ML20097C744

From kanterella
Jump to navigation Jump to search
Responds to Re Procedures Generation Package - Emergency Operation Guidelines Requesting Util Justify Adequacy of Tech Specs Guidelines.Comparison Document W/Oconee Guidelines to Be Submitted on 841201
ML20097C744
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/10/1984
From: Crouse R
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
1080, NUDOCS 8409170249
Download: ML20097C744 (1)


Text

-

Docket No. 50-346 70tcoo License No. NPF-3 Serial No. 1080 N,$ce uw "w 2maai September 10, 1984 Director of Nuclear Reactor Regulation Attention:

Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Stolz:

Your letter dated August 8, 1984 (Log No. 1570), on the subject of Procedures Generation Package (PGP) - Emergency Operation Guidelines, requested that Toledo Edison justify the adequacy of the Davis-Besse plant specific technical guidelines by referencing the Oconee guide-lines as applicable and by identifying and justifying safety signifi-cance differences between the Davis-Besse guidelines and the Oconee guidelines.

Toledo Edison supports the B&W Owners Group commitment to prepare indi-vidual documents addressing the differences between the PGP and the Oconee guidelines directly. The actions required to create this com-parison document were initiated at the time the Owners Group made the commitment. Babcock & Wilcox is preparing the comparison document because

'of their specific involvement in the creation of both the Oconee and Davis-Besse guidelines. Based on the availability of manpower for this special task, we anticipate that the comparison document will be submitted on December 1, 1984.

In addition to the document describing the differences between the Oconee and Davis-Besse guidelines, Toledo Edison will provide a report which will identify and justify any safety significance differences between the Davis-Besse guidelines is ued to Toledo Edison as a part of the ATOG program and the Emergency Operating Procedures that were developed from those guidelines.

Very truly yours,-

ff

,= n RPC:JRL:bec/nif cc: DB-1 NRC_ Resident Inspector dOf

-THE TOLEDO EDISON COMPANY EDISON DLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 8409170249 840910

,a PDR ADOCK 05000346 PDR P

.