Mod to 920129 Application for Amends to Licenses DPR-24 & DPR-27,consisting of TS Change Request 150 Re Quarterly Testing of Reactor Protection & Safeguards Circuits
ML20095E068
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/16/1992
From: Zach J
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20095E069 List:
References
CON-NRC-92-043, CON-NRC-92-43 VPNPD-92-154, NUDOCS 9204270278
Download: ML20095E068 (2)


Text

,, - .. _ -. _ . _. . .-

i Wisconsin

\

\ lih?CtHC POWER COMPANY 231 W M N; RCD h 20s wwuee W $3M 14'4 R '2345 VPHPD-92-154 10 CFR 50.59 NRC-92-043 10 CFR 50.90 April 16, 1992 U.S. NUCLEAR REGULATORY COMMISSION Document Control Desk Mail Station P1-337 Washington, D.C. 20555 Gentlemen:

DOCKETS 50-266 AND 50-301 MODIFICATION TO TEQ' N'EC CHANGE REOUEST 152 DUARTERLY TESTING Cd JACTOR PROTECTION AND SAFEGUARDS CIRCUITS EOJNT BEACH NUCLEAR PLANT, UNITS 1 AND .?

By letter dated January 29, 1992, we submitted Technical Specification Change Request 150, " Quarterly Testing of Reactor Protection and Safeguards Circuits." This request proposed changes to Facility Operating Licenses DPR-24 and DPR-27 for Point Beach Nuclear Plant, Units 1 and 2, respectively, to allow quarterly testing of reactor protection and safeguards circuits vice monthly as presently required. Other cuanges were propoued, as necessary, to support the change in the testing interval.

As part of our proposed changes, we deleted a portion of the note ,

delineated with a double asterisk (**) at the bottom of Technical Specification Table 15.4.1-1, " Minimum Frequencies for Checks, Calibrations and Test of Instrument Channels," Page 1 of 4. The note presently reads, "Not required during periods of refueling shutdown but must be performed prior to scarting up if it has not been performed during the previous surveillance period. Tests of permicsive and 7w power trip bistable setpoints which cannot be done during power operations shall be conducted prior to startup if not done in the previous two weeks." In-our= Change Request, we deleted the second sentence of this note concerning the permissives and low power trip bistables. Our amendment request

_ proposes adding the permissive testing requirements as a separate item, Item 44, to Table 15.4.1-1. Therefore, with the addition of Item 44 to the table, the portion of the note concerning permissive testing is no longer necessary.

The low power trip bistables cannot be tested at power.

Therefore, the portion of the note concerning the low power bistable testing should not have been eliminated. The note ensures that the low power trip is tested prior to entering a low power operating condition during start-up if it was not tested l during the previous surveillance interval. The note presently /

l requires testing if a test was not performed during the previous p//

9204270278 920416 ,

_ _ _ _ _ _ 1 -

. NRC Document Control-Desk April 16, 1992

-Pagg 2 two weeks. This two-week interval corresponds to the biweekly test frequency specified in the original Point Beach Nuclear Plant Technical Specifications. We, therefore, request that the note be changed to read, "Not required during periods of refueling shutdown but must be performed prior to starting up if it has not been performed during the previous surveillance period. Tests of the low power bistable setpoint which cannot be done during power operation shall be conducted prior to starting up if not performed in the previous surveillance-interval."

We have reviewed the safety evaluation enclosed alth our January 29, 1992, submittal. That evaluation demonstrates the adequacy of the quarterly test interval for reactor protection and safeguards instrumentation at Point Beach Nuclear Plant. .The evaluation adequately covers the proposed changes to this note.

This proposed rewarding of the note is administrative in nature and is necessary to cupport the requested change to quarterly test intervals for .. actor protection and safeguards circuits.

Therefore, the conclusions reached in the "No Significant Hazards Determination" enclosed with our January 29, 1992, submittal are not altered. Operation of Point Beach Nuclear Plant in accordance with the proposed nmendments does not result in a significant hazard.

A complete copy of the Technical Specification pages with the changes preposed in this letter and our January 29, 1992, submittal are attached.

If you have any questions, please contact us.

Sincerely, )

l e" W wa - u{_'

Jam p J. Zach Vice President Nuclear Power Attachments Copies to NRC Regional Administrator, Region III

-NRC Resident Inspector L. L. Smith, PSCW Subscribed and sworn go before me this lhh day of ( f , 1992.

a an, ctr r2 A Notary Public, Stat'eWf Wisconsin My Commission expireo !T 9 F .