 1999 Proposed Tech Specs Re Reactivity Control Incorporating Operating Requirements That Are Consistent with NEDO-21231, Banked Position Withdrawal Sequence ML20206R8161999-05-11011 May 1999 Proposed Tech Specs Re HPCI & RCIC Surveillance Testing ML20206H9771999-05-0505 May 1999 Proposed Tech Specs Modifying Licensing Basis for EDG on- Site Diesel Fuel Storage Requirements & Corresponding TSs ML20207F1171999-03-0303 March 1999 Proposed Tech Specs Page 3/4.6-13 Re Reactor Vessel Matl Surveillance Program Withdrawal Schedule ML20237E0851998-08-24024 August 1998 Proposed Tech Specs Pages Supporting Proposed TS Amend Related to EDG AOT ML20236X7191998-07-31031 July 1998 Proposed Tech Specs Page 3/4.9-5 Re Suppl to EDG for Allowed Outage Time ML20249C7101998-06-26026 June 1998 Proposed Tech Specs Correcting Typos & Updating Bases ML20249B3231998-06-15015 June 1998 Revised Complete Set of TS Pages Re Relocation of Radioactive Effluent TS & Radiological Environ Monitoring Program to ODCM ML20217F9341998-03-26026 March 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20217H2791998-03-25025 March 1998 Proposed Tech Specs 3.6.A.1 & 4.6.A.1,pertaining to Primary Sys Boundary,Thermal & Pressurizations Limitations & Surveillance Requirements & Basis 3/4.6.A ML20203D4981998-02-20020 February 1998 Proposed Tech Specs Pages,Incorporating Ultimate Heat Sink Temperature of 75 F Into TS 3/4.5.B & Bases,As Required by Amend 173 ML20217K5691997-10-24024 October 1997 Proposed Tech Specs Page Adding Footnote Declaring One Containment Isolation valve,30-CK-432,operate for Limited Period Despite Not Being within IST Interval for Reverse Flow Testing ML20211G2311997-09-12012 September 1997 Proposed Tech Specs Re Radiological Environ Monitoring Program Moved to ODCM ML20210K4381997-08-0808 August 1997 Revised TS Pages 3/4.5-7,B3/4.5-6 & B3/4/.5-7 Requiring Verification That SBO-DG Is Operable Prior to Voluntarily Entering LCO ML20196J0041997-07-22022 July 1997 Proposed Revised TS Bases for Section 3.5.F,correcting Volume of Water Available in Refuel Cavity & Dryer/Separator Pool When Flooded to Elevation 114 Ft & Revising Torus Water Volume to Reflect Volume Above Min Pump NPSH ML20136J5501997-03-0707 March 1997 Proposed Tech Specs Rev for Section 3.10, Core Alterations Allowing Removal of Suspect Fuel Bundles Out of Planned Sequence ML20134C9671997-01-24024 January 1997 Proposed Tech Specs 2.0 Re Safety Limits ML20133A6511996-12-23023 December 1996 Proposed Revised Tech Specs 1.0 Re definitions,3.4 Re Standby Liquid Control sys,3.5 Re Core & Containment Cooling systems,3.7 Re Containment Systems & 3.9 Re Auxiliary Electrical Sys ML20132E5491996-12-10010 December 1996 Proposed Tech Specs Table 3.2.C.1 Re Instrumentation That Initiates Rod Blocks,Table 3.2.C.2 Re Control Rod Block Instrumentation Setpoints & Table 4.2.C Re Minimum Test & Calibr Frequency for Control Rod Blocks Actuation ML20135C1461996-11-26026 November 1996 Proposed Tech Specs,Modifying Definition 1.M, Primary Containment Integrity, to Include All Instrument Line Flow Check Valves to Make Definition Consisten W/Lco 3/4.7.A.2.a.4 ML20134K4361996-11-0707 November 1996 Proposed Tech Specs Re Installation of BWROG Enhanced Option 1A ML20117K6551996-09-0505 September 1996 Proposed Tech Specs,Providing Revised TS Pages 3/4.5-7 & 3/4.5-6 ML20116M1561996-08-12012 August 1996 Proposed Tech Specs to Plant TS Section 6.0,Administrative Controls & Sections 6.5.B.10.C & 6.14 of Util Quality Assurance Manual ML20111B4201996-05-0101 May 1996 Proposed Tech Specs,Reflecting Implementation of 10CFR50 App J,Option B ML20108C1071996-05-0101 May 1996 Proposed Tech Specs,Relocating Administrative Controls Re QA Review & Audit Requirements of Section 6 from Plant TS to Boston Edison QA Manual ML20111C2761996-05-0101 May 1996 Proposed Tech Specs 3.1.1 Re Reactor Protection Sys (Scram) instrumentation,3.2.C.1 Re Instrumentation That Initiates Rod Blocks & 3/4.4 Re Standby Liquid Control ML20108C0581996-05-0101 May 1996 Proposed Tech Specs Re Core Alteration to LCO & Surveillance Conditions Associated W/Secondary Containment ML20108A6561996-04-25025 April 1996 Proposed Tech Specs Re Part of Overall Effort to Improve Outage Performance at Plant ML20095E0771995-12-0808 December 1995 Proposed Tech Specs Bases Page B2-2,including GE11 GEXL Correlation Axial Power Profile & R-factor Ranges & Correcting Error in GE11 GEXL Correlation Mass Flux Range in GE Design ref,NEDE-31152-P, GE Fuel Bundle Designs ML20092A4421995-08-31031 August 1995 Corrected Tech Spec Page Re Reactor High Pressure Trip Setting ML20086K2661995-07-14014 July 1995 Proposed Tech Specs Re Section 2.1,Bases:Safety Limits; Section 3.3.C,scram Insertion Times & Section 4.11.C, Minimum Critical Power Ratio to Reflect Use of Advanced GE-11 Fuel Design in Cycle 11 ML20078R6221995-02-15015 February 1995 Proposed Tech Specs Substituting for Pages Contained in Proposed TS Amends Submitted Prior to 950130 Authorization ML20078N4861995-02-0909 February 1995 Proposed Tech Specs,Increasing Reactor High Water Level Isolation Trip Level Setting ML20077M6921995-01-0909 January 1995 Proposed Reformatted Tech Specs & Bases ML20078K8151994-11-22022 November 1994 Proposed TS Pages 3/4.2-20 & 3/4.2-35 Re Tables 3.2.C-1 & 4.2.C ML20078K7961994-11-22022 November 1994 Proposed Tech Specs Re Changes to MSIV Leakage Requirement ML20077A8991994-11-22022 November 1994 Proposed Tech Specs Re Suppression Chamber Water Level ML20077B1861994-11-22022 November 1994 Proposed Tech Specs 3.5.F,4.5.F.1 & 3.9.B.1 & 2 Re EDG Allowed out-of-svc Time ML20072T0521994-09-0606 September 1994 Proposed Tech Specs Modification to Append a of Operating License DPR-35 Re Maintenance of Filled Discharge Pipe ML20072S0501994-09-0606 September 1994 Proposed Tech Specs Re Instrumentation That Initiates Primary Containment Isolation & Initiates or Controls Core & Containment Systems ML20072S0081994-09-0606 September 1994 Proposed Tech Specs Re Primary Containment,Oxygen Concentration & Vacuum Relief ML20072S0861994-09-0606 September 1994 Proposed Tech Specs Re Standby Gas Treatment & Control Room High Efficiency Air Filtration Sys Requirements ML20069M3311994-06-0909 June 1994 Proposed Tech Specs,Increasing Allowed out-of-service Time from 7 Days to 14 Days for Ads,Hpci & RCIC Sys,Including Section 4.5.H, Maint of Filled Discharged Pipe ML20067B7111994-02-0909 February 1994 Proposed Tech Specs Revising Wording for Page 3 of License DPR-35,clarifying Words to Aid Operators & Removing Obsolete Mechanical Snubber Acceptance Criterion BECO-93-156, Proposed Tech Specs Requesting Changes Supporting 24 Month Fuel Cycle (Submittal 3)1993-12-10010 December 1993 Proposed Tech Specs Requesting Changes Supporting 24 Month Fuel Cycle (Submittal 3) ML20059A9361993-10-19019 October 1993 Proposed Tech Specs for Removal of Scram & Group 1 Isolation Valve Closure Functions Associated W/Msl Radiation Monitors BECO-93-132, Proposed Tech Specs Removing Low Condenser Vacuum Scram in Order to Reduce Spurious Scrams,Unnecessary Plant Transients & Turbine First Stage Pressure Setpoint1993-10-19019 October 1993 Proposed Tech Specs Removing Low Condenser Vacuum Scram in Order to Reduce Spurious Scrams,Unnecessary Plant Transients & Turbine First Stage Pressure Setpoint ML20046D0441993-08-0909 August 1993 Proposed Tech Specs,Proposing 24 Month Fuel Cycle ML20044G1331993-05-20020 May 1993 Proposed Tech Specs Reducing MSIV Low Turbine Inlet Pressure Setpoint from Greater than or Equal to 880 Lb Psig to Greater than or Equal to 810 Psig & Reducing Min Pressure in Definition of Run Mode from 880 Psig to 785 Psig BECO-93-016, Proposed TS 3.5.C,D & E Re k-infinity Factor,Spent Fuel Pool Storage Capacity & Max Loads Allowed to Travel Over Fuel Assemblies,Respectively1993-02-11011 February 1993 Proposed TS 3.5.C,D & E Re k-infinity Factor,Spent Fuel Pool Storage Capacity & Max Loads Allowed to Travel Over Fuel Assemblies,Respectively 1999-06-16
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20196D0241999-06-16016 June 1999 Proposed Tech Specs Re Reactivity Control Incorporating Operating Requirements That Are Consistent with NEDO-21231, Banked Position Withdrawal Sequence ML20206R8161999-05-11011 May 1999 Proposed Tech Specs Re HPCI & RCIC Surveillance Testing ML20206H9771999-05-0505 May 1999 Proposed Tech Specs Modifying Licensing Basis for EDG on- Site Diesel Fuel Storage Requirements & Corresponding TSs ML20205A1451999-03-23023 March 1999 Core Shroud Insp Plan ML20207F1171999-03-0303 March 1999 Proposed Tech Specs Page 3/4.6-13 Re Reactor Vessel Matl Surveillance Program Withdrawal Schedule ML20151S3851998-08-31031 August 1998 Long-Term Program:Semi-Annual Rept ML20237E0851998-08-24024 August 1998 Proposed Tech Specs Pages Supporting Proposed TS Amend Related to EDG AOT ML20236X7191998-07-31031 July 1998 Proposed Tech Specs Page 3/4.9-5 Re Suppl to EDG for Allowed Outage Time ML20249C7101998-06-26026 June 1998 Proposed Tech Specs Correcting Typos & Updating Bases ML20249B3231998-06-15015 June 1998 Revised Complete Set of TS Pages Re Relocation of Radioactive Effluent TS & Radiological Environ Monitoring Program to ODCM ML20217F9341998-03-26026 March 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20217H2791998-03-25025 March 1998 Proposed Tech Specs 3.6.A.1 & 4.6.A.1,pertaining to Primary Sys Boundary,Thermal & Pressurizations Limitations & Surveillance Requirements & Basis 3/4.6.A ML20203D4981998-02-20020 February 1998 Proposed Tech Specs Pages,Incorporating Ultimate Heat Sink Temperature of 75 F Into TS 3/4.5.B & Bases,As Required by Amend 173 ML20217K5691997-10-24024 October 1997 Proposed Tech Specs Page Adding Footnote Declaring One Containment Isolation valve,30-CK-432,operate for Limited Period Despite Not Being within IST Interval for Reverse Flow Testing ML20211N6871997-09-16016 September 1997 Rev 9 to Procedure 8.I.1.1, Inservice Pump & Valve Testing Program ML20211G2381997-09-15015 September 1997 Rev 8 to PNPS-ODCM, Pilgrim Nuclear Power Station Odcm ML20211G2311997-09-12012 September 1997 Proposed Tech Specs Re Radiological Environ Monitoring Program Moved to ODCM ML20216C0631997-08-29029 August 1997 Semi-Annual Long Term Program Schedule ML20210K4381997-08-0808 August 1997 Revised TS Pages 3/4.5-7,B3/4.5-6 & B3/4/.5-7 Requiring Verification That SBO-DG Is Operable Prior to Voluntarily Entering LCO ML20196J0041997-07-22022 July 1997 Proposed Revised TS Bases for Section 3.5.F,correcting Volume of Water Available in Refuel Cavity & Dryer/Separator Pool When Flooded to Elevation 114 Ft & Revising Torus Water Volume to Reflect Volume Above Min Pump NPSH ML20210K3551997-07-0101 July 1997 Rev 16 to Procedure 7.8.1, Water Quality Limits ML20136J5501997-03-0707 March 1997 Proposed Tech Specs Rev for Section 3.10, Core Alterations Allowing Removal of Suspect Fuel Bundles Out of Planned Sequence ML20134C9671997-01-24024 January 1997 Proposed Tech Specs 2.0 Re Safety Limits ML20133A6511996-12-23023 December 1996 Proposed Revised Tech Specs 1.0 Re definitions,3.4 Re Standby Liquid Control sys,3.5 Re Core & Containment Cooling systems,3.7 Re Containment Systems & 3.9 Re Auxiliary Electrical Sys ML20132E5491996-12-10010 December 1996 Proposed Tech Specs Table 3.2.C.1 Re Instrumentation That Initiates Rod Blocks,Table 3.2.C.2 Re Control Rod Block Instrumentation Setpoints & Table 4.2.C Re Minimum Test & Calibr Frequency for Control Rod Blocks Actuation ML20135C1461996-11-26026 November 1996 Proposed Tech Specs,Modifying Definition 1.M, Primary Containment Integrity, to Include All Instrument Line Flow Check Valves to Make Definition Consisten W/Lco 3/4.7.A.2.a.4 ML20134K4361996-11-0707 November 1996 Proposed Tech Specs Re Installation of BWROG Enhanced Option 1A ML20117K6551996-09-0505 September 1996 Proposed Tech Specs,Providing Revised TS Pages 3/4.5-7 & 3/4.5-6 ML20116M1561996-08-12012 August 1996 Proposed Tech Specs to Plant TS Section 6.0,Administrative Controls & Sections 6.5.B.10.C & 6.14 of Util Quality Assurance Manual ML20117K6611996-07-17017 July 1996 Rev 15 to PNPS Procedure 1.2.2 Administrative OPS Requirements ML20108C0581996-05-0101 May 1996 Proposed Tech Specs Re Core Alteration to LCO & Surveillance Conditions Associated W/Secondary Containment ML20111B4201996-05-0101 May 1996 Proposed Tech Specs,Reflecting Implementation of 10CFR50 App J,Option B ML20111C2761996-05-0101 May 1996 Proposed Tech Specs 3.1.1 Re Reactor Protection Sys (Scram) instrumentation,3.2.C.1 Re Instrumentation That Initiates Rod Blocks & 3/4.4 Re Standby Liquid Control ML20108C1071996-05-0101 May 1996 Proposed Tech Specs,Relocating Administrative Controls Re QA Review & Audit Requirements of Section 6 from Plant TS to Boston Edison QA Manual ML20108A6561996-04-25025 April 1996 Proposed Tech Specs Re Part of Overall Effort to Improve Outage Performance at Plant ML20095E0771995-12-0808 December 1995 Proposed Tech Specs Bases Page B2-2,including GE11 GEXL Correlation Axial Power Profile & R-factor Ranges & Correcting Error in GE11 GEXL Correlation Mass Flux Range in GE Design ref,NEDE-31152-P, GE Fuel Bundle Designs ML20100J2521995-11-22022 November 1995 Rev 7 to Pilgrim Nuclear Power Station Odcm ML20092B5861995-09-0101 September 1995 Rev 0 to Third Ten-Yr Interval ISI Plan for Pilgrim Nuclear Power Station ML20092C4331995-09-0101 September 1995 Startup Test Rept for Pilgrim Nuclear Power Station Cycle 11 ML20092A4421995-08-31031 August 1995 Corrected Tech Spec Page Re Reactor High Pressure Trip Setting ML20086K2661995-07-14014 July 1995 Proposed Tech Specs Re Section 2.1,Bases:Safety Limits; Section 3.3.C,scram Insertion Times & Section 4.11.C, Minimum Critical Power Ratio to Reflect Use of Advanced GE-11 Fuel Design in Cycle 11 ML20078R6221995-02-15015 February 1995 Proposed Tech Specs Substituting for Pages Contained in Proposed TS Amends Submitted Prior to 950130 Authorization ML20078N4861995-02-0909 February 1995 Proposed Tech Specs,Increasing Reactor High Water Level Isolation Trip Level Setting ML20077Q1181995-01-13013 January 1995 Owner'S Specification for Reactor Shroud Repair ML20077M6921995-01-0909 January 1995 Proposed Reformatted Tech Specs & Bases ML20077A8991994-11-22022 November 1994 Proposed Tech Specs Re Suppression Chamber Water Level ML20077B1861994-11-22022 November 1994 Proposed Tech Specs 3.5.F,4.5.F.1 & 3.9.B.1 & 2 Re EDG Allowed out-of-svc Time ML20078K7961994-11-22022 November 1994 Proposed Tech Specs Re Changes to MSIV Leakage Requirement ML20078K8151994-11-22022 November 1994 Proposed TS Pages 3/4.2-20 & 3/4.2-35 Re Tables 3.2.C-1 & 4.2.C ML20078N8421994-11-18018 November 1994 Rev 32 to Procedure 8.7.3, Secondary Containment Leak Rate Test 1999-06-16
[Table view] |
Text
{{#Wiki_filter:F LIMITINGCdNDITIONFOROPERATION SURVEILLANCE REQUIREMENTS l 3.6 ' PRIMARY SYSTEM BOUNDARY 4.6 PRIMARY SYSTEM BOUNDARY Applicability: Applicability:
l Applies to'the operating status of the Applies to the periodic examination and reactor coolant system. testing requirements for the reactor cooling system.
Objective: Objective:
To assure the integrity and safe oper- To determine the condition of the reactor ation of the reactor coolant system. coolant system and the operation of the safety devices related to it.
Specification: Specification:
1 A. Thermal and Pressurization A. Thermal and Pressurization Limitations Limitations
- 1. The average rate of reactor coolant 1. During heatups and cooldowns, the temperature change during normal following temperatures shall be heatup or cooldown shall not exceed permanently logged at least every 100*F/hr when averaged over a one- 15 minutes until the difference hour period except when the vessel between any two readings taken over temperatures are above 450*F. a 45 minute period is less than 5*F.
The shell flange to shell tempera-ture differential shall not exceed a. Reactor vessel shell adjacent 145'F. to shell flange
- b. Reactor vessel shell flange
- c. Recirculation loops A and B
- 2. The reactor vessel shall not be 2. Reactor vessel shell temperature and pressurized for hydrostatic and/or reactor coolant pressure shall be
. leakage tests, and critical core permanently logged at least every operation shall not be conducted 15 minutes whenever the shell tem-unless the reactor vessel temperature perature is below 220*F and the is above that defined by the reactor vessel is not vented.
appropriate curves on Figures 3.6.1 and 3.6.2. In the event this Test specimens of the reactor vessel 4 requirement is not met, achieve base, weld and heat affected zone stable reactor conditions with reactor metal subjected to the highest flu-vessel temperature above that defined ence of greater than 1 Mev neutrons by the appropriate curve and obtain shall be installed in the reactor an engineering evaluation to determine vessel adjacent to the vessel wall the appropriate course of action at the core midplane level. The to take. specimens and sample program shall conform to the requirements of ASTM E 185-66. Selected h$h p
o PM 3
Amendment No. 123
LIMITING CON ITION FOR OPERATION SURVEfLLANCE REQUIREMENTS 3.6.A Thermal and Pressurization 4.6.A Thermal and Pressurization Limitations (Cont'd) Limitations (Cont'd) neutron flux specimens shall be
. removed at the frequency required by Table 4.6.2 at.d tested to experimentally verify adjustments to Figures 3.6.1 and 3.6.2 for predicted NDTT irradiation shifts.
- 3. The reactor vessel head bolting 3. When t'Te reactor vessel head bolt-studs shall not be under tension ing studs are tensioned and the unless the temperature of the reactor is in a Cold Condition, vessel head flange and the head the reactor vessel shell l 1s greater than 55*F. temperature immediately below the head flange shall be permanently recorded.
- 4. The pump in an idle recirculation 4. Prior to and during startup of an loop shall not be started unless idle recirculation loop, the tem-the temperatures of the coolant perature of the reactor coolant within the idle and operating re- in the operating and idle loops circulation loops are within 50*F shall be permanently logged.
of each other.
- 5. The reactor recirculation pumps 5. Prior to starting a recirculation shall not be started unless the pump, the reactor coolant temper-coolant temperatures between the atures in the dome and in the dome and the bottom head drain bottom head drain shall be
- are within 145*F. compared and permanently logged.
- 6. Thermal-Hydraulic Stability Core thermal power shall not exceed a 257. of rated thermal power without forced recirculation.
- 8. Coolant Chemistry B. Coolant Chemistry
- 1. The reactor coolant system radio- 1. a. A reactor coolant sample shall activity concentration in water be taken at least every 96 shall not exceed 20 microcuries hours and analyzed for radio-of total lodine per ml of water. activity content.
- b. Isotopic analysis of a reactor coolant sample shall be made at least once per month.
- 2. The reactor coolant water shall 2. During startups and at steaming not exceed the following limits rates less than 100,000 pounds per with steaming rates less than hour, a sample of reactor coo 1 ant 100,000 pounds per hour, except shall be taken every four hours l as specified in 3.6.8.3: and analyzed for chlorine content.
Conductivity .. 2 pmho/cm Chloride ion .. 0.1 ppm Amendment No. 124 1
)
t-
.e, , ,
t 1 .t f
I.
' TABLE 4.6.2 REACTOR VESSEL MATERIAL SURVEILLANCE PROGRAM HITHDRAWAL SCHEDULE Effective Full Fluence 2
RT,, o r Capsule Power Years (n/cm ) (weld metal)
-Number (EFPY) (1/4 T) (*F)
L g
1 4.17- 1.8 x 10 55
- 2. 15 6.3 x 10 91
. (approx.) (approx.)
. - 3 End of. Life 1.4 x 10 136 (approx.)
E, W 3 ff g 4
.,e ,
f ' t ,'
'~ .."
s
. Amendment No.. 124A J
n, ,,-..m-vr..-wne.. - - - n.,, .- ,-,,,---.ww, , , . , _,.4g,e-,,, n-- -,,n-,,,---- ,en,----g._,.-,-m,,-
FIGURE 3. 6.1 PILGRIM REACTOR VESSEL PRESSURE- TEMPERATURE LIMITS HYDROSTATIC AND LEAK TESTS 4 : l.
fli l } ..
l 'llo 4,n_.l I f ! iI, I
[ -.l..- -
7.l_
. ., . y e
.t
.g ,Jr j j
.t a.
- a. ,
a
.p.
. 4 ;.
t
.t. .. _ . ,
._l_T.L__
i, .3 , , . q.. ,. ,
7,. . . . . .
. . ,r . - , . .
r 44 t 4 t . } 4 9ji.I tt 8 ! ...
. f
-), .ff} j
.3 . -_.
1200 i
f t. t .
.9 .. ,e. -_-
.. A
. . + . .i. i , .
e 4 J .! . .l, .. l .; . . .,, i. .+ .. p _
.: .__ . _.. . , q . 4
- t. o
._..t _. ....q-..... . ,
9, qy 4#
-k-t- '
pepw o. O'$M g.t*'+ '
.; J- -+ 4 l ltf i+--t
*;+
f
'It ft 4* ++
~ ~ ',";~ '
, .p. :- +-
i
-t .
. I) T'", t t t I!
I '
*~l-I y Y p% t* +
. t
*t, l - j f
4 -++
.L {.g
--.' _.4-.y.. .._..4j
__..._..f. .
..i'*. . _ ' . . + _ _i,__
~
g 1000 __._g. . . _ . . - . , ._ .._ -... ._
,7 f ;
! , .-, j
, , &. . . } . . ._., ,. ... . .. . _ -
.g. . . - . ., .. . . L.j_. . . . .,[
i .., . 1 e, 7.
m ._4 _,9.;.4... +.ar. -4.,
. 7 .h ..' ...(
. . - .. -4 . +4
. - - - - . . . _.7.- .. 47 . p ,
to--
g, ..' tt ;. - 4 f - l>l. t' t -f rfr ' + i +i
.-_ . . - . , .% . .pp- __
',' .'8 **
' + -*
. +t
- o. .
* . w .9.,,., t. .
9e.
. i.
l , ,, . . .
.} . , tp . -t -. ,
.i .,
.r)..-}a. .-pw_
i.4 .._._.).u.,
i ;
If i.. . -; L q.. . ,t e+.6 6 ; . i . - .- t * . 1 e , (__
800 . -, a' .' . . [ . <
/ i ' '* ' ' ** i* * **-t,*t -
4-, . 1. .
.t p .:. ,j..
I.
f , ,
i
. i...- j -,..;
...r .s. . . ,
lr.i
. j .6 . .. ,. {
.} i ...
& , r. j
. _r .. . . . . .
4, .. , , . : . : , , ,;
w l
,i
..{
i,. ..
l .
.. .i
....,...J.
a: .u 1l1 :: ; I, . - . . . _
w ._
3 600 *, . it:
.t.; . ..
..l. ,
n __..!.. j u!.nl m .>.
ei
, ,,. 4.
m 3.
.t
.. . i .. t , - , .. ,.. ,-. .
.{ .. t . , 6 , i .i. _t . . j. .#.
..... t-.. . t ,i. ..l.t.
_ -,4 ...
i a..
, w .a
.;. ; l .
a ,. r.
i RPV WALL a.____.
._a l a:
a p l.1.. .
- 7. t ,
i.
m.EFPY t .
l 9-,;.+. r.g; 6.A..
.e .
. .v
~ .-
FLUENCE (4- T) --t, r , v' ....; . q . +. . .+.
l
. ,. , . l .t. 2-N i 400 p. , .
~
.. p 6.68 Af 2.'8 x 1017 n/cm j
- _p a.. F
'_. ., .g i
q4. . . i.
8.0 '3.4 x 10g n/cm2 -v -
; L. ..
i
- a. ._
; , J-,
.i i i
. .j . .
-}
, I .
,;i .. , . ,
ji , ti. . . . - -
10.0 4.4 x 10 n/cm2 +4 -
17 -
..... 12.0 4 _
>.5....
4 ... . . ,. .
17 5.1 x 10 n/cm 2-. r-
. . t iMt t . . i !t +'
200 17 2 4'+
l
...,.],,,.
L,,};,, , .
I,
,, 14.3 6.1 x 10 n/cm . , , , y_
i; TIl i, '!
[ N *PflPS EFFECTIVE FUI.L POWER ~'D l *
- e * ,, '
....r ., t
--: _i YEARS (EFPY) AS Of 12/83
. . .f ,
'H m.i.i,.-, 2Jt. . <,i.
...i
.t
'4-EllD OF CYCLE 6. .
-..~.t
+ -
I *lil,l ! !6 lh l 6
' 4 , .-l l l f f
** .i*
O } f l
40 80 120 16 0 200 240 TE MPER ATURE (*F)
AMENDMENT N O. 12 8
FIGURE 3. 6.2 PILGRIM REACTOR VESSEL PRESSURE- TEMPERATURE LIMITS SUBCRITICAL/ CRITICAL HEAT UP S CbOL DOWN I
i l
+.-. RPV WALL .,
..g .g~ ~4~ ..t _ __ .
- 1 E FPY
. 7+
FLUENCE (4I)
T
^
"i , " . . ~ . ' ~ . . _
~
l _ J,
. . ; t
.(
..L
_~_ g* i_.,_.. A_43
'l l
-t 1L , 6.68 *
-- 17 2 'l 't *
F --+ -
2.8 x 10 n/cm ': ' t -
> I- -
12OO a.o 3.4 x 10 U nfc,nj N N{' N'
'- ~ ~*i ' - /~ 2 4.4 x 10 n/cm' e.ijr~,. - '
12.0 5.1 x 10 n/cm 2 I7 .1p gr_ .
t y m, e /p- A 14.3 6.1 x 10 n/cm 2 I7 ]{, ,I .' JI .
e9 V k,9 O' o gy
-t a , y
-OIOOO *PflPS FFECTIVE t FULL POWER t
. -,}., g, , ~ .l A-.g . ._
~
p s ..
p V
YEARS (EFPY) A5 0F 12/83
- ,. " 7. g. O o . . ._.-
u) Efl0 0F CYCLE 6. -
t -*--
p -t g _-,. ,
. , p. ._
, , _ - . . 2- . & g.. . ._
-.-_ . t. ..., , ,_.
- v. p . . . . _ _ . _
* -....-4 p
.. ] . . . . ._ .
.t 4 .i . .. .-...._i.._..
__...g _ _ _. . __ ; . _2. ._
4_ p 4.. . . ..__.7
_.-.9._.
p .. _ -
q .. 4 4. { ;. . .
.._..__.a_
. . p. g. ._. . . ,.
i 800 . 4, . _ t. __
_4 4_t .
9 ,
,/.
i
.. t _ _W.l..:.. 5_ _ _ ;_1.4 .p,-._ ._e._
4.a. ._4 4_1..4..
_ .. _ -. . 4 _.. . . /:
i -..... _. . . .
. . 1. --, . 4 - 7. . . a g L p . . _. .
..f . .; . .
_. ._4.. .. 4- . . _ . _
_ . _ _ . . l .. . . . . j . ..4- 9-
...... ~.
.,.: ._.. ._. J. . i -9+ .
tI lt 4 . - ,
+-*~- i W .
f 46 P. + . 4 *I
, . 1' i
..tL. + .. , - - + -..+
4 .
, . 1 ,.1 . t .., . + .t . - .'..t .. .. .. .. .. _- .-
a::
. t 9. . ., . . , .
. .a .
4 1 a. . . :- .u
~q.-.. t _. _.9. _.1. . a . m. .
l D 600 ' .. _ _ . - ,
m p< ._. ..
ww-i SUBCRITICAL% 1...+n. .e.
1 ... . .--.. ... _ _.
y> , - ..
g ....-r .... ...
W li.fM ! ;p 5._..-q HEAT UP Br COOL:R <
- 9. . i N!t.s _
[ ....i.u DOWN __t p. a-.
= u.
_..- p .. ......i.. .m... .$. 1 CRITICAL
+...
. t .. i: . .. u , ; 9 . ,+ ,.. . ,. , y
.m CORE -
. . ,;- i. .
.plr.+. .. . .-. . ;i- 3 -
l l . ... ._,7..j ., _.y .
j ;,
. -4i. t--+t b --
~- *-+-
+"4 OPERATION
'-4 * ~~~~
,7-}.1 ) r' 'r . i l 6 44 ; i g '-*l -*.
., 4 , y. . . . _ .
' + _ , + - --- -.~'-*.+*.~*.t.*.J -. .
.t{++-.-
,{.....,+pq ..
-t- ~ .-
f -t- ' * - - * *
-*-+-t-+-
l 4 sw* .4 9 ..g r. .- -
- . + + ,_
...{-. ..t-+ .7 7 , 4 . j........-
l . . . . g t- *,
.1. , t ,..,! t
.f .p....
.g.49..
.p. ,
.., ~16 ,- f 4 . f . f,.... . - . . . . -
. s. .l. . L -{ L. , 4 - -..,L. . .
. .y & y; y. . . - , .
qf 9,
e-... y ,.
200 .g , . ,, ;; - - .
- a. u. , 4 .,. . ....g, < 1
.Li .I ,, . f t.i
.m. . . . . .t. -_ ,_ _. e,, 4_1._,._ ,. , . ....
..- ,. , ..; 1 ,
-.... 4..-
... , . , .. . . . . 4. . ... .. . ,. .. ;,,
.; s j . .. n.. 6. t *-+
t+ * *
., , i,. , ... tg 4_. J. t, ,. . .. ..
.t . .e., _. ,
p....l1 ,
l ,p .I4 J., l , j d. . .
.3 l l ,. . l ..!. 4.... ... . i O
, 6 40 80 120 16 0 200 240 TE M PER ATURE (*F)
AMENDMENT N O. 128A i
h .
. Bases:
3.6.A and 4.6.A Thermal and Pressurization Limitations (Cont'd)
The reactor coolant system is a primary barrier against the release of fission
- products-to the environs. In order to provide assurance that this barrier is maintained at a high degree of integrity, restrictions have been placed on the operating conditions to which it can be subjected.
Appendix G to 10CFR50 defines the temperature-pressurization etstrictions for hydrostatic and leak tests, pressurization, and critical operation. These e limits have been calculated for Pilgrim and are contained in Figures 3.6.1 and 3.6.2.
-For Pilgrim pressure-temperaturo restrictions, two locations in the reactor vessel are limiting. The-closure region controls at lower pressures and the beltilne controls at higher pressures.
The nil-ductility transition (NDT) temperature is defined as the temperature below which ferritic steel breaks in a brittle rather than ductile manner.
s Radle.tlon exposure from fast neutrons (>1 mev) above about 10 nyt may L shift the NOT temperature of the vessel metal above the initial value. Impact tests from the first material surveillance capsule removed from the reactor vessel have established the magnitude of the RTuor shift for the beltilne.
The shift, which is. greatest for the weld metal, is tabulated below for various
' . fluence levels and EFPY of operation:
RPV Wall EFPY Fluence (1/4T) RTuor 1,
6.68* :2.8 x 10 n/cm' 61*F
'8.0 3.4 x 10 n/cm2 68'F d
10.0 4.4 x 10 n/cm 2 76*F
'12.0 5.1 x 10 n/cm2 82*F 14.3 6.1 x 10 n/cm" 90*F
*PNPS Effective Full Power Years (EFPY) as of end of Cycle 6 (12/83) i Neutron flux wires and samples of vessel material are installed in the reactor vessel adjacent to the vessel wall at the core midplane level. The wires and samples will be periodically removed and tested to experimentally verify the values used for Figures 3.6.1 and 3.6.2. The withdrawal schedule of Table
-4.6.2 has been established as required by ICCFR50, Appendix H.
The pressure-temperature limitations of Figures 3.6.1 and 3.6.2 applicable to the beltline reflect an. Initial RTuor of O'F. This initial value is based Amendment No. 139
Bases:
3.6.A and 4.6.A Thermal and Pressurization Limitations (Cont'd) on unirradiated test data adjusted for specimen orientation in accordance with USNRC Branch Technical Position MTEB 5-2.
' The pressure-temperature limitations of Figures 3.6.1 and 3.6.2 applicable to the closure region reflect an RTuor of -5'F, also based on test data adjusted for specimen orientation. The curves apply to 100% bolt preload condition, but are conservative for lesser bolt preload conditions.
, For critical core operation when the water level is within the normal range for power operation and the pressure is less than 20% of the preservice system hydrostatic test pressure (313 psi), the minimum permissible temperature of
< the highly stressed regions of the closure flange is RTuor + 60 - 55'F.
The closure region is more limiting than the feedwater nozzle with regards to a both stress intensity and RTuor. Therefore the pressure-temperature limits of the closure are controlling.
s i
i-f i
139A Amendment,,No.
L}}