ML20095E234

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Sept 1995 for Quad Cities Unit 2
ML20095E234
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 09/30/1995
From: Moore K
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20095E070 List:
References
NUDOCS 9512140265
Download: ML20095E234 (1)


Text

._.

APPENDIX C REVISED OPERATING DATA REPORT DOCKET NO.

50-154 UNIT Two 1

DATE December 8, 1995 COMPLETED BY Kristal Moore TELEPHONE (309) 654-2241 OPERATING STATUS 0000 090195

1. REPORTING PERIOD: 2400 093095 GROSS HOURS IN REPORTING PERIOD: 720
2. CURRENTLY AITTHORIZED POWER LEVEL (MWt): 2511 MAX > DEPEND > CAPACITY: 769 DESIGN ELECTRICAL RATING (MWe-NET): 789
3. POWER LEVELTO WHICH RESTRKTED (IF ANY)(MWe-Net): N/A
4. REASONS FOR RESTRICTION (IF ANY):

THl$ MONTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRTriCAL 502.00 2842.50 152618.35
6. REACTOR RESERVE SHUTDOWN HOURS 0.00 0.00 2985.80
7. HOURS GENERATOR ON LINE 498.10 2566.70 148498.35
8. UNTT RESERVE SHUTDOWN HOURS 0.00 0.00 702.90
9. GROSS THERMAL ENERGY GENERATED (MWH) 1059064.20 5197103.92 32113780&O2 9M
10. GROSS ELECIRICAL ENERGY GENERATED (MWH) 336538.00 161202a00 103125921.00
11. NET ELECTRICAL ENERGY GENERATED (MWH) 318808.00 1528435.00 97684344.00
12. REACTOR SERVICE FACTOR 67.38 43.39 74.75
13. REACTOR AVAILABILITY FACTOR 67.38 42.39 76.22
14. UNTT SERVICE FACTOR 66.86 39.18 72.74 l
15. UNTT AVAILABIIJTY FACTOR 66.86 39.18 73.08
16. UNTT CAPACTTY FACTOR (Ussag MDC) 55.65 30.34 62.22
17. UNTT CAPACTTY FACTOR (Using Design MWe) 52.24 29.57 60.64
18. UNTT FORCED OUTAGE RATE 33.14 11.21 9.95
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):

i l

20. IF SHUTDOWN AT END OF REPORT PERIOD < ESTIMATED DATE OF STARTUP:
21. UNTTS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INTTIAL CRTTICALITY INTTIAL EIECTRICTTY COMMERCIAL OPERATION 9512140265 951208 PDR ADOCM 05000254 R

PDR