Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20097C837 + (12:37:39, 13 December 2024)
- ML20097C834 + (12:37:40, 13 December 2024)
- ML20097C836 + (12:37:40, 13 December 2024)
- ML20097C826 + (12:37:43, 13 December 2024)
- ML20097C818 + (12:37:44, 13 December 2024)
- 05000325/LER-1984-016, :on 840807,normal Power Feeder Breaker 2D Tripped.Group 6 & 8 Isolations Occurred & Air Filtration Sys Isolated Due to Spurious Chlorine Alarm.Caused by Design Misapplication of Degraded Voltage Relay + (12:37:46, 13 December 2024)
- ML20097C803 + (12:37:48, 13 December 2024)
- ML20097C795 + (12:37:49, 13 December 2024)
- 05000387/LER-1984-038, :on 840807,discovered Relays Which Control RHR Sys Shutdown Cooling Mode Isolation on High Area Differential Temp Not Tested Since 820127.New Procedures & Surveillance to Be Implemented + (12:37:51, 13 December 2024)
- ML20097C786 + (12:37:52, 13 December 2024)
- ML20097C784 + (12:37:53, 13 December 2024)
- ML20097C783 + (12:37:54, 13 December 2024)
- 05000374/LER-1984-050, :on 840810,reactor Scram Occurred Due to Reactor Vessel High Pressure During Performance of Control Valve Surveillance Test.Caused by Sudden Pressure Increase W/Control Valve 1 Closed + (12:37:56, 13 December 2024)
- GL-728509-25, GLTS: Past Due General License Device Annual Registration: Rev Energy Services GL-728509-25 + (12:37:57, 13 December 2024)
- 05000388/LER-1984-015-01, :on 840802,reactor Water Cleanup Sys Isolated on High Flow.No Pipe Break Identified.Caused by PDIS-G33-2N044A Out of Calibr Due to Instrument Drift. Instrument Recalibr & Returned to Svc + (12:38:01, 13 December 2024)
- 05000373/LER-1984-048-01, :on 840810,noble Gas Grab Sample Not Obtained in Violation of Tech Spec 4.11.2.1.2.Caused by Personnel Error in Not Relaying Info & Less than Strict Adherence to Surveillance Procedure + (12:38:03, 13 December 2024)
- AECM-84-0349, Forwards Response to Generic Ltr 83-28,Item 4.5 Re Enhanced Reliability of Reactor Trip Sys Provided by Functional testing.On-line Testing Not Performed Due to Unnecessary Challenge to Plant Safety Sys Posed by Testing + (12:38:04, 13 December 2024)
- ML20097C746 + (12:38:05, 13 December 2024)
- ML20097C744 + (12:38:06, 13 December 2024)
- ML20097C738 + (12:38:06, 13 December 2024)
- RBG-18802, Interim Deficiency Rept DR-234 Re Internal Attachment Bolts in Check Valves Supplied by Velan Engineering Co.Next Rept to Be Provided by 841109 + (12:38:07, 13 December 2024)
- ML20097C728 + (12:38:08, 13 December 2024)
- ML20097C725 + (12:38:09, 13 December 2024)
- ML20097C723 + (12:38:10, 13 December 2024)
- ML20097C718 + (12:38:10, 13 December 2024)
- RBG-18759, Final Deficiency Rept DR-178 Re four-way Connector of Turbocharger Prelube Sys on Standby Diesel Generator A. Proper Operation of Turbocharger Prelube Sys Unaffected by Connector Orientation.Not Reportable Under 10CFR50.55(e) + (12:38:11, 13 December 2024)
- ML20097C714 + (12:38:12, 13 December 2024)
- ML20097C702 + (12:38:13, 13 December 2024)
- ML20097C700 + (12:38:13, 13 December 2024)
- ML20097C695 + (12:38:14, 13 December 2024)
- ML20097C690 + (12:38:15, 13 December 2024)
- ML20097C678 + (12:38:16, 13 December 2024)
- ML20097C677 + (12:38:17, 13 December 2024)
- ML20097C671 + (12:38:17, 13 December 2024)
- 05000368/LER-1984-021, :on 840728,automatic Reactor Trip Occurred Due to High Level on Steam Generator B.Main Feedwater Flow Increased in Response to Decreasing Steam Generator Level.No post-trip Anomalies Noted + (12:38:19, 13 December 2024)
- ML20097C668 + (12:38:20, 13 December 2024)
- ML20097C667 + (12:38:21, 13 December 2024)
- ML20097C664 + (12:38:21, 13 December 2024)
- ML20097C653 + (12:38:22, 13 December 2024)
- ML20097C651 + (12:38:23, 13 December 2024)
- ML20097C649 + (12:38:24, 13 December 2024)
- ML20097C647 + (12:38:24, 13 December 2024)
- ML20097C646 + (12:38:25, 13 December 2024)
- ZS-2020-0018, Report on Status of Decommissioning Funding for Shutdown Reactors + (12:38:26, 13 December 2024)
- ML20097C643 + (12:38:27, 13 December 2024)
- ML20097C640 + (12:38:27, 13 December 2024)
- ML20097C639 + (12:38:28, 13 December 2024)
- ML20097C637 + (12:38:29, 13 December 2024)
- ML20097C614 + (12:38:30, 13 December 2024)
- ML20097C612 + (12:38:31, 13 December 2024)
- 05000368/LER-1984-017, :on 840713,fire Barrier Penetration 2124-0004 Identified as Degraded During HVAC Mods.Fire Watch Established within 1 H of Discovery.Penetration Repaired by Replacing Plastic Tubing W/Copper Tubing + (12:38:33, 13 December 2024)