MONTHYEARML20206C0081999-04-22022 April 1999 Amends 219 & 200 to Licenses NPF-4 & NPF-7,respectively, Changing NAPS TS Casing Cooling & Outside Recirculation Spray Pumps Surveillance Testing Criteria ML20207H4381999-03-0202 March 1999 Amends 218 & 199 to Licenses NPF-4 & NPF-7,respectively, Changing NAPS TS to Provide Allowed Outage Time of 144 Days for PORV Nitrogen Accumulators ML20199C9921999-01-12012 January 1999 Corrected TS Pages to Amends 216 & 197 to Licenses NPF-4 & NPF-7,respectively.TS Bases Changes Associated with Amend Request,Inadvertently Omitted from Licensee 981016 Submittal & Being Sent as Attachment to ML20198A3441998-12-10010 December 1998 Amends 216 & 197 to Licenses NPF-4 & NPF-7,respectively, Changing NAPS TS to Revise Frequency & Voltage Requirements During Starting & steady-state Running Portions of EDG Testing ML20155H0251998-10-30030 October 1998 Amends 215 & 196 to Licenses NPF-4 & NPF-7,respectively, Addressing Changes That Modify Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Stop Valves ML20237E1821998-08-26026 August 1998 Amends 214 & 195 to Licenses NPF-4 & NPF-7,respectively, Changing NAPS TS to Allow an Extended Allowed Outage Time of 14 Days for One EDG ML20236X3741998-08-0303 August 1998 Amends 213 & 194 to Licenses NPF-4 & NPF-7,respectively, Revising Sections 3.9.7,4.9.7.1,4.9.7.2 & 3/4.9.7 for Unit 1 & Sections 3.9.7,4.9.7.1,4.9.7.2 & 3/4.9.7 for Unit 2, Allowing Movement of Sf Pit Gate Over Irradiated Fuel ML20249C1501998-06-23023 June 1998 Amends 212 & 193 to Licenses NPF-4 & NPF-7,respectively, Making Changes to TS by Revising Listed Sections & Modifying Station Mgt Titles ML20248F0391998-05-28028 May 1998 Correction to Amends 210 & 191 to Licenses NPF-4 & NPF-7. Correction Due to Administrative Oversight ML20217E6451998-04-22022 April 1998 Amends 211 & 192 to Licenses NPF-4 & NPF-7,respectively, Revising Surveillance Requirement 4.4.10.1.1,modifying Insp Requirements for RCP Pump Flywheels for Both Units & Eliminating Loop Straightener Insps ML20216G8671998-04-16016 April 1998 Amends 210 & 191 to Licenses NPF-4 & NPF-7,respectively, Revise SRs 4.7.1.7.2.a.1 & 4.7.1.7.2.a.2 for Both Units for Turbine Throttle & Govenor Valves ML20216F1151998-04-14014 April 1998 Amends 209 & 190 to Licenses NPF-4 & NPF-7,respectively, Revising Surveillance Requirement Tables 3.3-1 & 4.3-1 for Both Units Modifying Testing Requirements for Reactor Trip Bypass Breaker ML20216E0101998-04-13013 April 1998 Amends 208 & 189 to Licenses NPF-4 & NPF-7,respectively, Revising TS to Eliminate Records Retention Requirements from Sections 6.10 of TS ML20203C1621997-12-0404 December 1997 Amends 207 & 188 to Licenses NPF-4 & NPF-7,respectively, Changing TS to Revise Surveillance Requirement 4.7.1.7.2 ML20149L1761997-07-30030 July 1997 Amends 206 & 187 to Licenses NPF-4 & NPF-7,respectively, Addressing Only Proposed Changes to Intermediate Range Trip Setpoints & Allowable Values ML20149F1201997-07-17017 July 1997 Amends 205 & 186 to Licenses NPF-4 & NPF-7,respectively, Addressing Proposed Temporary (Limit by Time Duration) TS Changes for Svc Water Sys Refurbishment ML20116B2311996-07-24024 July 1996 Amends 202 & 183 to Licenses NPF-4 & NPF-7,respectively, Clarifying TS to Allow Switching of Charging & low-head Safety Injection Pumps During Unit Shutdown Conditions ML20117K4031996-06-0505 June 1996 Amends 201 & 182 to Licenses NPF-4 & NPF-7,respectively, Modifying TSs to Increase Min Allowable RCS Total Flow Rate from 284,000 Gpm & 275,000 Gpm to 295,000 Gpm ML20101L6811996-04-0101 April 1996 Amends 200 & 181 to Licenses NPF-4 & NPF-7,respectively, Revising TS to Increase Pressurizer Safety Valve Lift Setpoint Tolerance & Reduce Pressurizer High Pressure Reactor Trip Setpoint & Allowable Value ML20101B3751996-03-0606 March 1996 Amends 199 & 180 to Licenses NPF-4 & NPF-7,respectively, Revising TS Re Neutron Flux High Trip Setpoints W/Inoperable MSSVs ML20100K9951996-02-27027 February 1996 Amends 198 & 179 to Licenses NPF-4 & NPF-7,respectively, Revising TS 3.9.4 to Allow Both Containment Pal Doors to Remain Open During Fuel Movements or Core Alterations Provided That One Door Operable ML20097F3411996-02-0909 February 1996 Amends 196 & 177 to Licenses NPF-4 & NPF-196,respectively, Revising TS Re Use of performance-based Containment Leakage Rate Testing ML20097D2231996-02-0808 February 1996 Amends 195 & 176 to Licenses NPF-4 & NPF-7 Increasing Surevillance Test Interval for Turbine Reheat Stop & Intercept Valves from Once Per 31 Days to Once Per 18 Months & Extending Insp Interval of Turbine Stop ML20093H5911995-10-11011 October 1995 Amends 194 & 175 to Licenses NPF-4 & NPF-7,respectively, Allowing One of Two Svc Water Loops to Be Isolated from Component Cooling Water Head Exchangers During Power Operations in Order to Refurbish Isolated Svc Water Headers ML20083M5681995-05-15015 May 1995 Amends 193 & 174 to Licenses NPF-4 & NPF-7,respectively, Revising NA-1&2 TS 4.6.1.2.a to Permit Approved Exemptions to Containment Integrated Leak Rate Frequency Requirements ML20082U2561995-05-0202 May 1995 Amends 191 & 172 to Licenses NPF-4 & NPF-7,respectively, Revising NA-1&2 TS to Review Responsibilities of Station Nuclear Safety & Operating Committee & Mgt Safety Review Committee ML20087H8971995-05-0101 May 1995 Amends 190 & 171 to Licenses NPF-4 & NPF-7,respectively, Revising NA-1&2 TS by Deleting Requirements to Periodically Review Certain Administrative & Technical Procedures ML20072V5871994-09-0606 September 1994 Amends 188 & 169 to Licenses NPF-4 & NPF-7,respectively, Revising Na 1 & 2 TS HHSI Surveillance Requirements by Removing Explicit Numerical Values & Replacing W/Broader non-numerical Requirements ML20072J1921994-08-24024 August 1994 Amends 187 & 168 to Licenses NPF-4 & NPF-7,respectively, Revising TS by Removing Reactor Trip Sys & ESFAS Response Time from TS to station-controlled Documents ML20072A1051994-08-0909 August 1994 Amends 186 & 167 to Licenses NPF-4 & NFP-7,respectively, Revising NA-1&2 TS ML20071N6021994-07-28028 July 1994 Amends 185 & 166 to Licenses NPF-4 & NPF-7,respectively, Revising NA-1&2 TS Surveillance Frequency Reuirements for Control Rod Motion Testing from Once Per 31 Days to Once Per 92 Days ML20070J4411994-07-18018 July 1994 Amends 184 & 165 to Licenses NPF-4 & NPF-7,respectively, Modifying Requirement for Operability Testing of EDG When Alternate Safety Buses EDG Inoperable ML20070R9181994-05-16016 May 1994 Amends 182 & 163 to Licenses NPF-4 & NPF-7,respectively, Revising Surveillance Frequency of Nozzles in Quench Spray & Recirculation Spray Sys from 5 to 10 Yrs ML20070N1441994-04-22022 April 1994 Amends 181 & 162 to Licenses NPF-4 & NPF-7,respectively, Deleting Tables Listing Certain Components from TS & Relocating Lists to Plant Procedures ML20064M7001994-03-21021 March 1994 Corrected Amend 159 to License NPF-7,revising Page B 3/4 7-7 to Reflect Changes Issued by Previous License Amend ML20064C8561994-03-0101 March 1994 Amends 188,188,180 & 161 to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,respectively,deleting TS Requirement for Station Nuclear Safety Operating Committee Review of Emergency & Security Plans ML20064C2181994-03-0101 March 1994 Amends 179 & 160 to Licenses NPF-4 & NPF-7,respectively, Revising NA-1&2 TS That Allow Plant Personnel to Effect Repairs to Rod Control Sys in Orderly Manner ML20063K9721994-02-17017 February 1994 Amends 178 & 159 to Licenses NPF-4 & NPF-7,respectively, Implementing Revised 10CFR20, Stds for Protection Against Radiation ML20063F2021994-02-0707 February 1994 Amends 177 & 158 to Licenses NPF-4 & NPF-7,respectively, Modifying Surveillance Frequency of Auxiliary Feedwater Sys Pumps from Monthly to Quarterly ML20058D6371993-11-23023 November 1993 Amends 176 & 157 to Licenses NPF-4 & NPF-7,respectively, Revising TS for Surveillance Requirements Re Simulated Reactor Coolant Pump Seal Injection Flow Requirements ML20056H4481993-09-0707 September 1993 Amends 174 & 155 to Licenses NPF-4 & NPF-7,respectively, Increasing Allowable as-found Main Steam Safety Valve Setpoint Tolerance from 1% to 3% ML20056H4521993-09-0707 September 1993 Amends 173 & 154 to Licenses NPF-4 & NPF-7,respectively, Removing Schedular Requirements for Type a Tests to Be Performed Specifically at 40 Plus or Minus 10 Month Interval & Instead Ref Type a Testing Per 10CFR50,App J ML20057A3331993-09-0202 September 1993 Amends 172 & 153 to Licenses NPF-4 & NPF-7,respectively, Separating Containment Recirculation Spray Subsystems Into Two Containment Recirculation Spray Trains Consistent W/Sts ML20056E4751993-08-0404 August 1993 Amends 171 & 151 to Licenses NPF-04 & NPF-07,respectively, Revising TS Requirements Re High Head Safety Injection Flow Balance Tests by Removing Uncertainty of Flow Measurements Caused by Instrument Inaccuracies ML20035E4491993-04-12012 April 1993 Amend 150 to License NPF-7,suspending Manual ESF Functional Test of Safety Injection Input to Reactor Trip Breakers for Remainder of Facility Operating Cycle 9 ML20035B8741993-03-25025 March 1993 Amends 170 & 149 to Licenses NPF-4 & NPF-7,respectively, Revising P/T Operating Limitations During Heatup & Cooldown & Ltops Setpoints for 12 & 17 EFPYs for NA-1 & 2, Respectively ML20035B1421993-03-23023 March 1993 Correction to Amends 161 & 142 for Units 1 & 2 Due to Administrative Error on TS Page 3/4-10 Re Elimination of Resistance Temp Detectors & Substitution of Thermowells ML20126D8791992-12-0909 December 1992 Amends 169 & 148 to Licenses NPF-4 & NPF-7,respectively, Revising Current NA-1&2 TS Pertaining to Monitoring Program for Secondary Water Chemistry ML20118C1141992-10-0505 October 1992 Amends 167 & 147 to Licenses NPF-4 & NPF-7,respectively, Deleting from TS 3/4.7.12,settlement Monitoring of Most Category I Structures & Increasing Allowable Differential Settlement Limits for Certain Structures ML20118B1321992-09-21021 September 1992 Amends 166 & 146 to Licenses NPF-4 & NPF-7,respectively, Revising Wording in TS for RCS Vol in Design Features Section 1999-04-22
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20210L1501999-08-0404 August 1999 Application for Amends to Licenses NPF-4 & NPF-7,ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification Time ML20206N3601999-05-0606 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels ML20206G8271999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,deleting &/Or Relocating Addl primary-to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event ML20206G8641999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS ML20206C0081999-04-22022 April 1999 Amends 219 & 200 to Licenses NPF-4 & NPF-7,respectively, Changing NAPS TS Casing Cooling & Outside Recirculation Spray Pumps Surveillance Testing Criteria ML20207H4381999-03-0202 March 1999 Amends 218 & 199 to Licenses NPF-4 & NPF-7,respectively, Changing NAPS TS to Provide Allowed Outage Time of 144 Days for PORV Nitrogen Accumulators ML20199C9921999-01-12012 January 1999 Corrected TS Pages to Amends 216 & 197 to Licenses NPF-4 & NPF-7,respectively.TS Bases Changes Associated with Amend Request,Inadvertently Omitted from Licensee 981016 Submittal & Being Sent as Attachment to ML20198A3441998-12-10010 December 1998 Amends 216 & 197 to Licenses NPF-4 & NPF-7,respectively, Changing NAPS TS to Revise Frequency & Voltage Requirements During Starting & steady-state Running Portions of EDG Testing ML20195J4351998-11-18018 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir ML20195C9291998-11-10010 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising TSs to Clarify Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters ML20155H0251998-10-30030 October 1998 Amends 215 & 196 to Licenses NPF-4 & NPF-7,respectively, Addressing Changes That Modify Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Stop Valves ML20237E1821998-08-26026 August 1998 Amends 214 & 195 to Licenses NPF-4 & NPF-7,respectively, Changing NAPS TS to Allow an Extended Allowed Outage Time of 14 Days for One EDG ML20236X3741998-08-0303 August 1998 Amends 213 & 194 to Licenses NPF-4 & NPF-7,respectively, Revising Sections 3.9.7,4.9.7.1,4.9.7.2 & 3/4.9.7 for Unit 1 & Sections 3.9.7,4.9.7.1,4.9.7.2 & 3/4.9.7 for Unit 2, Allowing Movement of Sf Pit Gate Over Irradiated Fuel ML20236U8611998-07-28028 July 1998 Application for Amend to Licenses NPF-4 & NPF-7,revising EDG Section to Be Consistent W/Station Procedures Associated W/ Steady State Conditions & W Nuclear Safety Advisory Ltr,Nsal 93-022 ML20236U8261998-07-28028 July 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps ML20236U8571998-07-28028 July 1998 Application for Amend to Licenses NPF-04 & NPF-07,revising TS 3/4.1.2 Re RWST & Boron Concentration Ph Range Bases Change ML20249C1501998-06-23023 June 1998 Amends 212 & 193 to Licenses NPF-4 & NPF-7,respectively, Making Changes to TS by Revising Listed Sections & Modifying Station Mgt Titles ML20248F0391998-05-28028 May 1998 Correction to Amends 210 & 191 to Licenses NPF-4 & NPF-7. Correction Due to Administrative Oversight ML20217E6451998-04-22022 April 1998 Amends 211 & 192 to Licenses NPF-4 & NPF-7,respectively, Revising Surveillance Requirement 4.4.10.1.1,modifying Insp Requirements for RCP Pump Flywheels for Both Units & Eliminating Loop Straightener Insps ML20216G8671998-04-16016 April 1998 Amends 210 & 191 to Licenses NPF-4 & NPF-7,respectively, Revise SRs 4.7.1.7.2.a.1 & 4.7.1.7.2.a.2 for Both Units for Turbine Throttle & Govenor Valves ML20216F1151998-04-14014 April 1998 Amends 209 & 190 to Licenses NPF-4 & NPF-7,respectively, Revising Surveillance Requirement Tables 3.3-1 & 4.3-1 for Both Units Modifying Testing Requirements for Reactor Trip Bypass Breaker ML20216E0101998-04-13013 April 1998 Amends 208 & 189 to Licenses NPF-4 & NPF-7,respectively, Revising TS to Eliminate Records Retention Requirements from Sections 6.10 of TS ML20217E8931998-03-25025 March 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Frequency of EDGs & Establishing Configuration Risk Mgt Program to Support Risk Informed Tech Specs ML18153A2891998-03-25025 March 1998 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,revising Station Mgt Titles to Reflect New Positions Approved by Vepc Power Board of Directors on 980220 ML20202C3281998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Testing Requirements for Reactor Trip Bypass Breaker ML20202C5621998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Requirements & Frequency for RCP Flywheels & Eliminating Insp Requirements for Unit 1,reactor Coolant Flow Straighteners ML20203C1621997-12-0404 December 1997 Amends 207 & 188 to Licenses NPF-4 & NPF-7,respectively, Changing TS to Revise Surveillance Requirement 4.7.1.7.2 ML20199H3661997-11-18018 November 1997 Application for Amends to Licenses NPF-4 & NPF-7,permitting Quarterly Testing of Turbine Governor & Throttle Valves. Non-proprietary Tr,Rev 1 to WCAP-14733 & Proprietary Tr,Rev 1 to WCAP-14732,encl.Proprietary Rept Withheld ML20199A1411997-11-0505 November 1997 Application for Amends to Licenses NPF-4 & NPF-7, Respectively.Amends Will Provide Administrative Controls in TS 3/4.9.7,to Permit Spent Fuel Pit Gate Movement Over Irradiated Fuel ML20149L1761997-07-30030 July 1997 Amends 206 & 187 to Licenses NPF-4 & NPF-7,respectively, Addressing Only Proposed Changes to Intermediate Range Trip Setpoints & Allowable Values ML20149F1201997-07-17017 July 1997 Amends 205 & 186 to Licenses NPF-4 & NPF-7,respectively, Addressing Proposed Temporary (Limit by Time Duration) TS Changes for Svc Water Sys Refurbishment ML20141F3691997-05-14014 May 1997 Application for Amends to Licenses NPF-4 & NPF-7,revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided in TS 3/4.7.1.7 ML20132E6091996-12-17017 December 1996 Application for Amends to Licenses NPF-4 & NPF-7,requesting Temporary Changes to Service Water Sys Piping Repair and Refurbishment ML18153A6331996-11-26026 November 1996 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,respectively,eliminating Records Retention Requirements Section of Ts,Per GL 95-06 & Adminstrative Ltr 95-06 ML20134H0001996-11-0606 November 1996 Application for Amends to Licenses NPF-4 & NPF-7,modifying Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Stop Valves ML20116B2311996-07-24024 July 1996 Amends 202 & 183 to Licenses NPF-4 & NPF-7,respectively, Clarifying TS to Allow Switching of Charging & low-head Safety Injection Pumps During Unit Shutdown Conditions ML20117K4031996-06-0505 June 1996 Amends 201 & 182 to Licenses NPF-4 & NPF-7,respectively, Modifying TSs to Increase Min Allowable RCS Total Flow Rate from 284,000 Gpm & 275,000 Gpm to 295,000 Gpm ML20107L3881996-04-25025 April 1996 Application for Amends to Licenses NPF-4 & NPF-7,providing Suppl Info That Clarifies TS to Allow Switching of Charging & low-head SI Pumps During Unit Shutdown Conditions ML20101L6811996-04-0101 April 1996 Amends 200 & 181 to Licenses NPF-4 & NPF-7,respectively, Revising TS to Increase Pressurizer Safety Valve Lift Setpoint Tolerance & Reduce Pressurizer High Pressure Reactor Trip Setpoint & Allowable Value ML20101F7891996-03-21021 March 1996 Application for Amends to Licenses NPF-4 & NPF-7,clarifying Requirements for Testing Charcoal Adsorbent in Waste Gas Charcoal Filter Sys,Cr Emergency Habitability Sys & Safeguard Area Ventilation Sys ML20101B3751996-03-0606 March 1996 Amends 199 & 180 to Licenses NPF-4 & NPF-7,respectively, Revising TS Re Neutron Flux High Trip Setpoints W/Inoperable MSSVs ML20100K9951996-02-27027 February 1996 Amends 198 & 179 to Licenses NPF-4 & NPF-7,respectively, Revising TS 3.9.4 to Allow Both Containment Pal Doors to Remain Open During Fuel Movements or Core Alterations Provided That One Door Operable ML20097F3411996-02-0909 February 1996 Amends 196 & 177 to Licenses NPF-4 & NPF-196,respectively, Revising TS Re Use of performance-based Containment Leakage Rate Testing ML20097D2231996-02-0808 February 1996 Amends 195 & 176 to Licenses NPF-4 & NPF-7 Increasing Surevillance Test Interval for Turbine Reheat Stop & Intercept Valves from Once Per 31 Days to Once Per 18 Months & Extending Insp Interval of Turbine Stop ML20097C0001996-01-31031 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Revising Current Minimum EDG Fuel Oil Day Tank Vol & Allowing Credit to Be Taken for Surveillance Testing Performed During Power to Satisfy SR Required in Shutdown ML20097J4281996-01-30030 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Modifying Table 3.2.-1 TS 3.2.5 to Increase Minimum Allowable RCS Total Flow Rate from 284,000 Gpm & 275,000 Gpm to 295,000 Gpm ML20096G9811996-01-23023 January 1996 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Lrt ML20094N7881995-11-20020 November 1995 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Leakage Rate Testing ML20094D0131995-10-25025 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Inoperability ML20093K5851995-10-17017 October 1995 Application for Amend to License NPF-7,modifying Table 4.4-1 of TS 4.4.5.1 to Reduce from Two to One Min Number of SGs Required to Be Inspected During First ISI Following SG Replacement 1999-08-04
[Table view] |
Text
._
)
pm u:4, 0,,
UNITED $TATES
[
.m g
NUCLE AR REGULATORY COMMISSION p
W A$HINGToN, D C. 20S56
/'
QGINTAELECTRICANDPOWERCOMPANY OLD 00 MIN 10N ELECTRIC COOPERATIVE DOCKET NO. 50-338 NORTH ANNA POWER STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 155 License No. NPf-4 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Virginia Electric and Power Company et al., (the licensee) dated June 26, 1990, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chr.pter 1; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and l
E.
The issuance of this amendment is in accordance with 10 CFR Part l
51 of tne Comission's regulations and all applicatie requirements I
have been satisfied.
l l
l 9204270326 920421 PDR ADOCK 05000338 P
PDR
, 2.
Accordingly, the license is amended by changes to the Technical Speci-fications as indicated in the attachment to this license amendment, and paragraph 2.0.(2) of facility Operating License No. NPf-4 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through /tendment Nc.155, are hereby incorperated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of issuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION A
b L
H rbert N. Berkow, Director Project Directorate 11 2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of issuance: April 21, 1992
ATTACHMENT TO LICENSE AMF40 MENT NO.155 TO FACILITY OPERATING LICENSE NO. NPF.4 DOCKET No. 50-338 fstations Replace the following pages of the Appendix "A" Technical Sptct The revised pages are icertified by with the enclosed pages as indicated.
amendment number and contain vertical lires indicating the area of change.
The corresponding overleaf pages are also provided to ar,aintain docurr.ent Cofr.pl e te r,9ss.
8-6 3/4 B 6a (new)
+
..v,,.
-s--,-....
.,,,.m-.v.-
e
,*,.y-
,---e-.
--c.,-wy is,
,e y -- - < - " -
ri scTRicAL POWEA SYSTEUR SHt/IDOWN anem m m m a 3.8.1.2 As a minimum, the fofhwing A.C. elecincal pcwor sources shall be CPERABLE:
a.
One circuit between the orfsate transrnssion network and the onsste Class 6e distnbuton system.
and b.
One diesel generator with:
1.
A day tank containing a trinimum vobme of 750 gafbns of fuel.
2.
A fuel storage system consisting of two underground storage tanks each conta2ning a minimum volume of 45.000 gallons of fuel (This is a shared system with Unit 2), and 3.
A fuel transfer system.
l APPUC A BfLITY:
MODES $ and 8.
ACT10N:
a.
With less than the above marrum required A C. electreal power sources CPERABLE. suspend all l.
operatons involving CORE ALTERAT4CNS or positive teactrvety changes until the mancnum required A C.
electreal power sources are restored to OPERABLE siatus.
h.
With one underground fuel oli storage tank of 3.8.1.2.b.2 Inoperable for the performance of Survalliance Requirement 4.8.1.1.4 or for tank repalts:
1.
Verify 45.000 gallons of fuel is available in the operable underground fuel oil storage tank at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, 2.
Verify a mlnlmum of 100,000 Callone of fuel oil is maintained in the above ground main fuel oil storage tank at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, 3.
Verify an avall6ble source of fuel oil and transportation to supply 50.000 gallons of fuel in less than a at hour period, and 4.
Restore the niorage tank to OPERABLE status within 7 days or place both Units in at least HOT STAND 8Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, and perform ACTION a, above.
99.0 AGWn EEORS 4 8.1.2 The above required A.C. electncal power sources shas be demonstrated OPERABLE by the perfo:mance of each of the Survestance Requirements of 4.8.1.1.1, 4.8.1.1.2, 4.6.1.1.3 and 4.8.1.1.4.
Amendment No. 17 $3, I28e NORTH ANNA, UNIT 1 3/4 8 5 m.
.,-,---,,,-.m
_,,,-r,,,_-.w-,,
,y,,
,,m_,r,,,..
w,,-
,,.,,.m...
m
,m.,ywy a,,.., -, _...,
4 ELECTRIC AL POWER SYSTEMS 14 8 2 ONSITE POWER DISTR!BUTION SYSTEV.S A C DISTRIBUTION OPERATING UMITING CC#JDmCN FOR OPERATION __
3 8 21 The totbwing A C electncal busses shall be OPERABLE and energized w.th tie breakers open between reduno&nt busses j
i a
H A C. En.ergency Busses consisting of.
- 1. 4160 von Gnvrgency Bus # 1H 2,480 von Emergency Busses # 1H,1H1 b.
J A C. Emergency Busses consisting of.
- 1. 4160 von Emergency Bus a iJ
- 2. 480 volt Emergency Bust.es # 1J.1J1 c.
120 veh A C Vital Bus # i 1 energized from its associated inverter connected to D C. Bus # 1#
d.
120 volt A C Vital Bus # 111 energzed from its assocated invener connected to D C Bus # 11l*
e.
120 volt A C. Vital Bus # 1 til energized from its associated invener connected to D C Bus # 1.Ill' f,
120 voit A C Vital Bus # 1 IV energized from its associated inverter connected to D C Bus # 1 IV' APPUC A9 TUN MODES 1,2,3, and 4 ACTION a
With one of the reovired A C Emergency busses not fully energized re enijze within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in at least HOT STANDBY mthin the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b With one A C Vital Bus not energized, re energi2e the A C Vital Bus within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> er be in at least HOT STANDBY within the nex16 hours and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> c.
With one A.C. Vital Bus either not energ ted trom its asscoated inverter, or with the inverter not connected to its associated D C. Bus, re energize the A C. Vital Bus from its associated invener connected to its assooated D C Bus within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of be in at least HOT ST ANDBY wthin the ner16 hours and in COLD SHUTDOWN wthin the fotbeng 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- Two inverters may be disconnected from their D C Busses for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> as necessary, for the purpose of performing an equalizing charge on their assocated battery t,anks provided (1) their vital bustes are energized, and (2) the remaining vital busses are energized from their associated inver1ers and connected to their associated D.C. Busses.
NORTH ANNA UNIT 1 3'486 Amendrnent No. 755. 155 r
ELECTRIC AL POWER SYSTEMS A C. L!ST 9'BUT!CN. OPER AT ING 9PS1! 4mrCOJUMlT 4821 The $DeDfied A C busse $ Shall be ceterrnned OPERABLE mth t:e breakers coen between recundant busses at least once per 7 days by ventymg correct brea6 :' al gnment ard indicated power a vMa>lt1i NORTH ANNA UNIT 1 3'4 8 6a Amendment No, 155
>n.,
/
'o.
UNITE D $TATC$
i NUCLEAR REGULATORY COMMISSION
,y l% ASHINGTON. O C. 20%4 s, e... * /
VIRGIN 1A ELECTRIC AND POWER COMPANY OLD DOMINION ELECTRIC COOPERATIVE DOCKET NO. 50-339 NORTH ANNA POWER STATION. UNIT NO. ?
AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.137 License No. NPF-7 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendrent by Virginia Electric and Power Company, et al., (the licensee) dated June 26, 1990, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter 1; B.
The facility wi'i operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There it, reasonable assurance (1) that the activities authorized by this amendment can be ennducted without endangering the health and safety of the public, and (ii) that sucn activities will be cr njucted ', compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the publict and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
I 1
2 2.
Accordingly, the license is amended by changes to the Technical $peci.
fications as indicated in the attachment to ttis license arnendment, and paragraph 2.C.(2) of facility Operating License No. Npf.7 is tereby anended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.137
, are hereby incorporated in the license. The licensee shall operate the f acility in accordance with the Technical Specifications.
3.
This license amendment is effcctive as of the date of issuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMil5510N b
Herbert N. Berkow, Director project Directorate 11+2 Division of Reactor projects - 1/11 Office of Nuclear Reactor Regulation Attachrent:
Changes to the Technical Specifications Date of 1ssuance: April 21, 1992 l
l l
l
l l
ATf AC)D4ENT TO llCENSE kJ4ENDMf NT NO.137_,
TO FAtlllTY OPERAllNG, LICENSE NO. hpf-7 IMrET NO. 60-33 Replace the following pages of the Apperdix "A* Technical Specifications with the enclosed pages as indicated. The revised pages are identified by amendrent nutter and contain vertical line, indicating the area of change, pace F 8-11 3/4 B-11a (new) 3/4 B-12*
- There are no changes to this page, it is included to maintain document completeness.
~
.-_m
ELECTRICAL POWER SYS TEMS 14 2 2 ONSITE POWER DISTRIBUTION SYSTEMS
)
i A C DISTRIBUTION. OPERATING
@M$3DiT10N FOR OPERATION,__
3 8 2.1 %e toneeng A C. electncal busses shall be OPERABLE and energized with tie breakers open between redundant busses:
a.
H A C Emergency Busses censisting of;
- 1. 4160 von Ernergency Bus # 2H
- 2. 480 vort Emergency Busses # 2H,2H1 b.
J A.C Emergency Busses consisting of.
- 1. 4160 von 8Pnergency Bus # 2J
- 2. 480 vott Emergency Busses # 2J. 2J1 c.
120 volt A C. Vital Bus # 21 energized from its associated inverter connected to D C. Bus # 2 l' d-120 voit A C Vital Bus # 2 l! energ'nd from its assodated inverter connected to D C. Bus # 2 II' e.
120 von A C. Vital Bus # 2111 energ' red from its associated inverter connected to D C Bus # 2111' f.
120 volt A C. Vital Bus # 2 IV energ.20d from its associated inverter connected to D C Bus # 2 IV' APPLIC ABILITY, MODES 1,2. 3. and 4.
ACTION-a.
With one of the required A C Emergency busses not fulty energized, re enerpre wrtnin 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be an at !(ast HOT ST ANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the fotbwing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b.
With one A C Vital Bus net energ' red re energize the A C. Vilai Bus wiihin 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of be in at least HOT STANDBY within the nert 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the fonceng 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
c.
With one A.C. Vital Bus either not energized from its asmated inverter, or with the inverter not connected to its associated D.C. Bus, re energize the A C. Vital But from its associated inverter connected to its associated D C. Bus with:n 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY wiC.in the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
'Two inverters may be disconnected from their D C. Busses for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> as necessary, for the purpose of pertoming an equalizing charge on their associated battery banks provided (1) their vital busses are energized, and (2) the remaining vitEl busses are energized from their associated laverters and j
connected to their associated D.C. Busses.
I Amendment No.137 NORTH ANNA UNIT 2 3'4811 mvrw T-------w:-
--us---
- gmm r----m w
e.m+
..r-----
--u-
-wm- - - - - ' esp-y?-
--.m
---g-'-
w ym-7 c
ELECTRIC AL POWER SYSTE!dS A C DISTA'90 TION _ OPERATING 93TJ1!#CErlD_filttM 4 8 2.1 The Specified A C, busses shall be deterrnned OPERABLE mth lie breakers Open between redundant busses at least once per 7 days by sentpng correct breaker abgnment and irocated (cwer avaitadhty.
I NORTH ANNA UNIT 2 3/4 611a Amendment No, 137
. _ _ ~
i ELECTRICAL POWER SYSTEMS A.C. DISTRIBUTION SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.2.2 As a minimum, the following A.C. electrical busses shall be OPERABLE.
1 - 4160 volt Energency Bus, (2H or 2J) 1 - 480 volt Emergency Bus, (2H, 2H1) or (2J 2J1) 2 - 120 volt A.C. Vital Busses, (2-1, 2-11) or (2-!!I, 2-IV)
APPL lCABILITY:
MODES 5 and 6.
ACTION:
With less than the above complement of A.C. busses OPERABLE and energized, establish CONTAIHMENT INTEGRITY within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
'URVEILLANCE REQUIREMENTS i
4.8.2.2 The specified A.C. busses shall be determined OPERABLE at least once per 7 days by verifying correct breaker alignment and indicated power availability.