ML20101E437
| ML20101E437 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 04/30/1992 |
| From: | Ratliff S TENNESSEE VALLEY AUTHORITY |
| To: | |
| Shared Package | |
| ML20101E403 | List: |
| References | |
| NUDOCS 9206230200 | |
| Download: ML20101E437 (2) | |
Text
,.
ENCLOSURE 2 REVISION TO APRIL 1992 e
MONTilLY OPERATING REPORT f-9206230R00 920612 PDR ADOCK 05000259
.R pyg
n.
n.
+-
.OPERATI:G DATA'CEPORT e
' DOCKET to.
50-260 PCEPARED BY. S. A. eettiff 1ELEPHONE (2051 729-2937
' OPERATING STATUS-jNotes l
1.
Unit Name:
Bre9ns' Ferry Unit Two'
'l l
2.
Reporting Period:
April - 1992 (Revision)
-l l
3.
Licensed' Thermal Power (MWt): 3293 j
l 4
Nameplate Rating'(Gross.MWe): 1152 l
l S.
Design Electricat Rating (Net MWe):
1065' l
l 6,
Maximum Depandable Capacity (Gross Mue): '1098.4 ~
]
l 7.
Maximum Dependable capacity (Net MWe): 1065 l
l 8.
If Changes occur in Capacity Ratings (Etems Number 3 Through 7) Since Last Report, Gise Reasons:
N/A 9.
Power Level To Which Restricted, ii.Any (Net MWe):
N/A 10; Reasons For. Restrictions, if,Any:
N/A This Month Y r-t o-D a t e Cumulative
- 11. Hours In Reporting Period.
719.0 2903.0 150534
- 12. Number of Hours Reactor Was Critical 687.2 2714.9 63221
- 13. Reactor Reserve Shutdown Hours 0
0 14200 14 Hours Generator On-Line
'678.1 2658.9 61126
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWM) 2130666.7 8363443.0 173439298
- 17. Gross Electrical Energy Generated (MWH) 716760.0 2842060.0 57511868'
- 18. Net Electrical' Energy Generated (MVM)
' 699373.0 2772271.0 55582530
- 19. Unit Service Factor 94.3 91.6 10.6
- 20. Unit Availability Factor 94.3 91.6 40.6
'21. Unit Capacity Factor (Using MDC Net)
'91.3 89.7 34.7
- 22. Unit Capacity Factor (Using DER Net) 91.1 89.7 34.7
- 23. Unit Fcrced Outage Rate 5.7 1.5 52.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A PLLIC207/449/12
-