ML20097C646
| ML20097C646 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 03/26/2020 |
| From: | Gerard van Noordennen LaCrosseSolutions |
| To: | Office of Nuclear Material Safety and Safeguards, Office of Nuclear Regulatory Research |
| References | |
| LC-2020-0011 | |
| Download: ML20097C646 (2) | |
Text
~
LACROSSESOLUTIONS 10 CFR 20.2206( c)
March 26, 2020 REIRS Project Manager Office of Nuclear Regulatory Research U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 La Crosse Boiling Water Reactor Facility Operating License No. DPR-45 NRC Docket Nos. 50-409 and 72-046
Subject:
Occupational Radiation Exposure Annual Report for 2019 LC-2020-0011 In accordance with 10 CFR 20.2206, "Reports of individual monitoring," paragraph (c), the Annual Dose Report covering the previous year shall be submitted on or before April 30th of each year. The Annual Dose Report for 2019 provides the results of individual radiation monitoring carried out by LaCrosseSolutions, LLC for each individual for whom radiation monitoring was provided during 2019. The report was generated on February 27, 2020 by LaCrosseSolutions, LLC following the guidance provided in Regulatory Guide 8.7, "Instructions for Recording and Reporting Occupational Radiation Exposure Data," Revision 4, dated May 2018. The data file, "NRC5.dat," was submitted electronically via the Radiation Exposure and Information Reporting System (REIRS) internet web page on March 23, 2020.
There are no new regulatory commitments in this submittal.
If you have any questions about this submittal please contact Mr. Joseph Jacobsen at (608) 689-4259.
Respectfully, Gerard van Noordennen Senior Vice President Regulatory Affairs cc:
Marlayna Doell, U.S. NRC Project Manager Service List S4601 State Highway 35, Genoa, WI 54632
- Ur-f5S zl, KESl3 lE5 tvt-fS 5
La Crosse Boiling Water Reactor Service List cc:
Ken Robuck President and CEO Energy Solutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 John Sauger President and Chief Nuclear Officer ReactorD &D Energy Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Joseph Nowak General Manager LaCrosseSolutions S4601 State Highway 35 Genoa, WI54632-8846 Gerard van Noordennen Senior Vice President Regulatory Affairs Energy Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Russ Workman General Counsel Energy Solutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 Jerome Pedretti, Clerk Town of Genoa
- es60 Mundsack Road Genoa, WI 54632 Jeffery Kitsembel Division of Energy Regulation Wisconsin Public Service Commission P.O. Box 7854 Madison, WI 53707-7854 Regional Administrator U.S. NRC, Region III 2443 Warrenville Road Lisle, IL 60532-4352 Paul Schmidt, Manager Radiation Protection Section Bureau of Environmental and Occupational Health Division of Public Health Wisconsin Department of Health Services P.O. Box 2659 Madison, WI 53701-2659 Barbara Nick President and CEO Dairyland Power Cooperative 3200 East Avenue South La Crosse, WI 54602-0817 Cheryl Olson, ISFSI Manager La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 P.O. Box 817 Genoa, WI54632-8846 Lane Peters La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 Genoa, WI 54632-8846 Thomas Zaremba Wheeler, Van Sickle and Anderson, S.C.
44 East Mifflin Street, Suite 1000 Madison, WI 53703 Andrew J. Parrish Wheeler, Van Sickle & Anderson, S.C.
44 E. Mifflin Street, Suite 1000 Madison, WI 53 703 John E. Matthews Morgan, Lewis & Bockius LLP 1111 Pennsylvania A venue, NW Washington, DC 20004