Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20097A359 + (12:44:45, 13 December 2024)
- ML20097A358 + (12:44:46, 13 December 2024)
- 05000254/LER-1992-015, :on 920427,discovered LPCI & Core Spray Valve Yokes Outside FSAR Design Basis During Vessel Blowdown to Torus.Caused by Inadequate Design Control.Valve Yokes Replaced + (12:44:48, 13 December 2024)
- ML20097A354 + (12:44:49, 13 December 2024)
- ML20097A352 + (12:44:50, 13 December 2024)
- ST-HL-AE-5285, Forwards 2RE04 ISI Summary Rept for Repairs & Replacements STP Electric Generating Station,Unit 2 + (12:44:50, 13 December 2024)
- BECO-84-143, Forwards Radioactive Effluent & Waste Disposal Rept Including Radiological Impact on Humans for Jan-June 1984. Meteorological Data & Radiation Dose Info,W/Exception of Offsite Direct Radiation Dose Rates,Not Included in Rept + (12:44:51, 13 December 2024)
- ML20097A347 + (12:44:51, 13 December 2024)
- ML20097A338 + (12:44:52, 13 December 2024)
- ML20097A335 + (12:44:53, 13 December 2024)
- ML20097A317 + (12:44:54, 13 December 2024)
- ML20097A333 + (12:44:54, 13 December 2024)
- 1CAN059202, Revises Commitments Re Surveillance Testing,Temp Monitoring & Operator Actions Following HPI Backflow Event in 1989 & Updates NRC on Current Actions Being Taken as Result of Event + (12:44:55, 13 December 2024)
- ML20097A311 + (12:44:55, 13 December 2024)
- ML20097A309 + (12:44:56, 13 December 2024)
- 05000348/LER-1984-014, :on 840804,found Potentiometers for Channel NI-43 Input to OT-delta-T Circuit Not Adjusted.Caused by Procedural Inadequacy in Adjustments.Rev to Procedures Planned + (12:44:58, 13 December 2024)
- ML20097A286 + (12:44:59, 13 December 2024)
- ML20097A283 + (12:45:00, 13 December 2024)
- PLA-2273, Monthly Operating Repts for Jul 1984 + (12:45:00, 13 December 2024)
- ML20097A279 + (12:45:01, 13 December 2024)
- ML20097A276 + (12:45:02, 13 December 2024)
- ML20097A268 + (12:45:03, 13 December 2024)
- U-101988, Interim Part 21 & Deficiency Rept Re ASTM A-36 Plate Matl. Initially Reported on 840803.Investigation Plan Implemented as Listed.Next Rept Will Be Provided in Approx 90 Days + (12:45:04, 13 December 2024)
- ML20097A263 + (12:45:04, 13 December 2024)
- ML20097A254 + (12:45:06, 13 December 2024)
- JPN-92-024, Responds to Requesting That Util Review FitzPatrick IPE to Assess Accuracy of IPEs Underlying Evaluations & Conclusions & Reconcile W/Findings of Det + (12:45:07, 13 December 2024)
- ML20097A235 + (12:45:10, 13 December 2024)
- ML20097A229 + (12:45:12, 13 December 2024)
- ML20097A227 + (12:45:13, 13 December 2024)
- ML20097A193 + (12:45:14, 13 December 2024)
- ML20097A213 + (12:45:14, 13 December 2024)
- ML20097A192 + (12:45:15, 13 December 2024)
- ML20097A187 + (12:45:15, 13 December 2024)
- ML20097A186 + (12:45:16, 13 December 2024)
- JPN-96-005, Forwards Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode + (12:45:17, 13 December 2024)
- NG-96-0063, Application for Amend to License DPR-49,proposing Rev to Ts. Proposed Change Will Revise CR Scram Insertion Time Testing Limits + (12:45:22, 13 December 2024)
- ML20097A178 + (12:45:22, 13 December 2024)
- 05000458/LER-1995-013-02, :on 951228,operation Was Outside TS Limits Due to Trip,Maint & Repair of EDG Ii.Repaired Lube Oil Cooler Leak + (12:45:24, 13 December 2024)
- ML20097A164 + (12:45:25, 13 December 2024)
- ML20097A163 + (12:45:26, 13 December 2024)
- 05000446/LER-1996-001, :on 960107,allowed Outage Time Was Exceeded in Conjunction W/Enforcement Discretion for RCS Instrument Channel.Caused by Action Statement Requirements Not Being Met + (12:45:28, 13 December 2024)
- ML20097A150 + (12:45:29, 13 December 2024)
- ML20097A157 + (12:45:29, 13 December 2024)
- NRC-92-0067, Forwards Rev 19 to Physical Security Plan.Rev Withheld + (12:45:30, 13 December 2024)
- 05000458/LER-1996-002, :on 960105,return Piping Weld for RHR Was Missing from Suppression Pool Level.Caused by Lack of Fusion on C Steel Side of Weld.Reassembled Pipe in Sys During Scheduled Maint Period Outage + (12:45:32, 13 December 2024)
- ML20097A135 + (12:45:33, 13 December 2024)
- RBG-42414, Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-458/95-25.Corrective Actions:Condition Rept 95-1145 Was Initiated to Document Described Condition & Implement Corrective Actions + (12:45:33, 13 December 2024)
- ML20097A129 + (12:45:35, 13 December 2024)
- ML20097A127 + (12:45:36, 13 December 2024)
- ML20097A125 + (12:45:37, 13 December 2024)
- LD-92-069, Forwards Rept NPX80-IC-DR-791-02, Human Factors Engineering Stds,Guidelines & Bases for Nuplex 80+. Rept Provides Info to Suppl Previous RAI Responses on Human Factors Engineering of Control Room,In Fulfillment of 920417 Commitments + (12:45:38, 13 December 2024)