Text

,

-n i

LOUISIANA P OW E R & Li G H T/Waterford 3 SES/P.O. Box B/Killona, LA 70066

$iu NbsSIU July 19, 1984 W3K84-1658 Q-3-A35.07.108 Mr. John T. Collins Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000

]@$Nh Arlington, Texas 76012 l

{

}

d

REFERENCE:

LP&L Letter W3K84-1504 dated June 29, 1984

\\

R 2 4W !!

\\

h b,0

.uL o

Dear Mr. Collins:

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 108

" Potential Failure To Comply With FSAR Safe Shutdown Commitment" Second Interim Report The above referenced letter indicated submittal of the Final Report to the USNRC on July 20, 1984.

At the present time, Reactor Coolant System (RCS) pressure indication cabling has been rerouted from its containment penetration to LCP-43 independent of the cable vault, thereby ensuring its availability in the event of a cable vault fire.

The additional corrective action and testing stated in the First Interim Report is scheduled to be completed in late July 1984.

The Final Report will be provided to the USNRC on August 10, 1984.

Very truly yours, W

w%

T. F. Cerrets Corporate Quality Assurance Manager TFG:CNH:SSTG cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.

20555 8408060032 840719

g. } } y} 0 PDR ADOCK 05000382 S

PDR i

l e

. =

l Mr. John T. Collins July 19, 1984 W3K84-1658 Page 2 cc: Director Office of Management Information and Program Control U. S.-Nuclear Regulatory Commission Washington, D.C.

20555 Mr. E. L. Blake Shaw, Pittman, Potts & Trowbridge 1800 M Street, N.W.

Washington, D.C.

20036 Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 Mr. W. A. Cross 7910 Woodmont Avenue Suite 1200 Bethesda, Maryland 20814 9