ML20095E125
| ML20095E125 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/08/1995 |
| From: | Mccoy C GEORGIA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| LCV-0538B, LCV-538B, TAC-M91238, TAC-M91239, NUDOCS 9512140201 | |
| Download: ML20095E125 (2) | |
Text
-.
.. ~ ~
Georgia Power Company
'40 t verness Center Parkway Post Othee Box 1295 Birmingham. Alabama 35201 Telephone 205 877-7122
[
Georgia Power C.K..McCoy Vce Presdent, Nuclear Vog1\\e Proicc1 the southern electrc system December 8, 1995 l
i LCV-0538B Docket Nos. 50-424 50-425 Tac Nos.
M91238 M91239 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 VOGTLE ELECTRIC GENERATING PLANT ENCAPSULATION VESSELS WITHDRAWAL OF REOUEST FOR ALTERNATE TESTING CRITERIA Gentlemen:
A December 29,1994, letter from Mr. C. K. McCoy to the NRC requested approval of alternate testing criteria for the encapsulation vessels on the containment sump recirculation piping. Since that time Georgia Power Company (GPC) has determined that these changes may be accomplished under the provisions of 10 CFR 50.59 therefore, GPC hereby withdraws the request for NRC approval of the alternate testing criteria.
Should you have any questions, please advise.
I Sincerely, l
C. K. McCoy l
j l l
9512140201 951208 i
l PDR ADOCK 05000424
.l O
_P.
_ _PDR.
i
U. S. Nuclear Regulatory Commission Page 2 CKM/JLL cc: Georgia Power Comnany Mr. J. B. Beasley, Jr.
Mr. M. Sheibani NORMS U. S. ' Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. L. L Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle 1
l i
1