Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20095E269 + (13:42:14, 13 December 2024)
- ML20095E266 + (13:42:15, 13 December 2024)
- ML20095E259 + (13:42:16, 13 December 2024)
- ML20095E245 + (13:42:17, 13 December 2024)
- ML20095E243 + (13:42:18, 13 December 2024)
- ML20095E239 + (13:42:18, 13 December 2024)
- NRC-92-0036, Forwards Details of Revised & Enchanced EDG Lubricating Oil Monitoring Program at Plant.Program Being Revised to Provide Early Detection of Engine Bearing Trouble & Cost Effectiveness + (13:42:19, 13 December 2024)
- ML20095E234 + (13:42:20, 13 December 2024)
- NRC-92-0031, Responds to NRC Re Violations Noted in Insp Rept 50-341/92-03.Corrective Actions:Review of 10CFR26 Was Performed.Each Test to Consist of Two Breath Analyses.In Event of Positive Test,Separate Device Will Be Used + (13:42:21, 13 December 2024)
- ML20095E230 + (13:42:21, 13 December 2024)
- ML20095E229 + (13:42:22, 13 December 2024)
- 05000317/LER-1992-002-01, :on 920319,units 1 & 2 Shutdown Due to EDG Inoperability.Caused by Design Flaw.Loss of Coolant Incident & Shutdown Sequencers on Unit 1 Will Be Modified to Ensure Correct Sequencing of EDG Loads + (13:42:24, 13 December 2024)
- ML20095E225 + (13:42:26, 13 December 2024)
- ML20095E221 + (13:42:27, 13 December 2024)
- ML20095E189 + (13:42:29, 13 December 2024)
- ML20095E178 + (13:42:31, 13 December 2024)
- ML20095E184 + (13:42:31, 13 December 2024)
- ML20095E176 + (13:42:34, 13 December 2024)
- ML20095E165 + (13:42:35, 13 December 2024)
- 3F1295-16, Requests Use of Code Case N-523 to Install Temporary Mechanical Clamping Device in Section of safety-related, Class 3 Piping as Repair for through-wall Leak + (13:42:36, 13 December 2024)
- ML20095E137 + (13:42:36, 13 December 2024)
- ML20095E133 + (13:42:37, 13 December 2024)
- L-95-324, Forwards Response to Violation Noted in Insp Rept 50-335/95-16.Corrective Actions:Interviewed Personnel Involved in Event to Determine Addl Causal Factors Present at Time of PORV Assembly + (13:42:38, 13 December 2024)
- ML20095E125 + (13:42:38, 13 December 2024)
- 05000361/LER-1984-039, :on 840712,inservice Insp Test of Unit 2 & 3 Component Cooling Water Outlet Valves (HV-6500 & HV-6501) Missed.Caused by Administrative Oversight.Procedural Controls Validated + (13:42:41, 13 December 2024)
- HL-5081, Informs of Rev to Implementation Schedule Re GL 94-02, Thermal-Hydraulic Instabilities in Bwrs + (13:42:43, 13 December 2024)
- ML20095E083 + (13:42:44, 13 December 2024)
- 05000298/LER-1984-009, :on 840719,operation of APRM Flow Biased Scram & Rod Block Sys Inconsistent W/Tech Specs.Caused by Configuration Changes Not Fully Incorporated in Tech Specs. Tech Specs Revised + (13:42:46, 13 December 2024)
- ML20095E074 + (13:42:48, 13 December 2024)
- ML20095E077 + (13:42:48, 13 December 2024)
- ML20095E073 + (13:42:49, 13 December 2024)
- BECO-LTR-95-121, Forwards Revised Bases Page B2-2 to 950714 Proposed TS Change to Section 2.1 Bases,Safety Limits,Section 3.3.C, Scram Insertion Times & Section 4.11.C,MCPR,including GE11 GEXL Correlation Axial Power Profile & R-factor Ranges + (13:42:50, 13 December 2024)
- 05000387/LER-1984-035, :on 840718,turbine Control Valve Fast Closure Initiated by Low Condenser Vacuum Pressure Resulting in Reactor Trip.Caused by Actions Taken to Established Valve Lineup to Transfer Water Fuel Pool Tank + (13:42:52, 13 December 2024)
- ML20095E068 + (13:42:53, 13 December 2024)
- ML20095E066 + (13:42:54, 13 December 2024)
- ML20095E059 + (13:42:55, 13 December 2024)
- ML20095E064 + (13:42:55, 13 December 2024)
- ML20095E054 + (13:42:58, 13 December 2024)
- ULNRC-03302, Forwards Response to NRC 951023 RAI Re GL 92-08 Issues Related to Ampacity Derating + (13:42:59, 13 December 2024)
- ML20095E052 + (13:42:59, 13 December 2024)
- JPN-95-052, Withdraws Commitments Re Testing & Mod of APRM Downscale Scram Function at Plant + (13:43:00, 13 December 2024)
- ML20095E042 + (13:43:03, 13 December 2024)
- ML20095E038 + (13:43:05, 13 December 2024)
- 05000286/LER-1984-012-01, :on 840712,Westinghouse Advised of Potential Overpressure in Component Cooling Water Sys During Inleakage & Heat Load Increases Due to Tube Rupture.Relief & Vent Valves Modified to Ease Overpressure Concern + (13:43:07, 13 December 2024)
- ML20095E029 + (13:43:09, 13 December 2024)
- 05000374/LER-1984-040-01, :on 840725,during Review of Procedures, Discovered Drywell Crane Circuits Not Included in Tech Specs.Caused by Circuits Not Being Included in Tech Specs & Erroneous Investigation.Procedure Revised + (13:43:10, 13 December 2024)
- ML20095E021 + (13:43:12, 13 December 2024)
- ML20095E020 + (13:43:12, 13 December 2024)
- ML20095E009 + (13:43:13, 13 December 2024)
- ML20095E001 + (13:43:15, 13 December 2024)
- ML20095D998 + (13:43:16, 13 December 2024)