Corrected Monthly Operating Rept for Apr 1992 for Jm Farley Unit 2
ML20101E409
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/30/1992
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
Shared Package
ML20101E395 List:
References
NUDOCS 9206230189
Download: ML20101E409 (1)


Text

+ u -ya w s u..a e m n .. - w s -. .s < <-

r 4;g OPERATING DATA REPORT DOCKET NO. 50-364

  1. DATE May 6, 1992 COMPLETED BY D. N. Morey TELEPHONE (205)899-5156 OPERATING STATUS-Notes

- 1.-Unit l Names. Joseph H.-Farley--- Unit 2 1) Cumulative' data since n ~2. Reporting Period: April 1992 7-30-81, date of

.3. Licensed Thermal Power (MVt) - 2,652 commercial operation.

4. Nameplate Rating (Gross HWe): '860
5. Design Electrical Rating (Net HVe):- 829 6.< Maximum Dependable Capacity (Gross MVe): 864.3
7. Maximum Dependable Capacity (Net HVe): 824.0
8. If Changes Occur in Capecity Ratings (Items Number 3 Through 7) Since Last Report, -

.Give Reasons: N/A 9.-Power Level To Which Restricted,;-If Any (Net MVe):_ N/A

10. Reasons For Restiictions, If:Any: -N/A l

This Month Yr-to-Date Cumulative- ,

11. Hours In" Reporting-. Period 719.0 2,903.0 94,272.0

-12.CNumber Of Hours Reactor Vas Critical 0.0 1,565.1 80,429.4

13. Reactor Reserve Shutdown Hours- 0.0 0.0 138.0 14;LHours Generator On-Line 0.0 1,546.1 79,474.6 15.' Unit Reserve Shutdown Hours . 0.0 0.0 0.0
16. Gross' Thermal Energy Generated (MVH) 0.0 4,056,228.3 203,025,549.9 17.zGross Electrical Energy Generated-(MVH) 0.0 1,339,768.0 66,635,852.0l-

-18.= Net Electrical Energy Generated:(MVH) (4800) 1,265,154.0 63,199,216.0

19. Unit Service Factorr O.0 -53.3 84.3

'20. UnitLAvailability Factor- 0.0- - '

53.3- 84.3

?21. Unit Capacity Factor-(Using HDC Net)-

. N/A- 52.9- 81.8 22.LUnit Capacity-Factor (Using DER Net) N/A 52.6 80.9-

23.cUnit: Forced Outage Rate - _

0.0 2.3 4.1 t24.rShutdowns. Scheduled Over Next 6 Honths (Type, Date, and Duration of Each):

y _N/A I25.1 1C Shut Down.-At End Of Report Period, Estimated Date of Startup: May 9, 1992

26. Units In Test' Status (Prior.to Commercial Operation):

Forecast. Achieved INITIAL CRITICALITY 05/06/81- 05/08/81 '

INITIAL ELECTRICITY. 05/24/81 05/25/81 '

COMMERCIAL OPERATION 08/01/81 07/30/81 Form 2/30 ,