Text
.
f.
-1 OPERATING DATA REPORT.
DOCKET NO.
50-244 DATE An mm t-3.
1984 COMPLETED BY d bd.h- +
Andrew E. NcNamara TELEPHONE 1(315) 524-4446 OPERATING STATUS Ext. 301
- 1. Unit Name:
GINNA STATION. UNIT #1 Notes
- 2. Reporting Period:
July, 1984 The reactor power level
- 3. Licensed Thermal Power (MWt):
1520 was maintained at 100%
- 4. Nameplate Rating (Gross MWe):
490 for the majority of the
- 5. Design Electrical Rating (Net MWe):
470 report period with some
- 6. Maximum Dependable Capacity (Gross MWe):
490 exceptions detailed on
- 7. Maximum Dependable Capacity (Net MWe):
470 Page 4.
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, if Any:
This Month Yr.-to-Da te Cumulative I1. Ilours In Reporting Period 744 5,111 128,687
- 12. Number of Hours Reactor Was Critical 744.00 3,175.73 96,775.71
- 13. Reactor Reserve Shutdown Hours 0.00 56.23 1,687.55*
- 14. Ilours Generator On-Line 744.00 3.107.75 94,619.38
- 15. Unit Reserve Shutdown Hours 0.00 0.00 8.50*
- 16. Gross Thermal Energy Generated (MWH) 1 123,896 4,493,832 130 751,201_
- 17. Gross Electrical Energy Generated (MWH) 371,297 1,492,902 42,657,272
- 18. Net Electrical Energy Generated (MWH) 353,248 1,418,056 40,444,301
- 19. Unit Service Factor 100%
60.81%
73.53%
- 20. Unit Availability Facto, 100%
60.81%
73.53%
- 21. Unit Capacity Factor (Using MDC Net) 101.02%
59.03%
68.58%
- 22. Unit Capacity Factor (Using DER Net) 101.02%
.59.03%
68.58%
- 23. Unit Forced Outage Rate 0.00%
7.85%
8.01%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
- 25. If Shut Down At End Of Report. Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecas t Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 4
- Cummulative Total Commencing January 1, 1975.
e e-s e m v. um 8409130208 840803 N
PDR ADOCK 05000244 g/f R
py
,. + '
' AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-244 UNIT
- 1, Ginna Station DATE August 3, 1984 COMPLETED BY 6, L f f, Mo _
m __
An~ drew E.
McNhmara TELEPHONE l'(315) 524-4446 Ext. 301 at Ginna MONTH July 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
482 17.
474 2.
481 18.
473 3.
480 19.
473 4.
478 20.
473 5.
477 21.
473 6.
479 22.
475 1
7.
477 23.
473 8.
469 24.
470 9.
468 25.
472 10.
478 26.
472 11.
477 27.
472 12.
475 28.
475 13.
476 29.
472
~
14.
477 30.
474 15.
476 31.
471 16.
474 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
e D(X:KET NO.
50444 UNIT NAME #1,Girna Se tion UNIT SHUTDOWN AND POWER REDUCTIONS DATE Anaust 3.
1984 COMPLETED itY kh E M c-- '--
Andrew E.
Mchhmara REPORT MONTII July, 1984 TELEPilONEl f 315 i 524-4446 Ext. 301 m
m5 N
e c
Licensee s,e gm Cause & Corrective o e u
,o O c
j 2
},{ j Event f.g g, -3 Action to No.
Da te
{
o Report #
- d
!u Prervent Recurrence D-dZ j
- eec 2
g u
O PR*
7-8-84 F
/s4.5 A
N/A N/A Load reduction to 79% reactor power level at the request of Power Control.
On the bulk transmission system, equipment failure led to an overloaded facility which could only be corrected by reduced generatior 1
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction' 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
E G-Operational Error (Explain) 4...
inzv.inni II-Other (Explain)
Exhibit 1 - Same Soarce
- Power Reduction
- Equipment problem that caused the load reduction were outside Ginna Station.
=... '
_,f NARRATIVE SUBSEARY OF OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT Ginna Station, Unit #1 DATE August 3, 1984 COMPLETED BY--
b.
Andrew E.
McNdmara TELEPHONE-1 (315) 524-4446 EXT. 301 at Ginna MONTH July-1984 The reactor power level was maintained at 100% for the majority of the report period.
The exceptions were:
On July 4, 1984, problems with heater drain tank level oscillations caused a power level reduction to approximately 96% for a short period.
On July 8,
1984, the power level was reduced to ~~79% at the request of Power Control.
On the bulk transmission system, equipment failure led to an overloaded facility which could only be corrected by reduced generation.
t
+
e' ' t GINNA STATION MAINTENANCE REPORT
SUMMARY
JULY, 1984 During the month ~of' July,. routine maintenance and inspections were performed.
Safety related maintenance included:
Inspection and preventive maintenance of the Motor Driven Fire Pump.
1.
2.
Inspection and preventive maintenance'of the IC & 1D Standby Auxiliary Feedwater Pumps.
3.
Inspection and preventive maintenance of the 1A Containment Spray
' Pump.
d 3
]
t'
..,-3
,m__,.
-