ML20097F551
| ML20097F551 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 05/31/1992 |
| From: | Kane G, Stewart W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 92-398, NUDOCS 9206150360 | |
| Download: ML20097F551 (13) | |
Text
-
__._.__..____,m e
6 YlltOINIA l$LI'CTitlO AND l'OW1'It ('OMi%NY Il lC ll >l O N I), YI IID IN I A Ull M U l Juno 10, 1992 U. S. Nuclear Regulatory Commission Serial No.
92 398 Attention: Document Control Desk NL&P/JMJ:Jmj Washington, D.C. 20555 Docket Nos.
50 338 50 339 License Nos. NPF 4 NPF 7 l
Gentlemen:
VIRGINIA' ELECTRIC AND POWER COMPANY-i tiORTH ANNA POWER STATION UNITS 1 AND 2 MQNTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 for the month of May 1992.
Very truly yours,
[
_ w(
o.
W. L.' Stewart s
Senior Vice President - Nuclear Enclosure cc:
U.S. Nuclear Regulatory Commission 101 Marietta Street, NW
. Suite 2900 Atlanta, GA 30323 4
Mr; M. S. Lesser NRC Senior Resident inspector North Anna Power Station 1
neuan 88%r gl g
4 VIRGINIA POWER COMPANY NORTH ANNA POWER ST.. TION HONTHLY OPERATING REPORT MONTH:
May.
YEAR 1992 Approved:
o
'rG G
Stt onldanager
Dr!2AflhG DATA RIPDRf DDCKE1 No.:
50 338 DL?!: June 1,1692 CONIACT: G. E. K ane PHOkt : (703) 894 2101 OPIR ATING $1 Atus 1.
Un i t N one s................................ h o r t h A nna 1 2.
R epor t i ng Per i od t.........................May 1992 3.
L i c ensed t he rnet Power (MWt ):.............
2,748 4.
Nameplate R at i ng (Gross MWe):.............
947 5.
Design tiectrical Rating (Net MWe):.......
907 6.
Maximan Ovpendable Capacity (Cross MWe)..
894 T.
Mentnus Dependable Capacity (Net MWe)....
848 8.
If changes occur in Capacity Ratings (Itens No. 3 thru ?!.ince Last report, give ressusas__N/A o
9.
Power level to which restricted, if any (Not MWe):,__N/A
- 10. Reasons for restrictions, if any N/A Thtm Month Yat D Cumulative
- 11. H ours i n R epor t i ng P e r i od................................
744.0 3, 64 7.0 122,219.0
- 12. Numt>er of Hours R eac t or was Cr i t i c 4l.....................
744.0 2,105.3 88,793.8
- 13. Reactor Reserve shutdown Hours...........................
0.0 1 *,,3 6,758.0
- 14. Hour s Gene r a t or 0n L i ne..................................
744.0 2,063.2 65,859.7
- 15. Unit Reserve Lhutdown Hours..............................
0.0 0.0 0.0
- 16. Gross T herme t E ner gy Genera t ed (MWW )..................... 2,041,639.3 5,571,074.0 228,523.B46.4
- 17. Gross E lect rical Energy Generat ed (MWH )..................
676,777.0 1,644,035.0 75,101,B82.0
- 18. N e t E l ec t r i cal E nergy Gene ra t ed (MWH )....................
642,631.0 1,750,101.0 71,104,718.0
- 19. Unit service Factor......................................
100.0%
57.3%
70.3%
- 20. Uni t Avai l abi l i t y f ac t or.................................
100.0%
57.3%
70.3%
- 21. Unit Capacity factor (using MDC het).....................
101.**
54.2%
65.0%
- 22. Unit Capacity Factor (using DER ket).....................
52.9%
64.1%
- 23. forced Outage Rate.......................................
0.0%
0.0%
12.0%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each)_None
- 25. If Shutdown at end of 8eport Period, estimated time of itartups h/ A__
- 26. Units in Test status (Prior to Commerclat operation):
forecast Achieved INiilAL CR111CALITY INITIAL ELECTRICITY Co*ERCIAL OPERAtl0N
e 4
6 AVERAGE DAILY UNAT POWER LEVEL Docket No.:
50-338 Unit NA-1 Date June 14 1992
Contact:
G.
E.
Kano Phones (703) 894-2101 MONTH:
May 1992__
DAY AVERAGE DAILY POWER DAY AVERAGE DAILY LEVEL LEVEL (MWe-Net)
LEVEL (MWe-Net) 1 867 17 864 2
867 18 864 3
866 19 865 4
866 20 866 5
867 21 866 6
367 22 866 7
867 23 865 8
860 24 663 9
E67 25 862 10 867 26 864 11 868 27 863 12 867 28 863 13 868 29 864 i
14 867 30 e65 15 868 31 864 16 867 Instructions:
on this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
UNIT SHUTDOWNS AND POWER REDUCTIONS i
DOCKET NO.:
50-338 I
UNIT NAME:
NA-1 DATE: June 1, 1992 REPORT MONTH: May 1992 CONTACT:
G.
E. Kane PHONE: (703) 894-2101 1
2 3
4 5
No.
Date Type Duration Reason Method of Licensee Systen Component Cause & Corrective (hrs)
Shutting Event Code Code Action to Down Reactor Report #
Prevent Recurrence cNo entry this month.
k 1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-Ol61)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain)
Exhibit H - Same Source
l 4
Page 1
o f,_1 UNIT altUTDOWN AND POWER REDUCTIONS Eltplanatior! Dhoot Docket No.:
50-338 L
Report Month [ity Unit Name NA-1 Yeart 1992 Dato June 1.
1992 Contactt G.
E.
Kane
- No entry this month.
t
---~_-s-.-_-
NORTH ANNA POWER STATION UNIT NO.I 1
MONTH May 1
DUMMARY OF OPERATING EXPEBIEJiQ4 Page 1 of 1 Listed below in chronological sequence le a
summary of operating experiences for this month which rtiquired load reductions or rrsuited in significant non-load related incidents.
D.819 T11Mt Data May 01, 1992 0000 Began mo en with unit at 951, power, 909MWo.
May 08, 1992 1000 Commenced unit ramp-down for TVTT.
1130 TVFT' completed satisfactorily.
1225 Commenced unit ramp-up to 95% power.
1324 Unit stable at 95% power, 906MWo.
May 31, 1992 2400 Ended month with unit at 95% power, 910MWo.
4 OPERAllCG DotA REPORT DOCctI Wo.:
50 33P i
DAlt June 1, 1992 l
CONIACT: G. t. Kane PHONil (703) 894 2101 OPERAllNG STATUS l
i
- 1. : Uni t N ame s................................N o r t h Anna 2 l
2.
R epor t ing Per i ods.........................May 1992 1
3.
L icensed Thermal Power (MWt ).............
2893 4.
Nameplate R at ing (Cross NWell.............
947
- 5.. Deslan tiectrical Rating (Wet MWe).......
907
- 6. Ca 'u Deperdable Capacity (Cross MWe):..
957 wa Depenbble Capacity (Net MWe)s....
909 7
8.
If changes occur in Capacity Astings (ltems No. 3 thru 7) stree lost report, glve reasons:
N/A
~
9.
Power level to which restricted, if any (Wet MWe):,,,,,,N / A
- 10. Reasons for restrictions, if any:
N/A This korah Yat D Cuwt ative
- 11. Hour s i n R epor t i ng Per i od......................... '.......
744.0 3,647.0 100,487.0
- 12. Nueer of Houra R eac t or was Cr i t i c al.....................
687.9 2,193.9 81.929.8
- 13. Reac t or R eserve thutdown Hours...........................
56.1 164.9 6,222.3 to. Hours Cenorator 0n Line..................................
683.2 2,143.9 80,918.3
- 15. Uni t Reserve shut down Hours..............................
0.0 0.0 0.0
- 16. Cross Thermal Ener gy Gener a t ed (it.IH )..................... 1,949,702.7 5,634,758.2 217,451,891.3 1P. Gc oss E lec trical Energy Generated (MWM)..................
643,876.0 1,846,234.0 71,226,360.0
- 18. N et E lec t ri cal Ener gy Genera t ed (MWH )....................
611.855.0 1.749,477.0 68,249,210.0
- 19. Unit Service factor......................................
91.8%
58.8%
80.5%
- 20. Unit Avaltability Factor.................................
91.8%
58.8%
80.5%
- 21. Unit Capacity Factor (using MDC Net).....................
90.5%
$2.8%
75.4%
- 22. Uni t Capac i ty F ac t or (us i ng DE R Ne t ).....................
90.7%
52.9%
74.9%
- 23. Forced outage Rate.......................................
0.0%
1.2%
5 74 j
- 24. Shutdowns Scheduled Over Next 6 Months (*ype, Date, and Duration of Each):_W/A
- 25. If Shutdown at end of Report Period, estimated time of Startup:
N/A 26.' Units In Test status (Prior to Ccmaercial operation):
l Forecast Achieved 1NITIAL CRiflCAlliY INITIAL ELECTRICITY CCMMERCI AL OPikAflON l
[.
~,_ _ _ _ _,
.~
.
- i c
. ' ~f' i AV'ERAGE DAILY UNIT POWER' LEVEL Docket No.:
50-339 Unitt' NA-2
- Datet, June-1, 1992 Conts. tut t G.
E. Kand Phones (703) 894-2101 MONTH:
May 1992
, DAY AVERP.GE-DAILY POWER' DAY AVERAGE DAILY LEVEL LEVEL ~(MWe-Net)
LEVEL (MWe-Nat) l' 909' 17 909 2
908-=
18 910 3
908~
19 910 4:
909 20 910 5
911-21 910 6
912 22 893
'I 912 23 26 8
913 24
-0 9-914 25 69 10 913 26 854 11 910 27 909
- 12 '
912 28 908
-131 910-
.29 908
~14:
909' 30 907
-15 910 31 902
- . s.
16.'
910:
r Instructions-on'this-format,clist the average daily unit power' level in MWe-Notifor each: day ~.in the-reporting-month.
Compute to the nearest whole megawatt.
n l-d
's
~
UNIT SHUTDOWNS AIC POWER REDUCTIONS h.
DOCKET NO.:
50-339 UNIT NAME:
NA-2 DATE: June 1, 1992 REPORT MONTH: May 1992 CONTACT:
G.
E. Kane PHONE: (703) 894-2101 l
l l
1 1
2 3
4 5
! Mo.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)
Shutting Event Code Code Action to Down Reactor Report /
Prevent Recurrence 92-04 920523 S
60.8 B
1 N/A TD N/A Planned outage for Lube Oil System Maintenance.
s.
Method 4:
1: Type 2: Reason F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions 2= Manual Scram for preparation of Data S= Scheduled B= Maintenance or Test 3= Automatic Scram Entry Sheets for Licensee C= Refueling D= Regulatory Ret i.ction 4= Continuations Event Report (LER) File E= Operator Traini.,g E License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other 5:
G= Operational Error Exhibit H - Same Source H=Other (explain) l
? age 1
of _,_2 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:
50-339 Report Month tiny Unit Name NA-2 Yeart 1992 Date: June 1.
1992
Contact:
G.
E.
Kane
- 92-04 May 22, 1992 Commenced unit ramp-down at 0.3%/ min for planned ibin Turbine Lube Oil System maintenance outage.
May 23, 1992 Main Generator off-line and unit entered Mode 2 at 0235 hours0.00272 days <br />0.0653 hours <br />3.885582e-4 weeks <br />8.94175e-5 months <br />.
Unit entered Mode 3 at 0314 hours0.00363 days <br />0.0872 hours <br />5.191799e-4 weeks <br />1.19477e-4 months <br />.
May 25, 1992 Unit entered Mode 2 at 1116 hours0.0129 days <br />0.31 hours <br />0.00185 weeks <br />4.24638e-4 months <br />.
Unit entered Mode 1 at 1430 hours0.0166 days <br />0.397 hours <br />0.00236 weeks <br />5.44115e-4 months <br />.
Main Generator on-line at 1524 hours0.0176 days <br />0.423 hours <br />0.00252 weeks <br />5.79882e-4 months <br />.
Unit stable at approximately 30% power for Chemistry hold at 1625 hours0.0188 days <br />0.451 hours <br />0.00269 weeks <br />6.183125e-4 months <br />.
Commenced unit ramp-up to full power at 2320 hours0.0269 days <br />0.644 hours <br />0.00384 weeks <br />8.8276e-4 months <br />.
May 26, 1992 Unit stable at 99.2% power with all turbine valves full open at 0515 hours0.00596 days <br />0.143 hours <br />8.515212e-4 weeks <br />1.959575e-4 months <br />. Commenced throttling open the bypass valves for the first point Feedwater heaters to reach 100% power at 1707 hours0.0198 days <br />0.474 hours <br />0.00282 weeks <br />6.495135e-4 months <br />.
Unit stable at 100% power with first point Feedwater heater bypass valves partially open at 1759 hours0.0204 days <br />0.489 hours <br />0.00291 weeks <br />6.692995e-4 months <br />.
NORTH ANNA POWER STATION UNIT NO.:
2 MONTH May
SUMMARY
OF CPERATING EXPERIENCE Page 1 of 2 Listed below in chronological sequence is a
summary of operating experiences for this month which requirLJ load reductions or resulted in significant non-load related incidents.
Date Time Data May 01, 1992 0000 Began month with unit at 99% power, 949MWe.
May 07, 1992 1500 Commenced throttling open the bypass valves for the first point Feedwater heaters in order to reach 100%
power.
1630 Unit stable at 100% power, 959MWe, with first point Feedwater heater bypass val' ras partially open.
May 11, 1992 1420 Decreasing MWe and Main Condenser vacuum.
Entered appropriate Abnormal Operating procedure.
Reduced power to 95% power.
1546 Commenced unit ramp-up to 100%
power.
1630 Unit stable at 100% power, 955MWo.
May 22, 1992 2148 Commenced unit ramp-down at 0.3%/ min for planned Main Turbine Lube oil system maintenance outage.
May 23, 1992 0235 Main Generator off-line.
Unit entered Mode 2.
0314 Unit entered Mode 3.
May 25, 1992 1116 Unit entered Mode 2.
1430 Unit entered Mode 1.
1524 Main Generator on-line.
1625 Unit stable at approximately 30%
power for Chemistry hold.
2320 Commenced unit ramp-up to full power.
NORTH ANNA PODER STATION UNIT NO.
2 MONTH:
May HUMMARY OF OPERATING EXPERIE][QE Page 2 of 2 May 26, 1992 0515 Unit stable at 99.2% power, 909MWe, with all Turbine valves full open.
1707 Commenced throttling open the bypass valves for the first point Feedwater heaters in order to reach 100%
power.
1759 Unit stable at 100% power, 952MWe, with first point Feedwater heater bypass valves partially open.
May 31, 1992 2400 Ended month with unit at 100% power,
- 954MWe,