Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101E540 + (10:03:12, 13 December 2024)
- ML20101E538 + (10:03:13, 13 December 2024)
- ML20101E533 + (10:03:13, 13 December 2024)
- 05000397/LER-1984-118, :on 841111 & 13,severe Fluctuations Detected in Div II Uninterruptable Power Supply.Caused by Defective Div II Inverter.Inverter Repaired & Returned to Svc + (10:03:15, 13 December 2024)
- ML20101E524 + (10:03:16, 13 December 2024)
- NG-96-0522, Provides Bases for the Removal of Seventeen MOVs from GL 89-10 Program Scope at DAEC + (10:03:17, 13 December 2024)
- ML20101E510 + (10:03:18, 13 December 2024)
- 3F1284-14, Forwards Application for Amend to License DPR-72,consisting of Rev 1 to Tech Spec Change Request 121.Rev Provides Addl Restrictions to Auxiliary Bldg Ventilation Sys Inoperability + (10:03:19, 13 December 2024)
- ML20101E507 + (10:03:19, 13 December 2024)
- RBG-19688, Final Deficiency Rept DR-223 Re Installation of Bolts W/O Hardened Steel Washers Under Bolt Heads as Required for Mechanical Snubbers Supplied by Bergen-Paterson.Snubber Bolts Adequate.Condition Not Reportable Per 10CFR50.55(e) + (10:03:20, 13 December 2024)
- ML20101E490 + (10:03:21, 13 December 2024)
- 05000331/LER-1995-013, :on 951221,HPCI Inoperable.Caused by Water in Turbine Steam Line.C/A:Detailed Analysis of HPCI Operability Performed,Will Be Completed by 960501 + (10:03:23, 13 December 2024)
- ML20101E462 + (10:03:24, 13 December 2024)
- ML20101E456 + (10:03:24, 13 December 2024)
- ML20101E444 + (10:03:25, 13 December 2024)
- FVY-84-146, Application to Amend License DPR-28,changing Tech Specs to Incorporate Addition of post-accident Instrumentation & Associated Limiting Conditions for Operation & Surveillance Requirements,Per NUREG-0737.Fee Paid + (10:03:26, 13 December 2024)
- ML20101E437 + (10:03:27, 13 December 2024)
- ML20101E438 + (10:03:27, 13 December 2024)
- ML20101E434 + (10:03:28, 13 December 2024)
- ML20101E421 + (10:03:29, 13 December 2024)
- ML20101E432 + (10:03:29, 13 December 2024)
- ML20101E420 + (10:03:30, 13 December 2024)
- ML20101E418 + (10:03:31, 13 December 2024)
- ML20101E409 + (10:03:31, 13 December 2024)
- ML20101E406 + (10:03:32, 13 December 2024)
- ML20101E405 + (10:03:33, 13 December 2024)
- ML20101E402 + (10:03:34, 13 December 2024)
- ML20101E401 + (10:03:34, 13 December 2024)
- ML20101E397 + (10:03:35, 13 December 2024)
- ML20101E394 + (10:03:36, 13 December 2024)
- ML20101E389 + (10:03:36, 13 December 2024)
- ML20101E385 + (10:03:37, 13 December 2024)
- 1CAN069204, Monthly Operating Rept for May 1992 for Arkansas Nuclear One Unit 1 + (10:03:38, 13 December 2024)
- ML20101E377 + (10:03:39, 13 December 2024)
- 2CAN069202, Monthly Operating Rept for May 1992 for Arkansas Nuclear One Unit 2 + (10:03:40, 13 December 2024)
- ML20101E373 + (10:03:40, 13 December 2024)
- ML20101E366 + (10:03:41, 13 December 2024)
- 05000315/LER-1984-025-01, :on 841108,firewater Ring Header Valve Surveillance Not Performed Per Tech Spec Requirements.Caused by Misidentification & Poor Labeling of Valves.Pipes & Valves Properly Labeled & Diagrams & Descriptions Corrected + (10:03:43, 13 December 2024)
- ML20101E357 + (10:03:44, 13 December 2024)
- ML20101E354 + (10:03:45, 13 December 2024)
- 05000315/LER-1984-027, :on 841111,fire Watch Performed 25 Minutes Late in Hourly Insp of Inoperable Fire Door Protecting Reactor Cable Tunnel.Caused by Personnel Unfamiliarity W/Bldg Layout & Inadequate Briefings + (10:03:49, 13 December 2024)
- 05000315/LER-1984-026-01, :on 841108,8 H Grab Sample Not Taken & Analyzed for Gross Activity Per Tech Spec Requirements. Caused by Deficiency in Communications.Personnel Reinstructed on Notification Procedures + (10:03:51, 13 December 2024)
- ML20101E326 + (10:03:53, 13 December 2024)
- ML20101E314 + (10:03:54, 13 December 2024)
- ML20101E301 + (10:03:55, 13 December 2024)
- ML20101E300 + (10:03:56, 13 December 2024)
- ML20101E291 + (10:03:57, 13 December 2024)
- RBG-19691, Interim Deficiency Rept DR-218 Re Piston Rods in Brown- Boveri Electric,Inc Type 5HK Circuit Breakers.Next Rept Will Be Provided by 850228 + (10:03:58, 13 December 2024)
- ML20101E284 + (10:03:59, 13 December 2024)
- ML20101E280 + (10:03:59, 13 December 2024)
- RBG-19664, Interim Deficiency Rept DR-210 Re Model 510 DU Card Files Supplied by Rosemount.Next Rept Will Be Provided by 850227 + (10:04:00, 13 December 2024)
- ML20101E264 + (10:04:07, 13 December 2024)