Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20096C178 + (13:07:34, 13 December 2024)
- B11300, Discusses Use of Probabilistic Safety Study in Licensing Process.Discussion of Study Should Be Done on Parallel Path & Not Be Considered Part of Licensing Process for Plant + (13:07:35, 13 December 2024)
- ML20096C167 + (13:07:35, 13 December 2024)
- ML20096C162 + (13:07:36, 13 December 2024)
- ML20096C156 + (13:07:38, 13 December 2024)
- RBG-18726, Interim Deficiency Rept DR-212 Re Battery Cell Spacer Matl Mfg by Gould Co.Next Rept Will Be Submitted by 840918 + (13:07:38, 13 December 2024)
- 3F0196-05, Monthly Operating Rept for Dec 1995 for Crystal River Unit 3 + (13:07:39, 13 December 2024)
- ML20096C133 + (13:07:40, 13 December 2024)
- ML20096C128 + (13:07:41, 13 December 2024)
- RBG-18-705, Interim Deficiency Rept DR-185 Re Location of Isolation Valves for RCIC Turbine Exhaust Line Vacuum Breaker Sys.Next Rept Will Be Submitted by 840925 + (13:07:41, 13 December 2024)
- ML20096C126 + (13:07:42, 13 December 2024)
- ML20096C122 + (13:07:43, 13 December 2024)
- TXX-4290, Forwards Preservice Insp Plan Relief Requests C-5 & C-6 & Revised Relief Requests B-8 & B-10,per NRC Question 121.13 + (13:07:43, 13 December 2024)
- RBG-18730, Final Deficiency Rept DR-199 Re Separation of Coaxial & Twinaxial Cables from Connectors on Conax Corp Electrical Penetration Assemblies.Initially Reported on 840720. Penetrations Will Be Reassembled & Connectors Reinstalled + (13:07:44, 13 December 2024)
- ML20096C112 + (13:07:45, 13 December 2024)
- ML20096C116 + (13:07:45, 13 December 2024)
- TXX-4289, Forwards Estimated Staffing Levels & Qualifications,Per L Crocker Request + (13:07:46, 13 December 2024)
- DCL-84-294, Forwards Changes to Rev 11 to Security Plan,Rev 2 to Safeguards Contingency Plan & Rev 2 to Training & Qualification Plan.Revs Withheld (Ref 10CFR73.21) + (13:07:50, 13 December 2024)
- ML20096C110 + (13:07:50, 13 December 2024)
- ML20096C099 + (13:07:51, 13 December 2024)
- ML20096C098 + (13:07:52, 13 December 2024)
- ML20096C094 + (13:07:52, 13 December 2024)
- ML20096C092 + (13:07:53, 13 December 2024)
- ULNRC-03312, Monthly Operating Rept for Dec 1995 for Callaway Unit 1 + (13:07:54, 13 December 2024)
- RBG-18719, Interim Deficiency Rept DR-228 Re Linear Indications on Cylinder Head Valves in Standby Diesel Generators Supplied by Tdi.Next Rept Will Be Provided by 841024 + (13:07:54, 13 December 2024)
- 3F0592-05, Communicates Info Relative to Content of NRC Insp Rept 50-302/91-22 on 911104-08.Util in Process of Implementing Enhancements to Improve Capabilities in Area of Trending Programs + (13:07:55, 13 December 2024)
- ML20096C064 + (13:07:56, 13 December 2024)
- ML20096C059 + (13:07:56, 13 December 2024)
- ML20096C051 + (13:07:57, 13 December 2024)
- PY-CEI-NRR-2013, Application for Amend to License NPF-58,requesting one-time Surveillance Interval Extension to Support Current Schedule for Refueling Outage 5,scheduled to Begin 960127 + (13:07:58, 13 December 2024)
- LIC-95-0245, Forwards Response to Weaknesses Identified During 1995 Emergency Exercise Conducted on 951114 Re NRC Insp Rept 50-285/95-15.Corrective Actions:Util Will Implement Appropriate Revs to EPIP-TSC-8 by 960315 + (13:07:59, 13 December 2024)
- ML20096C039 + (13:07:59, 13 December 2024)
- ML20096C033 + (13:08:00, 13 December 2024)
- ML20096C030 + (13:08:01, 13 December 2024)
- ML20096C032 + (13:08:01, 13 December 2024)
- ML20096C028 + (13:08:02, 13 December 2024)
- ML20096C026 + (13:08:03, 13 December 2024)
- ML20096C025 + (13:08:03, 13 December 2024)
- ML20096C024 + (13:08:04, 13 December 2024)
- ML20096C020 + (13:08:06, 13 December 2024)
- ML20096C016 + (13:08:06, 13 December 2024)
- ML20096C014 + (13:08:07, 13 December 2024)
- PY-CEI-NRR-1494, Submits Correction to 920427 Cover Ltr for Annual Operating Rept for Perry Nuclear Power Plant,Unit 1 for Jan-Dec 1991. Original Submittal Incorrectly Identified Reporting Period Yr as 1990 + (13:08:08, 13 December 2024)
- ML20096B994 + (13:08:09, 13 December 2024)
- ML20096B991 + (13:08:10, 13 December 2024)
- 05000327/LER-1995-017, :on 951208,manual RT Initiated as Result of Failed Air Line to FW Regulator Valve That Caused Low SG Level.Changed Configurations on Four Valves by Installing New Tubing & Fittings + (13:08:12, 13 December 2024)
- ML20096B982 + (13:08:13, 13 December 2024)
- PY-CEI-NRR-2012, Forwards Response to NRC Re Violations Noted in Insp Rept 50-400/95-08.Corrective Actions:Removed Two Operators Responsible for Event from Licensed Duties & Have Been Counseled Re Improper Actions + (13:08:13, 13 December 2024)
- ML20096B965 + (13:08:14, 13 December 2024)
- ML20096B963 + (13:08:16, 13 December 2024)
- ML20096B950 + (13:08:17, 13 December 2024)