Monthly Operating Rept for Jul 1984
ML20097A213
Person / Time
Site: Ginna 
Issue date: 07/31/1984
From: Mcnamara A
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML20097A196 List:
References
NUDOCS 8409130208
Download: ML20097A213 (5)


Text

.

f.

-1 OPERATING DATA REPORT.

DOCKET NO.

50-244 DATE An mm t-3.

1984 COMPLETED BY d bd.h- +

Andrew E. NcNamara TELEPHONE 1(315) 524-4446 OPERATING STATUS Ext. 301

1. Unit Name:

GINNA STATION. UNIT #1 Notes

2. Reporting Period:

July, 1984 The reactor power level

3. Licensed Thermal Power (MWt):

1520 was maintained at 100%

4. Nameplate Rating (Gross MWe):

490 for the majority of the

5. Design Electrical Rating (Net MWe):

470 report period with some

6. Maximum Dependable Capacity (Gross MWe):

490 exceptions detailed on

7. Maximum Dependable Capacity (Net MWe):

470 Page 4.

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, if Any:

This Month Yr.-to-Da te Cumulative I1. Ilours In Reporting Period 744 5,111 128,687

12. Number of Hours Reactor Was Critical 744.00 3,175.73 96,775.71
13. Reactor Reserve Shutdown Hours 0.00 56.23 1,687.55*
14. Ilours Generator On-Line 744.00 3.107.75 94,619.38
15. Unit Reserve Shutdown Hours 0.00 0.00 8.50*
16. Gross Thermal Energy Generated (MWH) 1 123,896 4,493,832 130 751,201_
17. Gross Electrical Energy Generated (MWH) 371,297 1,492,902 42,657,272
18. Net Electrical Energy Generated (MWH) 353,248 1,418,056 40,444,301
19. Unit Service Factor 100%

60.81%

73.53%

20. Unit Availability Facto, 100%

60.81%

73.53%

21. Unit Capacity Factor (Using MDC Net) 101.02%

59.03%

68.58%

22. Unit Capacity Factor (Using DER Net) 101.02%

.59.03%

68.58%

23. Unit Forced Outage Rate 0.00%

7.85%

8.01%

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25. If Shut Down At End Of Report. Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecas t Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 4

  • Cummulative Total Commencing January 1, 1975.

e e-s e m v. um 8409130208 840803 N

PDR ADOCK 05000244 g/f R

py

,. + '

' AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-244 UNIT

  1. 1, Ginna Station DATE August 3, 1984 COMPLETED BY 6, L f f, Mo _

m __

An~ drew E.

McNhmara TELEPHONE l'(315) 524-4446 Ext. 301 at Ginna MONTH July 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1.

482 17.

474 2.

481 18.

473 3.

480 19.

473 4.

478 20.

473 5.

477 21.

473 6.

479 22.

475 1

7.

477 23.

473 8.

469 24.

470 9.

468 25.

472 10.

478 26.

472 11.

477 27.

472 12.

475 28.

475 13.

476 29.

472

~

14.

477 30.

474 15.

476 31.

471 16.

474 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

e D(X:KET NO.

50444 UNIT NAME #1,Girna Se tion UNIT SHUTDOWN AND POWER REDUCTIONS DATE Anaust 3.

1984 COMPLETED itY kh E M c-- '--

Andrew E.

Mchhmara REPORT MONTII July, 1984 TELEPilONEl f 315 i 524-4446 Ext. 301 m

m5 N

e c

Licensee s,e gm Cause & Corrective o e u

,o O c

j 2

},{ j Event f.g g, -3 Action to No.

Da te

{

o Report #

  1. d

!u Prervent Recurrence D-dZ j

  • eec 2

g u

O PR*

7-8-84 F

/s4.5 A

N/A N/A Load reduction to 79% reactor power level at the request of Power Control.

On the bulk transmission system, equipment failure led to an overloaded facility which could only be corrected by reduced generatior 1

2 3

4 F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction' 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative 5

E G-Operational Error (Explain) 4...

inzv.inni II-Other (Explain)

Exhibit 1 - Same Soarce

  • Power Reduction
    • Equipment problem that caused the load reduction were outside Ginna Station.

=... '

_,f NARRATIVE SUBSEARY OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT Ginna Station, Unit #1 DATE August 3, 1984 COMPLETED BY--

b.

Andrew E.

McNdmara TELEPHONE-1 (315) 524-4446 EXT. 301 at Ginna MONTH July-1984 The reactor power level was maintained at 100% for the majority of the report period.

The exceptions were:

On July 4, 1984, problems with heater drain tank level oscillations caused a power level reduction to approximately 96% for a short period.

On July 8,

1984, the power level was reduced to ~~79% at the request of Power Control.

On the bulk transmission system, equipment failure led to an overloaded facility which could only be corrected by reduced generation.

t

+

e' ' t GINNA STATION MAINTENANCE REPORT

SUMMARY

JULY, 1984 During the month ~of' July,. routine maintenance and inspections were performed.

Safety related maintenance included:

Inspection and preventive maintenance of the Motor Driven Fire Pump.

1.

2.

Inspection and preventive maintenance'of the IC & 1D Standby Auxiliary Feedwater Pumps.

3.

Inspection and preventive maintenance of the 1A Containment Spray

' Pump.

d 3

]

t'

..,-3

,m__,.

-