ML20097F591
| ML20097F591 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 05/31/1992 |
| From: | Bailey J, Mike Williams WOLF CREEK NUCLEAR OPERATING CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NO-92-0165, NO-92-165, NUDOCS 9206150387 | |
| Download: ML20097F591 (7) | |
Text
__ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ -
Wt9LF CREEK
~
NUCLEAR OPERATING CORPORATION John A Badey vice Presioent Operat40ns June 11, 1992 NO 92-0165 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station PI-137 Washington. D. C.
20$55
Subject:
. Docket No. 50-482:
May, 1992. Monthly Operating Report Gentlemen:
Attached is the Ma 1992 Monthly Operating Report for Wolf Creek Generating Station. y.This sutunittal is being made in accordance with the requirements of Technical Specification 6.9.1.8.
Very truly yours.
1
% -,![},,z [
(U
~./
j John A. Bailey
- Vice President Operations JABlaem Attachment cci A. T. Howell (NRC), w/a R. D. Martin (NRC), w/a G. A. Pick (NRC), w/a
.W. D. Reckley (NRC), w/a I
f i
[p 9206150387 920531
/
n PDR ADOCK 05000482 1 Box 411/ Bu% ton. KS 66839 / Phone: (316) 364 P831
/
p, R
PDR u gau,g,.on,, empioy,, u rucivt1
-k
Attochmen.t to NO 9,3-0165 4
WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION a
LNTHLY. OPERATING REPORT
'l HONTH:
Hav YEAR:
1992 lacket No.:
50-482:
Facility Operating License No.:
HPF-42 Report No.
87 Prepared by -
Merlin G.: Williams.
m____
m
Attachment to NO 92-0165
+
SLWiARY The following report highlights the operating experience of Wolf Creek Generating St.ation f or the month of Hay.1992.
This report is being provided pursuant to Technical Specification 6.9.1.8.
1.
SUMMARY
OF OPERATING EXPERIENCE The unit operated at or near 100% power throughout the month of May.
II.
MAJOR SAFETY RELATED MAINfENANCE ACTIVITIES No major safety related maintenance activities were performed during the month of May.
Wolf Creek' Generating Station j
Monthly.0perating' Report May 1992 Page 1.of 5 hs
.ui
' i
- -. - -.. -. - - _ _ _. _ _ _. -. -. _ - -. -. - ~.... _ -. _.
, Attachment to NO 92 0165 OPERATING DATA REPORT DOCKET NO.
50-482 I
WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION l
DATE 06-03-92 l
COMPLETED BY M. Williams i
TELEPHONE 316-364-8831 j
OPERATING STATUS l
1.
Reporting Period:
May. 1992 Gross Hours in Reporting Period 744 I
2.
Currently Authorized Power Level (MWt) 14R Max.' Depend. Capacity (MWe-Net): 1131 Design Electrical Rating (MWe-Net):
1170 F
3.
Power Level to Which Restricted (if Any)(MWe-Net)s N/A
{
4.
Reasons for restriction (If.Any):
N/A i
This Month Yr. to Date Cumulative 5.
.iumber of Hours' Reactor was Critical
'744.0 2.501.1 46.191.'2 6.
Reactor Reserve Shutdown Hours 0.0 0.0 339.8 7.
Hours Generator on Line 744.0 45.545.8
~
2.433.5 f
8.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 i
9.
Gross Thermal Energy Generated (HWH) 2.534.299 8.095.621.148.189.212 j
t 10.
Gross Electrical Energy Generated'(MWH) 887.122 2.825.820 51.539.326
.11.
Het Electrical Energy Generated (HWH) 853.065 2.672.618 49.128.089 l
12.
Reactor Service Factor 100.0 68.6 78.1 l
13.
Reactor Availability Factor 100.0 68.6 78.7 14.- Unit Service Factor 100.0,,
66.7 77.1 3
15.
Unit Availability Factor-
. J.O.0io 66.7 77.1 i
10.
Unit Capacity Factor (Using MDC) 101.4 64.8 73.5' l-17.
Unit Capacity Factor (Using Design MWe) 98.0 62.6' 71.0~
-18.
Unit Forced-Outage Rate.
0.0 33,3-
'7. 0 '
19.
Shutdowns; Scheduled over Next 6 Months (Type, Date, and Duration of each) - N/A-20.
If Shut Down at_End_of Report Period. Estimated Date of Startupt-N/A-Wolf Creek' Generating Station Monthly _ Operating Report May 1992 Page 2 of 5
,Atta6hment to NO 92-0165 AVERAGE DAILY UNIT POWER LEVEL DOCKET No.
50-402 VOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 06-03-92 COMPLETED BY_M. Williams TELEP110NE 316-364-8831-MONTH May. 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL-(HWe-Net)
(MWe-Het) 1 1148 17 1146 2
1148 18 1146-3 1149 19 1143 4
1146-20 1143 5
1147 21 1146 6
1148 22 1144 7
1148 23 1146 8
1149 24-1147 9
1147 25
-1147 10 1145 26 1148 11 1145 27 1149 12 1144 28 1149-13 1147 29
_,1 lib -
14 1147 1140' 15 1147 31 1148
'16 1146 Wolf Creek Generating-Station Monthly Operating l Report--
May 1992 Page-3 of 5 l-1
Attachment to NO 92-0165 UNIT SHUTDOWN AND PO* DER REDUCTIONS DOCKET NO 50 482 40LF CREEK GENERATING STATICN WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 06-03-92 COMPLETED BY M. William TELEPHONE 316-364-8831 REPORT MONTH May. 1992 TYPE METHODS SHUTTING F: FORCED DURiiTION REASON DOWN THE REACTOR CORRECTIVE ACTIONS / cot 9ENTS No Date S: SCHEDULED JHOURS)
(1)
OR REDUCING POWERf2)
I SUttfARY: The unit operated at or near 1001 power throughout the month.
- 1) REASON: A: EQUIPMENT TAILL?E (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:
1.
MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2.
MANUAL SCPAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3.
AUTCMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXP.,AIN) 4.
CONTI!CED 5.
REDUCED LOAD 3.
OTHER Wolf Creek Generating Station Monthly Operating Report May 1992 Page 4 of 5
l-t i
l e
Att,a'hment to NO 92-0165 c
j WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION UNIT NO. 1 MONTH May. 1992 j
P
SUMMARY
OF OPERATING EXPERIENCE I
i l
Listed below in chronological sequence is a summary of operating experiences for this month which required load reduction or resulted in significant non-load related incidents.
DATE Iltjg IVENT i
May 1, 1992 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Unit at 100! power.
May 31, 1992 2400. hours Unit at 100% power.
l r
l.
I I
l l
l l.
i 2
Wolf Cceek Generating Station Monthly Operating Report May 1992 Page 5 ofL5.-
i
.. e,. _, _. _.. _, -
, ~....,...,.,._J~
,-.-......,,.._m..,...,.m.
..,J-,_,
.....,.1.~m..,_.~s
..,.....ms..-.-.