4 6
e GPU Nuclear Corporation
[
One Upper Pond Road Parsippany, New Jertey 07054 201 316-7000 TELEX 136-482 Writers Direct Dial Nurnber June 5, 1992 C000-92-1794 C321-92-2152 e
U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Gentlemen:
Subject:
Oyster Creek Nuclear Generating Station (0CNGS)
Docket No. 50-219 Integrated Schedule Project List Semi-Annual Update Pursuant to condition 2.C.(10) of Operating License DPR-16, GPU Nuclear has implemented the Long Range Planning Program for DCNGS, As required'by Section V.A of the Plan, the following attachments are submitted to provide the semi-annual project list update:
1.
Attachment A contains a new project list of Category A, B and C projects, annotated by an asterisk (*) to identify new projects.
Completed projects have been removed from the
- Sedule listing. Also noted by a double asterisk (**) are budget activity numbering changes.
2.
-Attachment B contains a-summary of Category A, B, and C projects which have been completed, deleted, deferred, changed in scope. Category A and B projects which have.had schedule changes are provided with explanations, as appropriate.
1 C.C C 0
)
g6150314920605 l
p ADOCK 05000219
((
PDR GPU Nuclear Corporation is a subsidiary of General Public Utilities Corporation
C321-92-2152 Page 2 five (5) Ca+egory B project changes are discussed in Attachment B, including:
one (1) deletion; two (2) schedule changes; and, two (2) activity changes (scope reduction consideration, and funding idehtification).
Pursuant to tha LRPP for Oyster Creek, it will be assumed that you are in agreement with the above Category B changes if you do not respond to this cubmittal within 15 days of receipt.
Sincerely, k
't R. L. Long Vice President and Director Corporate Services /1MI-2 1
cc: Directo., i)roject Directorate 1-4 Oysti.e Creek NRC Project Manager Region 1 Administrator Senior NRC Resident inspector, OCNGS 2
9
'4 e
O E.. A.
PROJECT LISTING INTEGRATED SCHEDULE SENIANNUAL UPDATE (JUNE 1992) h
'~
c
..---..__--x
l i
o OYSTER C R E E Ct PROJECT L i STING LEGEND
~
NRC I NTEGRATED SCHEDULE
'fEW PROJECTS.
.,BA NUMBER CHANGE CATEGORY
'A' PROJECTS STATUS AS OF 04Jt,M2 SORT BY CATECORY/ CYCLE /BA" 085.
BA DESCRIPTION CYCLE /
CLASSIFICATION YEARS NUMBER
'1 402965'
, STAT ION ' BLACKOUT MOD I F I "AT IONS IttR NRR YARD TB 4160 INSTALL A POWER SUPPL Y TIE BETW.EN THE COMBUSTION TURBINES A ND OCNGS TO MEET 10 CFR 50.63
.2 402011
. REPLICA SIMULATOR % RTIFICATION-92 NRR YARD NRC EXEMPTION CRANTED ON 4/10/92 TO ALLOW COMPLETION OF THE SIMULATOR
,. CERTIFICATION TESTING BY 12/31/92.
L 6-
.a__--
g
e e
OYSTER CREEK PROJCCT L iSTI QG LEGEND NRC 1 NTEGRATED SCHEDULE
=
NEW PROJECTS.
BA NUMBER CHANGE CATECORY
'B' PROJECTS STATUS AS OF 04JUN92
.__'l CATEGORY / CYCLE /BA
-SORT B
- OBS BA DESCRIPTION CYCLE /
CLASSIFICATION YEARS NUMBER-
=,.
13 NRR 3 315302 SEP TOPIC til-1 INCORPORATE RESULTS IN AN UPDATE TO THE FSAR.
14 ExR 4 402944 RX BLDG ROOF FRAME
-119 ADD BRACING TO THE R B ROOF STRUCTURE TO ENSURE ROOF STABILITY UNDER HIGH WIND LOADS. NRC SEP 5 408116 ACCESS CONTROL UPGRADE _ CONTROL ROOM 14 NRR PROCUREMENT & INSTALLATION Or KEY CARD READER UNITS W/ ALARM FOR CONTROL ROOM
-AND NEW CABLE SPREAD ROOM.
I'.
6 326216 RX VESSEL BELTLINE INSPECTION 14R NRR 119
, PERFORM MEASUREMENTS TO DETERMINE WHAT L
f EQUIPMENT WILL BE REQUIRED AND WHAT l
' WELDS ARE ACCESSIBLE FOR U.T.
7 328307~
RCS AUG - ICSCC INSPECTION _ 14R 14R MRR DV RBT5 RB95-'
INSPECT PIPING WELDS PER NUREG 0313 REY 2 14R NRR 8 402888 RPV CAPSULE #2-119'
'NSTALL CAPSULE #2 IN REACTOR VESSEL, NUREG 0822.-
9' 402894
'O.C. DELETION OF CONTAINP:ENT SPRAY AUTO' 14R NRR 480V CR-
. REPLACE C.S. MODE SVITCH W/TWO KEY-.
LOCKED SWITCHES, LOCAL WIRING CHANGES.-
PREVENT SYSTEM AUTO-START.
r gi 'g i ggi
t I
o g
n i4'al j
B Q
84'! !
-I5 l 4
E i
h t,
n 5
d
=
o.
Rl
'b "1
a.
3o!
~
L tbe.
w 41 5 5
5 5
5 z
r, p
o
,1 I
- ?
?
a w
{
,1 l
t o!
N wl o
"l E
"l
<4 ol w
a w
w; g
M g
d e
"d.
E 9 ".
W W.
E r
w 3
i R *R a
E UE#
d 5e'
=,
ou l
ss ea oss e
"s5 m
L DE 8 5e j
der zy.
= gd5 g To w
a 5"
d t?
E" W-e 35 - Se 55 W R>uJ W 90 g
e m*g ateig8t "_w,. g.
V' E<
e.
?
t
.a a w --
<a e e*t-
=
85 se e zw5 n
s c_ e -=
gy 1 a s.s *w e
a 8r" ma
=
w.
- wrx
,g-..e=e a
ie
- as 3
e e,g 3e.
n est
.s-e e-2 w gm si es e
e v.
mg m
5 1 but #
5% *
- E-8 555' E E5 d w9
^
o
" d8y w 5!
1 5"**E 15 l $ e.:.a ja rajd 35 Sero e a"* g. at B.5ew 5-e-la m a 5a.m.
o 455 - 5"g.E' dEE ge IE"E E
W5J W"$"E*'
- EE e5 wig >vsse=.sakg E*
<g:
o 35dW g
- "r
. <3d gE 9 g
W 8wg o r
..g=,
g' n
-tm ag s m
- a c) a wa s
5..
a n n.sw a es o.
eo e
M5 a[
"a e
5<
6;st' 5? E A
3
-R S
2
'g-94
" "~
R R
R R
D-8 w'
B
.E.
2 2-2 S
2 4
4-s.
N' N
h.
h r=
l l
0.Y S T E R CREEK PROJECT LiSTI NG LEGEND
~~~~~~
NRC 1NTEGRATED SCHEDULE NEW PROJECTS.
- BA NUMBER CHANGE
- e CATEGORY
'B' PROJECTS STATUS AS OF 04JUN92 SORT BY CATEGORY / CYCLE /BA OBS BA DESCRIPTION CYCLE /
CLASSIFICATION YEARS NUMBER 17 328AFR RCS AUG - ICSCC INSPECTION-15R 15R NRR DW RB75 RB95 INSPECT PlPING WELDS PER G.L. 88-01 AND MUREG 0313 REV.2
.18 328030 CNTL RM HUMAN FACTORS DESGN REVIEW 15R NRP
.CR' REPAINT, REFURBISH & RELABEL CR PANELS 1R THRU 10R,6XR,11XR,12R,12XR 14sa,14XR, 16R AND 11F,9XR&11R.NUREG 0737 SUP 1.
19 328280 RCS STRESS IMPROVEMENT-15R NRK DW.RB23 PERFORM STRESS IMPROVEFINT ON SELECTED STAINLESS STEEL PIPING WELDS IN RCS SYS.
20 402AGO REG GUIDE.1.97 iNSTRUMENTATIOM 15R NRR CR REPLACE / INSTALL RX WATER LEVEL FUEL ZONE-RECORDERS AND PROVIDE POWER SUPPLIES AND NEW POWER DISTR. SYSTEM PER RG 1.97 21 402900 ISO CONDENSER PIPING MODS 15R NRR RB PERFORM STRESS IMPROVEMENT OF.THE ISO CONDENSER NEW NG P1PIMG INSTALLED-IN'13R..
22 402910 C R RECORDERS 15R NRR CR
' REMOVE AND REPLACE 10 DEFICIENT / OBSOLETE RECORDERS - REDUCE OPERATOR ERROR.
NUREG 0737 $UPP. 1
. 23. 402974
.OC RX OVERFILL' PROTECTION SYSTEM TSR NRR
' CR -
MODIFICATIONS TO FW REGULATING VALVES -
l-AND FW PUNP B TRIP CIRCUlTRY.
MRC GEN. LETTER 89-19' I'
OYSTER C R E E C1 PROJECT L iSTI NG LEGEND-NRC 8 NTEGRATED SCHEDULE NEW PROJECTS.
- - = - - -
BA NUMBER CHANGE CATECORY
'B' PROJECTS STATUS AS OF 04JUN92 SORT BY CATEGORY / CYCLE /BA
- - -. = - - - -...
OBS BA DESCRIPTION CYCLE /
CLASSIFICATION YEARS NUMBER 24 408116
. ACCESS CONTROL UPGRADE - REACTOR BLDG.
16 NRR PROCUREMENT ar INSTALLATION OF KEY CARD READER UNITS W/ ALARM FOR SELECTED VITAL AREAS IN THE REACTOR BUILDING.
25 328LO6 RCS AUG-IGSCC INSPECTION-16R 16R NRR RB
'DW INSPECT PIPING WELDS PER NUREG 0313 REV2 I
26 402959' O. C..PROBABILISTIC RISK ASSESSMENT-IPE 87-92 NRR PERFORM A PRA AND PROVIDE RESPONSE TO.
NRC G.L. 88-20, INDIVIDUAL PLANT EXAM INATION BY 9-1-92..
27 328205 SQUG SUPPORT & PARTICIPATION - BWROG 87-93 MRR PARTICIPATION IC SEISMIC QUALIFICATION UT IL I TY -'. GROUP TOR-EQUdP SEISMIC QUA-LIFICATION. UNRESOLVED SAFETY-ISSUE.-
28,402011 OC REPLICA SIMULATOR 87-93 NRR DESIGN, FABRICATE, IMSTALL A SIMULATOR DUPL6CATING THE OC CONTROL RM FUNCTIONS
.(GPUN LETTER C321-91-2293).
.29 328226 SQUG PROGRAM IMPLEMENTATION 87-95 NRR ESTABLISH SEISMIC QUALIFICATION FOR OYSTER CREEK. SCOPE INCLUDES WALKDOWNS IN OUTAGE 15R AND EVALUATIONS..
30 328295 EROSION /CORRCSION PROGRAM 90-92 MRR ESTABLISH A LONG-TERM CORP. PROCPJut TO i
' MONITOR EROSION / CORROSION PRIOR TO 14R OUTAGE..NRC GL 89-08
OYSTER CREEK PROJECT LIST l-18 C LEGEND NRC 1 NTEGRATED SCHEDULE NEW PROJECTS.
- BA NUMBER CHANGE CATEGORY
'B' PROJECTS STATUS AS OF 04JVM92 SORT BY CATEGORY / CYCLE /BA OBS
... BA
.. DESCRIPTION CYCLE /-
CLASStF# CATION YEARS tGMBCR
-n 90-94 NRR
- 31. 328312
.MOV PROGRAM DES 1GM BASIS REV3EW, STRESS ANALYSIS AND-TESTING OF MOV'S IDENTIFIED BY THE PROGRAM PER NRC GL 89-10.
I I
i l
j ;-
l
+
,~
o OVSTER CREEK PROJECT L ISTiQG LEGEND NRC I NTEGRATED SCHEDULE
=-=--
.NEW PROJECTS.-
BA NUMBER CHANGE CATEGORY
'C' PROJECTS STATUS As OF 04JU%92 SORT BY. CATEGORY / CYCLE /BA
......... - - - - - - - =
CLASSIFICATION OBS BA DESCRIPTlCN CYCLE /
YEARS NUMBER i
l VALVE MAINTENANCE & OVERHAUL-3/13U/14R 13 MRC 32 323624 TB-DW-RB CORRECTIVE & PREDICTIVE MAINTENANCE OF SELECTED VALVES.
33 -32363T CHECK VALVE MO'.lTORINC/INSP. PROGRAM 13 REL RB TB
'OPEN AND INSPECT CHECK VALVES THAT EXHIBIT OPERATIONAL PROBLEMS.
.INPO-SOER 86-03 13 MRC 323638 SPENT FUEL POOL CLEANUP 119
' REMOVE AND DISPOSE Of IRRADIATED 1 HARDWARE AND SILT-13 NRR I
35.;326213 OUTAGE ~lSI
-DW RB.
TB iNTPECT HANGERS, PIPING WELDS,'&
COMPONENTS TO SATISFY SECTION XI REQUIREMENTS APPROX.'25 INSPECTIONS 36 402823 GROUNDING & LIGHTNING PROTECTION.
INSTALL GROUNDING FOR THE MORTH CUARD HOUSE, MAIN CUARD HCUSE, LARGE STORAGE TANKS, MAINT. BUILDING, AND WAREHOUSE.
37 h02898 REPL UPPER TB & OLD MACHINE SHOP ROOr 13 MRC
- YARD REPLACE,THE OLD MACHINE SHOP ROOF.
13 RAD -
L38 402914 ALARA' PROGRAM TB INSTALL.JO BACKWASH SYSTEM CONDENSATE DEMINERALIZERS
~
k.
OY. STER CREEK PROJECT L, 8 $T INC
=.
LEGEND' NRC I NTECR# TED 5CHEDULE
- - - - - - - - - = - - = = - - - - - - -
NEW PROJECTS.
- BA NUMBER CHANGE CATEGORY 'C' PROJECTS STATUS AS OF 04JUN92 SORT BY CATECORY/ CYCLE /BA OBS BA' DESCRIPTION CYCLE /
CLASSIFICATION l
YEARS
)-
NUMBER
-.........------..-----_-.==
I 39 4029 0 DRYWELL' CORROSION i)NTROL T3' REL
'DW TOR RB23 REMOVE THE SAND FROM THE SANDBED REClON i
j 40.408838 SPENT' FUEL POOL CLEANUP 13 HRC 119~
REMOVE AND DISPOSE OF IRRADI ATED HtRDWARE IN THE SFP. IE CRB'S,LPRM'S I.
FUEL CHANNELS ETC.
'13U MRC VALVE MAINTENANCE & OVERHAUL-13/13U/14R 41 323624 LTB DW
- RB CORRECTIVE & PREDICTIVE MAINTENANCE OF SELECTED VALVES.
42 323637 CHECK VALVE MONITORING /INSP. PROCRAM 13U REL RB TB
~OPEN AND INSPECT CHECK VALVES THAT EXHIBIT OPERATIONAL PROBLEMS.
INPO-SOER 86-03 CONTAINMENT ISOLATION VALVE MAINT.
13U NRR 43 323648 '*
-REFURBISH CONT.lSO VALVES' IDENTIFIED BY LLRT'S.
-R4 '4029 0 DRYWELL CORROSION. CONTROL 13U MRC DW
.RB REMOVE SHEETMETAL'AROUND TORUS.
43-408836 VALVE REPLACEMENT-13U REL RB-. TB REPLACE. SELECTED VALVES IDENTIFIED AS HAVING MAJOR DEFICIE.NCIES
a OYSTER CREEK PROJECT LIST I NG
.... _ - - - - - _ =... - - _........ -
--._-=-----
LEGEND NRC i NTEGRATED SCHEDULE
-=.-==--
== -
.NEW PROJECTS.
- - BA NUMBER CHANGE CATEGORY 'C' PROJECTS STATUS AS OF G4JUN92
.......'3Y CATEGORY / CYCLE /BA
- = _ - - - - -........ _ - - - - - _ -. -
SORl
_=------ -.....--.
C3S BA DESCRIPTION-CYCLE /
CLASSIFIOATION YEARS NUMBER' g.
-- ---==_ --.
.--.........=-
GROUNDING & LIGHTNING PROTECTION 14 ISM 46 '402823 -
- YARD TB INSTALL LIGHTNING PROTECTION FOR PLANT STACK AND TURBINE BUILDING i
i 14 MRC 47 402898 REPL UPPER TB & OLD MACHINE SHOP ROOe i
' YARD REPLACE THE UPPER TURBINE BUILDING ROOF.
~
'D.W. SCAFFOLD & INSULATION 14R GWC 48 322036 l
DW-INSTALL SCAFFOLD IN D.W. TO SUPPORT ALL ACTIVITIES. REMOVE AND REINSTALL D.W.
INSULATION. REMOVE SCAFFOLD 49 323624 VALVE MAINTENANCE k OVERHAUL-13/13U/14R 14R MRC
.CORRFCTI /E & PREDICTIVE MAINTENANCE "
.OF S uECrED VALVES.'
14R MRC
.50 323629 CRD HCU NDULE REBUILD-14R
- RB23 REBUILD 35 CRD NYDRAULIC CONTROt. UNITS' 51 323637 CHECK VALVE MONITOR 1NG/INSP. PROGRAM 14R REL RB TB OPEN AND INSPECT CHECK VALVES THAT EXHIBIT OPERATIOMAL PROBLEMS.
IMPO-SOER 86-03 52' 323646-TURBINE-GENEfrATOR SYSTEMS INSPECTION-14R 14R-MRC TB INSPECTION OF THE' TURBINE, GENERATOR, LAND ASSOCIATED SYSTEM COMPONENTS AND VALVES DURING 14R
a OYSTER C R E E' 5 PROJECT L I STI NG l
LEGEND NRC I NTEGRATED
$CHEDULE
- = - - - -.. =
NEW PROJECTS.
- .BA NUMBER CHANGE CATEGORY
'C' PROJECTS STATUS AS OF OkJUN92 SORT BY CATEGORY / CYCLE /BA
= - -
_ - = - -
OBS BA DESCRIPT1ON CYCLE /.
CLAESIFiCATION YEARS NUMBER
--... -...=-
53 323648 LONT ISOLATION VALVE MAINT-14R 14R NRR RB DW REFURBISH CONT ISO VALVES IDENTIFIED BY LLRT'S &lLRT'S. APPROX 15 VALVES 14R.
ORR 54 323651 AS8ESTOS ABATEMENT-14R
'TB RB ret *OV,L/ REPLACEMENT OF ASBESTOS LACCING MATERSALS. OSHA CFR 1910.1001 55 323659 REFUEL FLOOR-RX DISASSEMBLY / REASSEMBLY 14R MRC 119 TASKS ASSOCIATED WITH RX DISASSEMBLY AhV REASSEMBLY, AND SUPPORTING ACTIVITIES 14R NRR S6 3E6213.
OUTAGE ISt-14R RB' DW TB-INSPECT' HANGERS, P1P1NG WELDS,
& COMPONENTS TO SATISFY SECTION XI REQUIREMENTS APPROX 264 INSPECTIONS l
14R ISM PIPE WALL THINNING-14R
.57 328295-REMOVE INSULATION, PREP SURFACES & PERFORM UT ON SELECTED PIPING SYSTEMS. POSSIBLE-l' REPLACEMENT OF FITTINGS / PIPING.CL 89-08 14R MRC SG 328308 RCS PIPING REPAIR CONTINGENCY DW CONTINGENCY FOR IGSCC FINDINGS.
ASSUMES CNE 6" OVERLAY IN RVCU AND
..lNSP 0F 9 ADD'L WELDS.
14R NRR 59 328310 RX INTERNAL INSPECTION 119' DW VISUAL INSPECTION OF SELECTED INTERNAL COMPONENTS AND SURFACES AS REQUIRED BY ASME CODES.
1 1
0YSTER C R E E CL - PROJECT L iST INC
- - - _ _ - - - - - -- =
LEGEND' I
NRC I NTEGRATED SCHEDULE
---= -----
NEW PROJECTS.
- BA NUMBER CHANGE CATEGORY
'C' PROJECTS STATUS AS OF 04JUN92 SORT BY CATEGORY / CYCLE /B#
'OBS BA DESCRIPTION CYCLE /.
CLASSIFICATION YEARS NUMBER.
60' 402CCC OTHER OUTAGE RELATED ACTIVITIES 14R ALL ALL OUTAGE RELATED ACTIVITIES SHCH AS INSPECTIONS, REPAIRS, SURVEILLANCES, MINOR MODIFICATIONS, MOD SUPPORT, ETC.
-61 402901 FEEDWATER SYSTEM IMPROVEMENTS 1hR REL CR NCSR REPLACE ANALOG CONTROL SYSTEM WITH DIGITAL.-
- 62 402925 GENERATOR PROTECTION UPGRADE 14R ISM CR ADD CABLE TRAYS AND CABLING IN THE
-CONTROL ROOM IN PREPARATION FOR 15R 63 402929.1 DIGITAL RECIRC TLOW CONTROL 14R 14R REL
.CR REPLACE CEMAC HARDWARE WITH DIGITAL
-SYSTEM.-
64 402939 DRYWELL EXPOSURE REDUCTION MOC' 14R RAD
- DW
' INSTALL' IMPROVED RIGGING FOR MSSV'S AND EMRV'S.
14R NRR 65 -402951
-H2/02 ANALYZER MODIFICATION' DW
'RB REPLACE lNBOARD TARGET ROCK VALVES, RELOCATE CONTAINMENT ISOLATION VALVES -
PROVIDE APP.J LEAK RATE TEST CONNECTIONS 14R ISM 66 402963
.. LP-A L-O TURBINE BLADE REPLACEMENT TB REPLACEMENT OF LP 1STH STAGE BLADES-
'ON
- A
- LOW PRESSURE TURBINE
A OYSTER CREEK PROJECT L iST I NC LEGEND NRC I NTEGRATED SCHEDULE
.NEW PROJECTS,
==-
- -BA NUMBER CHANGE.
CATEGORY
'C' PROJECTS STATUS AS OF 04JUN92 SORT BY CATECORY/ CYCLE /BA OBS BA DESCRIPTION CYCLE /
CLASS 4F4 CATION YEARS NUMBER
...........__....-=-.
=-.........=- -- ---- =.....
14R REL CORE SPRAY SYSTEM UPGRADE 6T 402996 RB CR
' PROVIDE INOEP. CONTROL SWITCHES FOR PARALLEL INJ VLVS,NEW SMALLER CAPAC. REL VLVS. & PULL-TO-LOCK SWITCHES FOR PUMPS 74R REL 63 408836 VALVE REPLACEMENT.
RB TB-REPLACE SELECTED VALVES IDENTIFIED AS
'HAVlfiG MAJOR DEFICIENCIES.
69 402AGZ SITE EMERG. BLDC. EMERG. POWER SOURCE 15 NRR INSTALL AND CONNECT 500 KVA 480V DIESEL POVERED GENERATOR FOR STANDBY POWER TO THE TECH. SUPPORT CENTUt.
70 323LO5 TURBINE VALVE INSP.-NML-15R 15R MRC INSPECT TURBINE ASSOCIATED VALVES TO BUCKETS ON A,B,&C LP AND OTHER COMPCNFNT AS PRESCRIBEJ BY HML OR MANUF.
71 323LO7 CONTAINMENT ISOLATION VALVE MAINT 15R NRR RB ' DW g
PERFORM CORRECTIVE MAINTENANCE ON l
l CCNTAINMENT VALVES WHICH DO NOT PASS ILRT
-72 323L13 ASBESTOS ABATEMENT 15R ORT:
CB
~~
LEVEL OF' EFFORT ASBCSTOS REMOVAL TO SUPPORT OUTAGE WORK i-73 323L22 -
REFUEL FLOOR-RX DISASSEMBLY / REASSEMBLY 15R MRC f
TASKS ASSOCIATED VITH REACTOR DISASSEMBLY AND REASSEMBLY AND SUPPORTING ACTIVIT!ES l-
l j
' OYSTER CREEK P R O J t: CT L I ST I NG LEGEND 1
NRC I NTEGRATED SCHEDULE
-=-
-- --- -- -=-- -- --
.NEW PROJECTS.
- BA NUMBER CHANGE CATEGO" /
'C' PROJECTS STATUS AS OF 04JUN92 SORT BY CATEGORY / CYCLE /BA
...... ~. _ _
OBS BA DESCRIPT1ON CYCLE /
CLASSIF1 CATION YEARS NUMBER.
=
= - --
- - - - -. = = - - - - - - -
74 323L34 VALVE: MAINT & OVERHAUL 15R MRC RB TB DW CORRECTIVE AND PREDICTIVE MAINT ON
' SELECTED VALVES 15R MRC
REBUILD 35 CRD HYDRAULIC CONTROL UNITS 76 323L47 LPB TURBINE AND GENERATOR INSP-15R
'15R MRC
.TB INSPECT LPB AND GENERATOR AND OTHER
. TURBINE RELATED COMPONENTS FOR NHL REQUIREMENTS AND MANUT. SUGGESTION
.77;-326LO2' OUTAGE ISl-15R 15R NRR ALL-INSPECT HANGERS,9fPING WELDS.&
COMPONENTS TO SATISFY SECTION Xi' REQUIREMENTS 78 326L14.
DRWELL SCAFFOLDING & INSULATION 15R CWC DW INSTALLSCAFFOLD IN D.W. TO SUPPORT ALL.
ACTIVITIES. REMOVE & REINSTALL D.W.
INSULATION. REMOVE SCAFFOLD 79 328ACL RX V lNTERNAL. INSPECTION-15R 3R NRR 119 VISUAL INSPECTION OF SELECTED INTERNAL COMPONENTS AND S'JRFACES AS REQ'D BY ASME CODES.
80,.328AFL CHEMICAL DECON-15R 15R-RAD DW RB PERFORM CHEM DECON OF THE RECIRC AND~
CLEANUP SYSTEMS, AND THE DWEDT TO REDUCE RADIATION LEVELS
M r5 ?-M O
LR CREEK PROJECT L I ST I NG LEGENC NRC 1 NTEGRATED SCHEDULE
- - - - - - - - - - - - - - = - -
NEW PROJECTS.
BA NUMBER CHANGE CATEGORY
'C' PROJECTS STATUS AS OF OlaJUN92 SORT BY CATECORY/ CYCLE /BA CYCLE /
CLASSIF1CATIOf4
-_. ~........
OBS BA DESCRIPT3ON YEARS NUMSER
........ =
. =-
- - - _ =....
81 328AFQ RCS PIP 1NC REPAIR CONTINGENCY TSR REL DV RB CONTINGENCY FOR IGSCC FINDINGS ASSUME TWO OVERLAYS (ONE 10" AND ONE 6")
AND ADD'L-lNSP. SAMPLE OF 19 WELDS 15R ISM 82 328L01 PIPE WALL THINNINC-15R TB RS REMOVE INSULATION,PRFP. SURFACE ar PERFORM UT ON SELECTED PIPING SYSTEMS.
POSSIBLE REPLACEMENT Of FITTINGS / PIPING TSR NRR G3 '402ABQ SQUG MODF IMPLEMENT MODS RESUL1'ING FROM SQUG WALKDOWN IN 15E. SCOPE NOT YET DEF INED.
G4' 402736 DUAL VALVE INDICATION REMCVAL-PH 1 15R ISM CR
'RS REPLACE DOUBLE VALVE INDICATION LIGHTS IN C.R. PNLS 1F/2F, 11F. INGTAL NEW CA8LlalG FRGM R.B. TO C.R.
83.402821 RX RECIRC PUMP 3r MOTOR Vf BRATION MONITRS 15R MRC DW RB CR INST ALI. VIBRATION MONITORING TRANSDUCERS AND SUPPORT EQUIP. FOR 4 RECIRC PUMPS 7-TRANS./ PUMP AND 5 FOR 1 PUMP.
86 402925 GENERATOR PROTECTION UPGRADE.
15R ISM
.TB
' ADD RFLAYS AND ALARMS TO PROTECT THE.
CEN.G PER PJM RECOMMENDATIONS.
87 402939-DRYWELL EXPOSURE REDUCTION MODS.
TSR RAD DW lMSTALL SHIELDING ON VARIOUS COMPONENTS IN THE DRYWELL-
OVSTER C R E E C1 PROJECT L iST I NG
= _ _ - - - - - - -
!.EGEND NRC INTEGRATED 5CHEDULE NEW PROJECTS.-
=
=
BA NUMBER CHANGE CATECORY *~~ 'ROJECTS STATUS AS OF 04JUM92 SORT BY'. CATEGORY / CYCLE /BA
~..........- -
CBS BA DESCRIPTION CYCLE /
CLASSIFICATION YEARS
-NUMBER i
88 402939 DR'tWELL EXPOSURE REDUCTION MOOS.
ISR RAD DW INSTALL IMPROVED EQUIPMENT IN 1-8 SUMP AND HYDROLAZE AND RECOAT 1-8 SUMP 89 402051-H2/O2 ANALYZER MODIF1 CATION' 15R NRR RB CR
-REPLACE EXISTING EQUIPMENT WITH "EXO-SENSOR" EQUIPMENT IN RX BUILDING AND..
CONTROL ROOM, REPLACE SWITCHES.
90 402957 OC #A33 ANALOG CONVERSION 15R REL cRB CR REPLACE 5 IA83 PRESS SWITCHES WITH ANALOG SYSTEM.
91 '402961 OC EDG OUTPUT CONTROL MODIFICATION 15R MPC TB '
- REPLACE THE EX1 STING GOVERNOR WITH A WOODWARD AUTOMATIC CEN LOADING CONTROL.
REPLACE MISC. ELECTRICAL COMPONENTS.-
N - 402966 RECIRC FLOW SCRAM ELECTRONICS REPLACEM'T 15R ORR RB CR REPLACE EXISTING ELECTRONICS WITH DIGITAL ELECTRONIC EQUIPMENT.
93-408L24" VALVE REPLACEMENT-15R 15R REL
- RB TB DW REPLACE SELECTED VALVES IDENTIFIED AS HAVING hAJOR DEFICIENCIES 94 1408825 CONDENSER VALVE REPLACEMENT-15R MRC TB-
' REPLACE 2 CONDENSER BACKWASH VALVES l
,c l
OYSTER CREEK PROJECT L iST I NG 1
l LECEND NLC INTEGRATED 5CHEDULE NEW PROJECTS.
=
i
- BA NUMBER CHANGE I
CATEGORY
'C' PROJECTS STATUS AS OF OlaJUM92 SORT SY CATECORY/ CYCLE /BA OBS BA -
DESCRIPTION CYCLE /
CLASSIFICATION YEARS NUMBER
___.=----- --______.. _____
95 323LO3 LPC TURBINE INSP.-16R 16R MRC TB INSPECT LPC AND OTHER TURBINE RELATED COMPONENTS FOR NML NML REQulFEMENTS AND MANUF. SUGGESTION 96 32?LO6 TURBINE VALVE INSP.-NML-16R -
16R MRC INSPECT TURBINE RELATED VALVES TO SUPPORT NML REQUIREMENTS 97 323LOS -
CONTAINMENT ISOLATION VALVE MAINT 16R MRR PERFORM CORRECTIVE MAINTENANCE ON VALVES WHICH DO NOT PASS TE_ ILRT 98 323L11s ASBESins ABATEMENT 16R ORR CB LEVEL OF EFFORT TO REMOVE ASBESTOS
-TO SUF' ORT OUTACE WORK
-99 323L23 REFUEL FLOOR RX DISASSEMBLY / REASSEMBLY 16R MRC 119 TASKS ASSOCIATED WITH REACTOR DISASSEMBLY AND REASSEMBLY AND SUPPORTING'#CTIVITIES 100 323L35 VALVE MAINTENANCE & OVERHAUL 16R MRC RB-
-TB DW PERFORM. CORRECTIVE AND PREDICTIVE MAINT ON SELECTED VALVES 16R MRC-101 323L39 CRD HCU REBUILD RB-l:
REBUILD 35 HYDRAULIC CONTROL UNITS
[.
O OY$TER C R E E CI PROJECT L iST I NG 1
l LEGEND.
NRC i NTEGRATED SCHEDULE
~*
NEW PROJECTS.
- - - - - - - - - = - -
=-
BA NUMBER CHANGE.
CATEGORY
'C' PROJECTS STATUS AS OF 04JUN92 SORT BY CATEGORY / CYCLE /BA 08S BA DESCRIPTION CYCLE /
CLASS 1FiCATION YEARS NUMBER 102 326LO3 OUTAGE Ist-16R 16R NRR
'ALL INSPECT HANGERS, PIPING WELD,&
COMPONENTS TO SATISFY SECTION XI.
REQUIREMENTS 103 326L15 DRYWELL SCAFFOLDING & INSULATION 16R CWC DW INSTALL SCAFFOLD'iN D.W. TO SUPPORT ALL ACTIVITIES. REMOVE & REINSTALL D.W.
.lNSULATION. REMOVE SCAFFOLD PIPE WALL THINNING-16R 16R ISM 104 328LO2 RB - TB REMOVE INSULATION,PP.EP SURFACES &
P7R50RM UT ON SELECTED PIPING SYSTEMS.
J.lBLE REPLACEMEhT OF FITT!NGS/ PIPING 105 '328LO5 RX. VESSEL INTERNAL' INSPECTION 16R NRR
-119 VISUAL INSPECTION OF SELECTED INTERNAL COMPONENTS AND SURFACES AS REQUIRED BY
'ASME CODES-l l-106 32'8LO9 RCS PIPING REPAIR CONTINGENCY-16R-16R REL RB DW CONTINGENCY FOR IGSCC FINDINGS 107 402ABQ SQUG MODS 16R mMR IMPLEMENT MODS RESULTING FROM SQUG WALKDOWM-IN 15R. SCOPE NOT YET DEFINQ 106 402819 RECIRC PL*P MOTOR RTD CIRCUlTS UPC.D 16R MRC DW RB23 REPLACE PTO CABLES ON ALL 5 RECIRC PLHP MOTORS ' FROM MOTOR JUNCTION BOX TO PENETRATION OUTSIDE DW.
OYSTER CREEK PROJECT L IST I NG
. = _ - - -....... -
LEGEND NRC I NTEGRATED
$CHEDULE
-NEW PROJECTS.
- - - - - - - = - -
- BA NUMBER CHANGE CATEGORY
'C' PROJECTS STATUS AS OF 04JU9t?2
- SORT BY CATEGORY / CYCLE /BA
--=
OBS BA DESCRIPTION CYCLE /
CLASSIF8 CATION YEARS NUMBER
..=
109. 402948 LP TURB C LAST STAGE BLADE INSTALLATION 16R REL TB REPLACE LAST STAGE BLADES IN LP TURBINE "C" BLADE FAILURE CONCERNS.
16R REL 110 408L25 VALVE REPLACEMENT-16R RB TB DW REPLACE SELECTED VALVES IDENTIFIED AS HAVING DEFICIENCIES 111 40905T SIMULATOR F4 iliTY 87-92 NRR CONS *RUCT A - TMI-TYPE SIMULATOR BLDG AT O.C. FOR SIMULATOR AND SPT.
112~ 402880 0.C. FUEL POOL CORE-OFF LOAD (STUDYJ 87 ORR
' E' STABLISH ADDITIONAL SPENT FUEt.
.STORACE CAPACITY.FOR FULL CORE. OFFLOAD BEYOND 1994 AT O.C.
113 402943-CONFIGURATION MANAGEMENT-DBD 1991-92 91-92 ISM DEVELOPMENT OF OC SYSTEM DESIGN BASES.
PERFORM SSF'S AND IMPROVE DKAWING LEGIBILITY 114 328325
' FW/CRD'I NOZ MOCK-UP THERMAL F ATtGUE CRAC 92 NRR 8NSTALL 14 THERMAL FATIGUE CRACK IMPLANT INTO THE FW at CRDR NOZZLE MOCKUP. UTL TO PERFORM DEMO.UT TO DETECT ar SIZ'. CRACKS _
-115 -407244 REPLICA SIMULATOR MODS 92 NRR UPGRADE THE SIMULATOR TO MATCH PLANT MOOS AS APPLICABLE.
B O Y.S T E R CREEK PROJECT L iSTI NG
._ __ - - _. = _ _ _
LEGEND NRC 8 NTEGRA TED SCHEDULE NEW PROr CTS.
--4--..
--=.- -----
- BA NUMBER CHANGE CATEGORY
'C' PROJECTS STATUS AS OF 04JUN92 SORT BY CATECORY/ CYCLE /BA OBS BA DESCRIPTION CYCLE /
CLASSIFICATION YEARS NUMBER I
116. 409229 hUMARC PROCUREMENT INITI ATIVE :.
92-93 NRR IMPROVEMENTS TO PROCUREMENT QA TO MEET l
THE. REQUIREMENTS OF THE-NUMARC PROCURE-l MENT AND NRC CEN LTR.
11T. ?402981 ACCIDENT MANAGEMENT GUIDELINES 92-94 NRR DEVELOP ACCIDENT MANAGEMENT GUIDELINES TO COPE WITH DAMAGED CORE EVENTS (PART OF IPE REQUIREMENTS, G.L. 88-20).
119 328148-O.C. PLANT: LIFE ASSURANCE a: EXTENSION' 92-95 REL DEVELOP 3-PHASE PLEX PLAN PHASE 1 TO DETERMINE FEASIBILITY AND COST /
ANALYSIS OF PLEX.
-119. 402982 INDIVIDUAL PLANT. EXAM.
EXTERNAL EVENTS 92-95 NRR PERFORM IPE ANALYSIS OF EXTERNAL EVENTS FOR SEVERE ACCIDENT VULNERABILITIES.
l 120 -402980 CONFIGURATION MANAGEMENT-DBD 92 92-96 ISM
- DEVELOPMENT OF OC SYSTEM DESIGN BASES PERFORM 4 TO 5 DBD'S PR YEAR OVER. 5
. YEARS.
' il21 40993E.
REPLICA SIMULATOR MODS 93 NRR UPGRADE THE SIMULATOR TO MATCH Pt.5MT -'
MODS AS APPLICABLE
'122 40994B
. REPLICA SIMULATOR MODS 94 M'R UPGRADE THE SIMULATOR TO MATCH PLANT
- MODS AS APPLICABLE a
a OYSTER - C R E E CC PROJECT LI 5T I NC LEGEND l
NRC I NTEGRATED S C'H E D U L E NEW PROJECTS.
- , BA NUMBER CHAMGE-CATEGORY 'C' PROJECTS STATUS AS OF 04JUM92 SORT BY CATEGORY / CYCLE /BA
-=--. -...
OBS BA PLSCRIPTION CYCLE /
CLASSIFICATION YEARS NUMBER 123 :409L10 REPLICA SIMULATOR MODS 95 MRR i
MODsFY THE SIMULATOR AS NECESSARY -TO MAINTAIN LIKENESS WITH CONTROL ROOM AS REQUIPED 1.
I.
I h.
I
._.___1_
' ' - ~ ~
o g
ABC Classifications a)
Meet NRC Reoutrementi (NRR) - Activities that a) must be carried out to fulfill specific NRC requirements or b) have been committed to the NRC by the Company or c) are such that if not accomplished would result in an NRC non compliance even though the specific activity is not required by the NRC.
b) tieet Environmental Reautrements (ERR) - Activities that a) are specifically required by environmental regulatory agencies (Stato and Federal) or b) have been committed to environmental agencies by the Company or c) are such that if not accomplished would result in a regulatory non-compliance even though the specific activity is not required by an environmental regulatory agency, c)
Meet Other Reouirements (ORR) - Activities not covered by the NRC or environmental requirements but that are required by local, state, or federal ordinances, codes, court order or lawsuit settlement, or other guidance to which the Company is committed or if not accomplished would result in a violation of that ordinance, code or guidance, court order, etc.
d)
Increase Safety Marains (ISM)
Activities that, if implemented, will improve nuclear plant or personnel safety but are neither required for regulatory compliance nor required by safety regulations, codes or
- guidance, e)
Decrease Environmental Effects (E) - Activities that, if implemented, will result in an improved environmental quality but are neither required for regulatory compliance nor required by environmental regulations, codes or guidance, f) imatqve Radicloaical Conditions -(RAD) - Activities that, if implemented, will result in improved radiological conditions, lower man rem exposure rates, or radwaste control / reduction but are neither required for regulatory compliance nor required by radiological regulations, codes or
- guidance, g)
Maintain Reliability / Capability (MRC) - Activities that, if implemented, will maintain power production at existing levels by preventing deterioration of plant systems or equipment.
Includes activities.in response to national codes and standards, insurance. policies,. equipment vendor s)ecifications or nuclear industry high unavailability equipment data wit 1out which the plant could not operate prudently, h)
Imorove Reliability / Capability (REL) - Activities that, if implemented, will increase power generation by improving availability or capacity.
factor to maximize energy output.
0 ABC Classifications (continued) i)
Imorove Ooerational Effectiveness (10E) - Activities that, 4f implemented, will improve staff efficiency or provide a direct economic payback in terms of reduced operating / maintenance costs.
j)
Improve Personnel _ Facilities (FAC) - Activities that, if implemented, will improve working conditions and the usefulness of personnel facilities, k)
Provide Continaency/B1tnket (CUI) - Activities that, if implemented, will provide management flexibility to respond in a timely manner to emergent work requirements or the ongoing requirements-to procure, replace or
.epair minor items essential to support routine operations.
1)
Imoroves Hgit Rate Performance (HRP) - Activities, that, if implemented, will_ increase power production by enhancing the heat rate efficiency, e
O ATTACHMENT B OYSTER CREEK NUCLEAR GENERATING STATION NRC INTEGRATED SCHEDULE SEMIANNUAL UPDATE Cateaory "A" Proiects COMPLETIONS:
None SCHEDULE CHANGES:
- 402011 Replica Simulator Certification On April 10, 1992, NRC granted GPUN's exemption request on 10 CFR 55.45. The exemption includes two requirements:
- 1). A one-year extension until December 31, 1992_to complete Replica Simulator Certification, and
- 2) Continue interim operator training on the Nine Mile Point Unit I simulator.
- x. -
Cateaory "B" Pro.iects COMPLETIONS:
328304 NUMARC Commercial Grade Dedication and Procurement Initiative implementation.
DELET10NS:
328030 Human Engineering changes to the control room front panels were completed during the llR outage, per NUREG 0737.
The remaining workscope to refurbish rear panels is being cancelled because project priorities available resources, and minimal safety significance indicate that continued work on this project is not justified.
402808-This project was undertaken to resolve deficiencies identified in the Control Room Design Review.
In order to address these deficiencies, the preferred alternative was to convert the existing SIGMA computer room into a GSS office. The costs for GSS office conversion are approximately a factor of four higher than what was envisioned at the time the control room design review recommendations were made. - After further evaluation, the benefits do not justify the capital expenditure from a-control room design review standpoint.
SCHEDULE CHANGES:
402900 Isolation condenser piping stress improvement has been rescheduled to the 15R outage based on, the technical justification provided in GPUN letter to the NRC, C321-92-2080,. dated April 21, 1992.
408116' The Access Control Upgrade project will be-completed in two parts.
In accordance with 10 CFR 73.55 requirements, the increased protection level of the control room will be implemented in Cycle 14.
However,- the upgrade of key card readers / alarm units for selected vital areas in the reactor building will be completed in Cycle 16 due to priority and available GPUN resources.
OTHER CHANGES:
402LO7 Drywell Corrosion-Inspection.
This activity will be done under the Plant functional budget during the 15R
- Outage, pursuant: tu our continuing
- mmitment established in GPUN Letter No. C321 3.-
C120739
e CLteacry "C" Pro.iects ADD 111DNS:
As denoted by
- next to the project title in Attachment A.
DELETIONS:
323594 Life of System Maintenance Planning (LOSMP) 328305 Drywell Serviceability Extension Analysis 402636 Wide Range Neutron Monitoring System 402939 Drywell Exposure Reduction Mods (Install Drywell Services for Breathing / Service Air and Water) 402973 TBCCW Heat Exchangers SCHEDULE CHANGES:
402821 Recirculation Pump and Motor Vibration Monitors has been changed from the 14R Outage to the 15R Outage due to priority and available GPUN resources.
OTHER CHANGES:
The following B/A numbers have been changed:
PREVIOUS NEW 0B1.1 TITLE BJA Blh 47 0.W. Scaffolding i Insulation 326L13 322036 66 Core Spray System Upgrade 402AHE 402996 402823 Groundina & Liahtnina Protection Grounding for the maintenance and warehouse buildings was added to Cycle 13 scope.
402943 Confiauration Manaaement - D901991 Years changed from 91 to '91-92 for carry over of DBD's scheduled in 1991 into 1992.
409057 Simulator Facility Years changed from 87-91 to 87-92 to account for an additional modification to the building in 1992.
C120739
ATTACHMENT B OYSTER CREEK NUCLEAR GENERATING STATION NRC INTEGRATED SCHEDULE SEMIANNUAL UPDATE Catecory " A" Pro-lect s COMPLETIONS
- None SCHEDULE CHANGES:
402011 Replica Simulator. Certification On April 10, 1992, NRC granted GPUN's exemption request on 10 CPR 55.45.
The exemption includes two requirements:
- 1) A one-year extension until December 31, 1992 to complete Replica Simulator Certification, and
- 2) Continue interim operator training on the Nine Mile Point Unit i simulator.
e Cateoorv "D" ffddtfJa COMPLETIONS:
328304 NUMARC Commercial Grade Dedication and Procurement Initiative Implementation.
2:
'e JELETIONS:
402808 This project was undertaken to resolve deficiencies identified in the Control Room Design Review.
In y.
order to address thene deficiencies, the preferred alternative was to convert the existing SIGMA computer room into a GSS of fice. The costs for GSS k
office conversion are approximately a facecr of V
four higher than what "as envisionSs at the time
._f the control room design - ) view recommen 'ations were A -
made.
After further h sluation, the benefite do nct justify the capital expenditure from a control N
room design review standpoint.
W c_ -,
cafECULE CHANGES:
402900 Isolation condenser piping as-improvement has been rescheduled to the 15R outage based on the techt.ical justification provit'ed in CPUN J etter to the NRC, C321-92-2080, dated April 21, 1992.
408116 The Access Control Upgrade project will be completed in two parts.
In accordance with 10 CFR 73.55 requirements, the increased protection level of the control room will be implemented in Cycle 14.
However, the upgrade of key card q
readers / alarm units for selected vital areas in the
/
reaccer building will be completed in cycle 16 due to priority and available GPUN resource..
328030 Human Engineering changes to the control room front OTHER CHs.
panels were completed during the 11R outage, per NUK' 0737.
The remaining workscope to refurbish rear panels is being reviewed for possible reduction in scope.
Higher project priorities, 3
limited available resources, and minimal safety significanco indicate that tuntinued work on this project may not be justified.
402LO7 Drywell corros.
>n Inspection.
This activity will be done under toe Plant functiont1 budget during the 15R Outage, pursua7t to our continuing commitment established in GPUN Letter No. C3'21 t 2-s 2163.
C120739
(_____
I l
)
Qingpry "C" Proiecia
,,u e s.., n,.
ADDITIONS:
As denoted by
- next to the project title in Att Schment A.
DELETIONS:
323594 Life of System Maintenance Planning (LOSMP) 328305 Drywell Serviceability Extansion Analysis 402636 Wide Range Neutron Monitoring System 402939 Drywell Expumure Reduction Mods (Install Drywell Services for Breathing / Service Air and Water) 402973 TBCCW Heat Exchangers SCHEDULE CRANGES:
402B21 Recirculation Pump and Motor Vibration Monitors has been changed from the 14R Outage to the ISR Outage due to priority and available GPUN resources.
i OTHER CHANGES:
402823 Groundinc & Liohtnino Protectio,n Grounding for the maintenance and warahouse buildings was added to Cycle 13 scope.
402943 ponfiouration Manacement - DBD 1991 Years revised frem 91 to 91-92 for carry over of DBD's scheduled in 1991 into 19'J2.
402982 IPE - E5ternal Events Years revised from 92-94 to L'-95.
409057 Simulator Facility Years revised f rom 87-91 to 87-92 to account f or an additional modification to the building in 1992.
The following B/A numbers have been changed:
PREVIOUS NEW OBS #
TITLE R/h El.h 48 D.W.
Scaffolding & Insulation 3Q6L13 322036 67 Core Spray System Upgrade 402AHE 402996 C120739
_ _ _ _ _ _ - _ _ - _ _