Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20097F611 + (12:26:50, 13 December 2024)
- ML20097F591 + (12:26:51, 13 December 2024)
- HL-2266, Monthly Operating Repts for May 1992 for Plant Hatch,Units 1 & 2 + (12:26:52, 13 December 2024)
- ML20097F584 + (12:26:53, 13 December 2024)
- ML20097F583 + (12:26:54, 13 December 2024)
- ML20097F574 + (12:26:56, 13 December 2024)
- ML20097F571 + (12:26:58, 13 December 2024)
- ML20097F567 + (12:26:59, 13 December 2024)
- ML20097F569 + (12:26:59, 13 December 2024)
- 05000440/LER-1992-013, :on 920514,turbine Stop Valves Opened Greater than 90% W/Main Steam Line Drain Valves Opened,Resulting in Drain Line Isolation on Low Condenser Vacuum.Caused by Inadequate Procedure.Work Order Revised + (12:27:01, 13 December 2024)
- ML20097F559 + (12:27:02, 13 December 2024)
- ML20097F548 + (12:27:03, 13 December 2024)
- ML20097F551 + (12:27:03, 13 December 2024)
- ML20097F543 + (12:27:05, 13 December 2024)
- ML20097F547 + (12:27:05, 13 December 2024)
- 05000313/LER-1992-005, :on 920519,steam Driven EFW Pump P-7A Was Inoperable.Caused by Improper Pump Setup & Inadequate Procedural Guidance.Efw Pump Maintenance Procedure Revised + (12:27:07, 13 December 2024)
- ML20097F541 + (12:27:08, 13 December 2024)
- HL-5105, Forwards Owners Data Rept for ISI Ei Hatch Nuclear Plant Unit 2 Sept-Nov 1995, Including Ultrasonic Exams of Austenitic Stainless Steel Piping Welds in Primary Coolant Pressure Boundary,Per GL 88-01 & NUREG-0313,Rev 2 + (12:27:09, 13 December 2024)
- BVY-92-070, Monthly Operating Rept for May 1992 for Vermont Yankee Nuclear Power Station + (12:27:11, 13 December 2024)
- ML20097F533 + (12:27:12, 13 December 2024)
- HL-2232, Certifies That All Elements of Reg Guide 5.66 Implemented to Satisfy Requirements of 10CFR73.56.Administrative Changes Relative to Compliance W/Requirements of Reg Guide 5.66 Encl.Encl Withheld (Ref 10CFR73.21) + (12:27:13, 13 December 2024)
- ML20097F529 + (12:27:14, 13 December 2024)
- ML20097F528 + (12:27:15, 13 December 2024)
- 05000321/LER-1992-012, :on 920517,output Breakers for B RPS Tripped & Caused Loss of Power to B Rps,Prms,Pcis & Other Systems. Cause of Event Not Determined.Protective Relay Circuitry Functionally Tested & Calibrated + (12:27:16, 13 December 2024)
- 05000265/LER-1992-010, :on 901015,reactor Scram Occurred Due to Turbine Stop Valve Closure.Modification of DG Autostart Logic Will Be Installed to Preclude Similar Starts of Dg + (12:27:19, 13 December 2024)
- ML20097F511 + (12:27:20, 13 December 2024)
- 3F0296-06, Responds to GL-95-07,180-day Response, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (12:27:23, 13 December 2024)
- 05000325/LER-1992-010, :on 920511,unexpected Start of 1B RHR Pump Instead of 1D Due to Personnel Error.Eight Similar Msts Have Been Incorporated Into Word Processing Software + (12:27:25, 13 December 2024)
- ML20097F503 + (12:27:26, 13 December 2024)
- ML20097F502 + (12:27:27, 13 December 2024)
- ML20097F501 + (12:27:28, 13 December 2024)
- ML20097F500 + (12:27:30, 13 December 2024)
- ML20097F495 + (12:27:31, 13 December 2024)
- RBG-42463, Forwards Facility FFD six-month Performance Data Rept for Period Jul-Dec 1995,per 10CFR26.71(d) + (12:27:31, 13 December 2024)
- ML20097F491 + (12:27:32, 13 December 2024)
- ML20097F481 + (12:27:33, 13 December 2024)
- ML20097F480 + (12:27:34, 13 December 2024)
- ML20097F477 + (12:27:34, 13 December 2024)
- ML20097F476 + (12:27:35, 13 December 2024)
- 1CAN069202, Informs of Completion of Initial Activities for GL 89-13 Re Svc Water Sys Problems Except for One Exception Involving Reactor Bldg Cooler Heat Transfer Testing Conducted During 1R10 + (12:27:36, 13 December 2024)
- ML20097F472 + (12:27:37, 13 December 2024)
- ML20097F469 + (12:27:38, 13 December 2024)
- ML20097F471 + (12:27:38, 13 December 2024)
- 05000327/LER-1984-052, :on 840817,during Review of Procedure SI-144.2, Control Room Emergency Ventilation Sys Test, Discovered That Incorrect Calculation of Duct Area Resulted in Both Trains of Sys Left Lower than Specs + (12:27:40, 13 December 2024)
- RC-96-0035, Application for Amend to License NPF-12,revising Testing Methodology Utilized by Facility to Determine Operability of Charcoal Filters in ESF Air Handling Units + (12:27:42, 13 December 2024)
- ML20097F464 + (12:27:42, 13 December 2024)
- ML20097F460 + (12:27:43, 13 December 2024)
- ML20097F459 + (12:27:44, 13 December 2024)
- 05000483/LER-1984-030, :on 840816,discovered That Average of Only Three Cooler Inlet Temps Taken,Violating Tech Specs.Caused by Operators Misinterpreting Tech Spec Requirements.Night Order Issued to Clarify Tech Spec Requirement + (12:27:46, 13 December 2024)
- ML20097F453 + (12:27:50, 13 December 2024)
- ML20097F446 + (12:27:51, 13 December 2024)