APPENDIX C REVISED OPERATING DATA REPORT DOCKET NO.
50-154 UNIT Two 1
DATE December 8, 1995 COMPLETED BY Kristal Moore TELEPHONE (309) 654-2241 OPERATING STATUS 0000 090195
- 1. REPORTING PERIOD: 2400 093095 GROSS HOURS IN REPORTING PERIOD: 720
- 2. CURRENTLY AITTHORIZED POWER LEVEL (MWt): 2511 MAX > DEPEND > CAPACITY: 769 DESIGN ELECTRICAL RATING (MWe-NET): 789
- 3. POWER LEVELTO WHICH RESTRKTED (IF ANY)(MWe-Net): N/A
- 4. REASONS FOR RESTRICTION (IF ANY):
THl$ MONTH YR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTOR WAS CRTriCAL 502.00 2842.50 152618.35
- 6. REACTOR RESERVE SHUTDOWN HOURS 0.00 0.00 2985.80
- 7. HOURS GENERATOR ON LINE 498.10 2566.70 148498.35
- 8. UNTT RESERVE SHUTDOWN HOURS 0.00 0.00 702.90
- 9. GROSS THERMAL ENERGY GENERATED (MWH) 1059064.20 5197103.92 32113780&O2 9M
- 10. GROSS ELECIRICAL ENERGY GENERATED (MWH) 336538.00 161202a00 103125921.00
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 318808.00 1528435.00 97684344.00
- 12. REACTOR SERVICE FACTOR 67.38 43.39 74.75
- 13. REACTOR AVAILABILITY FACTOR 67.38 42.39 76.22
- 14. UNTT SERVICE FACTOR 66.86 39.18 72.74 l
- 15. UNTT AVAILABIIJTY FACTOR 66.86 39.18 73.08
- 16. UNTT CAPACTTY FACTOR (Ussag MDC) 55.65 30.34 62.22
- 17. UNTT CAPACTTY FACTOR (Using Design MWe) 52.24 29.57 60.64
- 18. UNTT FORCED OUTAGE RATE 33.14 11.21 9.95
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
i l
- 20. IF SHUTDOWN AT END OF REPORT PERIOD < ESTIMATED DATE OF STARTUP:
- 21. UNTTS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INTTIAL CRTTICALITY INTTIAL EIECTRICTTY COMMERCIAL OPERATION 9512140265 951208 PDR ADOCM 05000254 R