' di OPERATING DATA REPORT DOCKET NO.
50-397 WNP-2 UNIT 0/l/04 DATE L.B. HutChison COMPLETED BY TELEPHONE (509) 377-2501 Ext. 2486 OPER ATING STATUS JULY 1984 GROSS HOURS IN REPORTING PERIOD:
744
- 1. REPORTING PERIOD:
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3323 MAX. DEPEND. CAPACITY (MWe-Net): IInn DESIGN ELECTRICAL RATING (MWe Net): 1100
- 3. POWER LEVEL TO WHICH RESTRICTED (lF A Y) (MWe-Net): 55% Net MWe Capacity J
- 4. REASONS FOR RESTRICTION (IF ANY): plan
$ in the Startup and Power Ascension Test l
PhaseandmustCompletetestConilon2requirel.gn l
1 prior to exceeding 55% power.
I NTH YR TO DATE CUMULATIVE I
l
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL.............. 243.86 652.06 652.06
(
- 6. REACTOR R ESERVE SHUTDOWN HOURS.................
198.9 427.4 427.4
- 7. HOURS GENERATOR ON LINE.........
- 8. UNIT RESERVE SHUTDOWN HOURS 0
0 0
- 9. GROSS THERMAL ENERGY GENERATED (MWH) 259,168 466,245 466.245 67.713 102.495 102.495
- 10. GROSS ELECTRICAL ENER,Y GENERATED (MWH)..
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 61.120 89.768 89.768 j
- 12. R EACTOR SE RVICE F ACTOR.......................
N/A N/A N/A
- 13. REACTOR AVAILABILITY FACTOR........
N/A N/A N/A j
- 14. UNIT SERVICE FACTOR.............
N/A N/A N/A 1 s'. U NIT AV A I LA BI LITY F ACTO R,.......................,
N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A
- 18. UNIT FORCED OUTAGE RATE
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
gopofPowerTest,8/4 NOR PR D.
S A
ATE OF STARTUP: Auaust 2. 1984 20.IF H
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITI AL CRITICALITY l/l0/04 I/l9/04 INITIAL ELECTRICITY 5/15/84 5/27/84 COMM ERCI AL OF ERATION 9/22/84 G ER OR kMEP E
T G 2
,70b K k 0 0.975 of 1
8409130250 840731
'lt PDR AD0CK 05000397 R
4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-397 UNIT WNP-2 DATE 8/1/84 COMPLETED BY L'.B. Hutchison TELEPHONE (509) 377-2501 Ext.
2486 MONTH JULY 1984 DAY AVERAGE IY WER LEVEL DAY AVERAGE IL ' P WER LEVEL 0
I 0
17 2
72
- 0 1,
3 255 0
4 358 20.
0 5
339 21 n
s 338 22 0
7 344 23 n
349 3
24 0
g 347 25 0
145 to 26 0
11 0
27 0
12 0
2s 0'
13 0
29 n
i 14 0
20 0
15 0
31 0
16 0
c INSTRUCTIONS Or. this form, list the average daily unit power level in MWe Net for each dayin the reporting month.Cempute to the nearest whole megawatt.
Taese figures will be used to plot a graph for each reporting month. Note that when ma.tmurn dependabie capacity is used for the net electncal rating of the unit. there may be occasions when the daily average power level exceeds the 10GT. line (or the restnet:d power level hne). In such cases. the average daily unit power output sheet should be footnoted to explain the appstent anomaly.
. ~
3, 00(XET NO..-
150-397J -
UNI'T NME WNP-2~
DATE 8/1/84
~
- LNIT Sf0TDOWNS / REDUCTIONS COMPLETED BY.
~L.B. Hutchison:
REPORT PERIOD ' July 19 _84 TELEPHOPE (509) 377-2501 Exti. - 2486 ?
- month, year
-j NO..
DATE TVPE HDE REA5N TETRIf N 3Y5Tm T2WWENT CAUSE & CUNNt.CTIVE ACTION TD FREVENT RECURRENCE l, '
'84-11 6/19/84 F 36.3 A
4 HE VALVEX X Plant 1 shutdown to repair a Turbine by pass valve which stuck open following a planned.
trip of generator. The valve was repaired however the outage was extended due to repair:
on RHR Pump."B" 84-12 7/10/84 F 508.8 A
1 84.075 EB GENERA D ~
During monthly surveillance testing of Standby i
Diesel Generator 1B~(DGlB) the slip. ring end bearing turned on the shaft" insulation, thus' destroying the insulation and allowing the
shaft to. drop slightly and rub on bearing'-
t housing. Modifications, to improve reliability, were made by mounting the bearings directly:to shaft and insulating the bearing housing.c.(See j-LER 84-075).
1 I
I l SLM4ARY l i
TYPE REASON METHOD SYSTEM & COMP 0ENT -
F-Forced A-Equip Failure
- F-Admin 1-Nanual Exhibit F & H S-Sched B-Maint or Test
. G-Oper Error 2-Manual Scram
- Instructions for i
C-Refueling H-Other Auto Scram Preparation of D-Regulatory Restriction 4-Continued
' Data Entry Sheet E-Operator Training 5-Reduced Load Licensee. Event Report-i
& License Examination 9-Other (LER) File (POREG-0161)
, r.
s
O,E a
Wasisington Public Power Supply System P.O. Box 968 3000 GeorgeWashingtonWay ' Richiar1 Washington 99352 ' (509)372-5000 f.
Docket No. 50-397 Director Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Sir:
Subject:
NUCLEAR PLANT N0.'2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for July 1984.
as required by our Technical Specification 6.9.1.6.
Very truly your
. D. Ma rtin (M/D 927M)
WNP-2 Plant Manager JDM;pl Enclosure cc: Mr. John B. Martin - NRC, Region V Mr. A. D. Toth - NRC, WNP-2 Site Ms. Dottie Sherman - ANI, Farmington, CT d
, i i
L: